JOHNSON, E.

Operated by ROBERTS & MURPHY, INC. (P-5 717690) in the BETHANY (TRAVIS PEAK OIL) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12392District 06Field 07527760OilCasinghead gasSaveExport
Value, all time
$282 k
Jan 1993 – Mar 2015
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 26 leases and 28 wells, and the rule below applies to all of them.

Discovered
1953-03-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: NET GOR 5OO MCF/DAY PER DKT 6-75,004 EFF. 3/31/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition4,861 bbl$104,064
Casinghead gasProduction125,443 Mcf$177,477
Total$281,541

74,443 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2646, -94.1285. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles.

32.26457, -94.12850 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
8,061 ft
2 wells filed one
Completion to plug
15.0 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,321 and 9,800 ft, median 8,061 ft, over the 2 wells that filed a depth.

Completions filed
Jun 1988 – Nov 1993
2 of 2 wells
Plug dates filed
Aug 1997 – Aug 2014
2 of 2 wells

Last completion to plug: a median of 15.0 years across the 2 wells that filed both dates, with the middle half between 9.3 years and 20.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-3653124249,800 ftNov 1993Aug 1997Yes
42-3658018626,321 ftJun 1988Aug 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 201495086.164.05$8,185
Aug 2014010089.394.04$404
Jul 2014010096.564.18$418
Jun 2014010098.164.74$474
May 2014010094.734.73$473
Apr 2014010095.944.81$481
Mar 2014013495.895.06$678
Feb 2014010097.406.19$619
Jan 2014020890.404.86$1,011
Dec 2013010091.824.35$435
Nov 2013020988.853.74$781
Oct 2013024797.423.78$934
Sep 20130252104.113.72$937
Aug 20130260104.253.52$916
Jul 20130102102.523.72$379
Jun 2013010994.403.93$429
May 2013010294.834.15$423
Apr 2013010093.964.28$428
Mar 2013010993.623.91$427
Feb 2013010591.233.42$359
Jan 201302291.603.42$75
Dec 2012010486.773.42$356
Nov 2012011586.953.62$417
Oct 201205989.383.40$201
Sep 201216017294.672.92$15,649
Aug 2012022992.662.91$666
Jul 2012010085.133.02$302
Jun 2012021679.822.52$544
May 2012010891.612.49$269
Apr 20120202101.652.00$403
Mar 20120253105.052.22$562
Feb 20120179101.102.57$460
Jan 2012018498.092.73$503
Dec 2011011196.873.24$360
Nov 2011018695.723.31$616
Oct 2011026784.983.65$974
Sep 2011013183.623.99$522
Aug 201102683.404.15$108
Jul 201109594.144.52$429
Jun 2011017392.904.64$803
May 201106298.134.40$273
Apr 2011011105.964.33$48
Mar 201106196.364.06$248
Feb 201108085.644.18$334
Jan 201108786.504.59$399
Dec 201006885.734.35$296
Nov 201008380.843.80$315
Oct 201008378.103.51$291
Sep 201007372.633.98$291
Aug 201008773.684.42$384
Jul 201008172.554.74$384
Jun 201007670.364.91$373
May 201007471.124.24$313
Apr 201008481.694.12$346
Mar 201006678.394.39$290
Feb 201004473.585.44$239
Jan 201005274.365.96$310
Dec 200902971.445.48$159
Nov 200902074.593.75$75
Oct 200902872.544.11$115
Sep 200902865.543.06$86
Aug 200902867.423.22$90
Jul 200906261.133.46$215
Jun 200901566.163.90$58
May 200902154.743.93$82
Apr 200903046.773.59$108
Mar 20090342.144.06$12
Feb 200904332.814.63$199
Jan 2009010335.865.37$553
Dec 200802237.105.98$132
Nov 20080155.496.86$7
Oct 20080475.246.92$28
Sep 2008014101.767.88$110
Aug 200804114.228.48$34
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 2008014123.1711.57$162
Apr 200804110.3110.45$42
Mar 200801101.909.66$10
Feb 200802692.538.77$228
Jan 20080090.388.21$0
Dec 200706788.337.30$489
Nov 200708991.677.29$649
Oct 200704282.856.92$291
Sep 200706275.846.24$387
Aug 2007011569.066.39$735
Jul 200702470.906.39$153
Jun 200703762.007.55$279
May 200706358.747.85$494
Apr 200702259.617.81$172
Mar 2007015156.927.30$1,103
Feb 2007011855.108.22$969
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 2006010254.906.01$613
Sep 2006012360.085.04$620
Aug 2006011968.717.34$873
Jul 2006011069.376.34$698
Jun 2006011766.286.38$747
May 2006013566.016.42$867
Apr 2006014164.397.36$1,038
Mar 2006013856.707.08$977
Feb 2006011757.597.75$907
Jan 2006015260.598.93$1,358
Dec 2005014654.9413.42$1,959
Nov 2005014254.6910.59$1,504
Oct 200506258.3413.80$855
Sep 200507561.4512.08$906
Aug 200506061.519.80$588
Jul 200507355.697.84$573
