SMITH, DURWOOD A.

Operated by PHILLIPS, JACK L. CO. (P-5 663109) in the CHAPMAN (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12586District 06Field 17020500OilCasinghead gasSaveExport
Value, all time
$835 k
Jan 1993 – Jul 2006
Value, last 12 filed months
$153 k
at the published price for each month
Months reported
163
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 18 wells, and the rule below applies to all of them.

Discovered
1976-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: 03/28/2006 PER DOCKET 06-0245877.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition20,391 bbl$507,923
Casinghead gasProduction115,699 Mcf$327,312
Total$835,236

43,519 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1168, -94.6248. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11683, -94.62482 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,311 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,311 ft.

Completions filed
May 1989
1 of 1 wells

1 well

42-4013085017,311 ftMay 1989Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (163)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

163 months

Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 200644358956.707.08$29,290
Feb 2006042857.597.75$3,317
Jan 200618058260.598.93$16,105
Dec 200518158754.9413.42$17,819
Nov 200517877954.6910.59$17,983
Oct 200517765058.3413.80$19,293
Sep 200516983461.4512.08$20,459
Aug 200533582261.519.80$28,659
Jul 200517632555.697.84$12,351
Jun 200527660252.337.38$18,886
May 2005048745.226.65$3,239
Apr 2005056049.207.36$4,122
Mar 2005063850.377.15$4,565
Feb 200517167945.226.31$12,018
Jan 2005055843.166.32$3,528
Dec 2004044039.866.75$2,970
Nov 200416267145.286.33$11,583
Oct 2004063249.706.52$4,118
Sep 200416556643.245.28$10,125
Aug 2004071842.375.55$3,985
Jul 200417382738.286.08$11,654
Jun 200417365836.106.43$10,478
May 2004070237.486.49$4,559
Apr 200416475634.475.86$10,082
Mar 200417867334.365.53$9,838
Feb 2004058532.455.51$3,223
Jan 200416877432.036.30$10,257
Dec 200316162430.266.30$8,804
Nov 2003064528.804.60$2,964
Oct 200316667728.174.76$7,899
Sep 200334283726.314.75$12,973
Aug 2003083729.765.13$4,294
Jul 200317585729.415.17$9,578
Jun 2003050628.565.98$3,027
May 2003053226.595.97$3,177
Apr 2003065126.675.41$3,520
Mar 200317863231.146.10$9,396
Feb 2003054233.487.93$4,296
Jan 200317572630.315.58$9,357
Dec 2002048126.914.85$2,335
Nov 2002054524.664.14$2,255
Oct 200214358626.464.23$6,262
Sep 200218067127.443.64$7,378
Aug 2002059225.963.16$1,873
Jul 200217161024.583.06$6,071
Jun 200215572023.733.34$6,082
May 200217482524.663.58$7,248
Apr 200217765023.653.51$6,469
Mar 2002066322.003.10$2,057
Feb 200217338018.222.38$4,055
Jan 200215677517.172.38$4,520
Dec 200132693416.932.36$7,728
Nov 200118165318.072.41$4,841
Oct 2001068419.782.53$1,730
Sep 20011741,06924.262.25$6,628
Aug 20011811,09424.873.05$7,842
Jul 200134588223.933.20$11,076
Jun 2001062124.563.82$2,375
May 200118075325.524.31$7,837
Apr 200116677324.685.34$8,221
Mar 200118179924.545.38$8,738
Feb 200117764827.755.77$8,649
Jan 2001065727.478.40$5,518
Dec 2000062826.889.12$5,729
Nov 200018377032.215.66$10,251
Oct 200033692431.235.15$15,248
Sep 2000066331.875.19$3,439
Aug 2000093929.644.54$4,264
Jul 200017583728.534.09$8,416
Jun 200017574729.304.40$8,412
May 20001761,00427.263.68$8,492
Apr 200017762024.513.12$6,270
Mar 20000028.422.86$0
Feb 2000023527.622.73$641
Jan 200021629725.272.48$6,195
Dec 1999031924.282.42$773
Nov 199917942623.192.43$5,188
Oct 1999165620.982.80$1,860
Sep 1999033821.752.62$885
Aug 199917860919.262.88$5,180
Jul 1999055017.892.37$1,305
Jun 1999054715.942.36$1,292
May 199916462815.792.32$4,047
Apr 1999061415.102.21$1,356
Mar 1999056812.471.84$1,044
Feb 19991816419.981.82$2,972
Jan 1999045910.381.90$872
Dec 199805799.201.77$1,027
Nov 1998055410.892.19$1,211
Oct 1998078712.421.97$1,550
Sep 199817749712.592.08$3,263
Aug 1998085311.301.91$1,627
Jul 1998058711.742.24$1,313
Jun 1998058311.242.24$1,304
May 199817783212.622.21$4,069
Apr 1998071513.042.51$1,791
Mar 199817887612.802.31$4,301
Feb 1998048513.952.30$1,115
Jan 199817062114.702.15$3,837
Dec 1997075616.322.41$1,823
Nov 1997053218.193.09$1,643
Oct 199716558519.253.15$5,019
Sep 1997072517.742.95$2,142
Aug 1997072617.862.55$1,855
Jul 1997066317.582.25$1,490
Jun 199717562117.242.26$4,419
May 1997071518.972.31$1,651
Apr 199721374517.882.08$5,360
Mar 1997063218.951.94$1,226
Feb 199718154620.492.21$4,913
Jan 1997069323.483.54$2,453
Dec 199635974423.32$8,372
Nov 199616376221.97$3,581
Oct 1996078023.31$0
Sep 199616676822.22$3,689
Aug 199617463120.26$3,525
Jul 199617658819.55$3,441
Jun 1996063118.73$0
May 199615868119.43$3,070
Apr 1996055721.51$0
Mar 199620957519.38$4,050
Feb 1996053416.98$0
Jan 199630085717.07$5,121
Dec 199515780517.19$2,699
Nov 199516985216.00$2,704
Oct 19951661,05415.43$2,561
Sep 199516884416.18$2,718
Aug 199516895915.92$2,675
Jul 199518088215.24$2,743
Jun 199521187116.41$3,463
May 199517193417.56$3,003
Apr 199517688017.73$3,120
Mar 199517496116.44$2,861
Feb 19953591,02816.58$5,952
Jan 199517992815.92$2,850
Dec 1994078115.03$0
Nov 199435593315.90$5,645
Oct 19941781,00415.58$2,773
Sep 19941741,03815.29$2,660
Aug 19941741,05416.13$2,807
Jul 19941731,00217.56$3,038
Jun 19941751,12317.09$2,991
May 19943531,23215.88$5,606
Apr 199416769314.14$2,361
Mar 199417672912.46$2,193
Feb 19941781,12512.50$2,225
Jan 199418390612.66$2,317
Dec 19933501,13712.33$4,316
Nov 19931661,66814.49$2,405
Oct 19931781,70115.85$2,821
Sep 19931741,23415.03$2,615
Aug 19931731,57115.66$2,709
Jul 19933521,27315.46$5,442
Jun 199317574516.79$2,938
May 199318867817.68$3,324
Apr 199317576718.05$3,159
Mar 199335866818.14$6,494
Feb 199316966617.90$3,025
Jan 199318168516.93$3,064

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2006 — as filed, then multipliedworked
Oil                  443 bbl  × $ 56.70 =    $25,118
Casinghead gas       589 Mcf  × $  7.08 =     $4,172

────────────────────────────────────────────────────
Month total                                  $29,290

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/12586 is the state's own key, not one this site invented.