Jun 200508352.337.38$613
May 200505245.226.65$346
Apr 200507149.207.36$523
Mar 200509150.377.15$651
Feb 200504445.226.31$278
Jan 200501543.166.32$95
Dec 200404439.866.75$297
Nov 200404845.286.33$304
Oct 200406949.706.52$450
Sep 2004016943.245.28$893
Aug 2004016742.375.55$927
Jul 2004017438.286.08$1,059
Jun 2004011936.106.43$766
May 200409437.486.49$610
Apr 200401534.475.86$88
Mar 20040034.365.53$0
Feb 20040732.455.51$39
Jan 200401632.036.30$101
Dec 200301230.266.30$76
Nov 200303328.804.60$152
Oct 200302928.174.76$138
Sep 200301126.314.75$52
Aug 200303229.765.13$164
Jul 200302629.415.17$134
Jun 200301328.565.98$78
May 200301726.595.97$102
Apr 20030626.675.41$32
Mar 20030631.146.10$37
Feb 20030533.487.93$40
Jan 200301130.315.58$61
Dec 20020626.914.85$29
Nov 200201824.664.14$74
Oct 20020726.464.23$30
Sep 20020627.443.64$22
Aug 200202525.963.16$79
Jul 200203824.583.06$116
Jun 200203723.733.34$124
May 2002011224.663.58$401
Apr 2002012323.653.51$432
Mar 200221511622.003.10$5,090
Feb 2002021218.222.38$504
Jan 2002050717.172.38$1,204
Dec 2001044916.932.36$1,062
Nov 2001054818.072.41$1,318
Oct 2001059919.782.53$1,515
Sep 2001056124.262.25$1,263
Aug 2001070424.873.05$2,149
Jul 2001063223.933.20$2,021
Jun 2001052624.563.82$2,012
May 2001060725.524.31$2,615
Apr 200112161424.685.34$6,262
Mar 2001058724.545.38$3,156
Feb 2001059627.755.77$3,437
Jan 2001050127.478.40$4,208
Dec 2000060626.889.12$5,528
Nov 2000052732.215.66$2,982
Oct 2000050631.235.15$2,604
Sep 2000055431.875.19$2,873
Aug 200018060729.644.54$8,091
Jul 2000056228.534.09$2,298
Jun 2000058029.304.40$2,550
May 2000040327.263.68$1,483
Apr 2000078424.513.12$2,443
Mar 2000067228.422.86$1,922
Feb 2000054427.622.73$1,483
Jan 2000039925.272.48$990
Dec 199918061824.282.42$5,868
Nov 1999037223.192.43$905
Oct 1999062020.982.80$1,738
Sep 1999044521.752.62$1,165
Aug 1999039619.262.88$1,139
Jul 1999020617.892.37$489
Jun 1999045715.942.36$1,079
May 1999047115.792.32$1,093
Apr 1999042115.102.21$930
Mar 1999067912.471.84$1,248
Feb 19991996539.981.82$3,173
Jan 1999068410.381.90$1,300
Dec 199806059.201.77$1,073
Nov 1998070310.892.19$1,537
Oct 1998061212.421.97$1,205
Sep 1998060312.592.08$1,256
Aug 1998061311.301.91$1,169
Jul 1998059911.742.24$1,340
Jun 1998074511.242.24$1,667
May 1998090812.622.21$2,003
Apr 1998076513.042.51$1,917
Mar 199820757112.802.31$3,968
Feb 1998062913.952.30$1,446
Jan 1998069014.702.15$1,487
Dec 1997089416.322.41$2,156
Nov 1997078518.193.09$2,424
Oct 1997076619.253.15$2,413
Sep 1997082817.742.95$2,447
Aug 1997085117.862.55$2,174
Jul 1997088017.582.25$1,977
Jun 1997281,03317.242.26$2,814
May 199720186718.972.31$5,814
Apr 199701,07717.882.08$2,243
Mar 1997089618.951.94$1,737
Feb 199717085820.492.21$5,376
Jan 199701,00323.483.54$3,550
Dec 199601,20423.32$0
Nov 1996097021.97$0
Oct 19961821,67223.31$4,242
Sep 199601,41622.22$0
Aug 199601,59720.26$0
Jul 19961801,27719.55$3,519
Jun 199601,03518.73$0
May 1996099419.43$0
Apr 199618689321.51$4,001
Mar 1996090219.38$0
Feb 1996077916.98$0
Jan 199612987617.07$2,202
Dec 1995078917.19$0
Nov 1995086016.00$0
Oct 199519281015.43$2,963
Sep 1995086216.18$0
Aug 1995099415.92$0
Jul 199541482615.24$6,309
Jun 1995084316.41$0
May 1995096717.56$0
Apr 1995070117.73$0
Mar 1995092516.44$0
Feb 199520493116.58$3,382
Jan 1995097415.92$0
Dec 1994098815.03$0
Nov 19941871,79115.90$2,973
Oct 19941791,30015.58$2,789
Sep 199401,75715.29$0
Aug 199403,43116.13$0
Jul 19941653,35617.56$2,897
Jun 199403,26217.09$0
May 19941823,73015.88$2,890
Apr 199404,32914.14$0
Mar 19943654,82512.46$4,548
Feb 19941783,92912.50$2,225
Jan 1994073112.66$0
Dec 199301,03612.33$0
Nov 1993076214.49$0
Oct 199301,04815.85$0
Sep 19931971,39315.03$2,961
Aug 199301,70115.66$0
Jul 199301,44715.46$0
Jun 199301,40816.79$0
May 199302,02217.68$0
Apr 199301,71618.05$0
Mar 19931651,72018.14$2,993
Feb 199301,24817.90$0
Jan 199301,41616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2014 — as filed, then multipliedworked
Oil                   95 bbl  × $ 86.16 =     $8,185
Casinghead gas         0 Mcf  × $  4.05 =         $0

────────────────────────────────────────────────────
Month total                                   $8,185

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/12392 is the state's own key, not one this site invented.