VAUGHN "B"

Operated by EXCO OPERATING COMPANY, LP (P-5 256915) in the WASKOM (ALEXANDER SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12733District 06Field 95369032OilCasinghead gasSaveExport
Value, all time
$759 k
Jan 1993 – Feb 2012
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
230
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 27 leases and 33 wells, and the rule below applies to all of them.

Discovered
1961-05-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1963-01-16.

The Commission's schedule remark for this field reads: FIELD RULES EFF. 1-16-63 PER DOCKET #6-51039.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition31,696 bbl$669,801
Casinghead gasProduction48,500 Mcf$89,477
Total$759,278

25,699 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5052, -94.1252. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.50520, -94.12523 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,630 ft
1 wells filed one
Completion to plug
21.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,630 ft.

Completions filed
Jul 1990
1 of 1 wells
Plug dates filed
Nov 2011
1 of 1 wells

Last completion to plug: a median of 21.3 years across the 1 well that filed both dates, with the middle half between 21.3 years and 21.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2033020619,630 ftJul 1990Nov 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (230)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

230 months

Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 201119095.723.31$1,819
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 2005144061.519.80$8,857
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 200507345.226.65$486
Apr 200514619449.207.36$8,611
Mar 200516119050.377.15$9,469
Feb 200515524645.226.31$8,562
Jan 200515528743.166.32$8,504
Dec 200415218639.866.75$7,314
Nov 200415525445.286.33$8,626
Oct 200417317649.706.52$9,745
Sep 200417217343.245.28$8,351
Aug 200415318642.375.55$7,515
Jul 200415419638.286.08$7,088
Jun 200413721836.106.43$6,348
May 200415027537.486.49$7,408
Apr 200414927134.475.86$6,724
Mar 200416029834.365.53$7,146
Feb 200415826232.455.51$6,571
Jan 200415125032.036.30$6,411
Dec 200315622330.266.30$6,126
Nov 20031439928.804.60$4,573
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030729.765.13$36
Jul 200313624329.415.17$5,256
Jun 200314425128.565.98$5,614
May 200317525626.595.97$6,182
Apr 200333026326.675.41$10,223
Mar 2003016931.146.10$1,030
Feb 200329017733.487.93$11,112
Jan 200314212630.315.58$5,007
Dec 200214317426.914.85$4,693
Nov 200212917724.664.14$3,913
Oct 200215618126.464.23$4,893
Sep 200214523127.443.64$4,819
Aug 200215129725.963.16$4,860
Jul 200229127924.583.06$8,007
Jun 200214825823.733.34$4,373
May 200215014824.663.58$4,229
Apr 200214122323.653.51$4,118
Mar 200214320522.003.10$3,782
Feb 200214517118.222.38$3,048
Jan 200213618317.172.38$2,770
Dec 200128922716.932.36$5,429
Nov 200116926718.072.41$3,696
Oct 200114027419.782.53$3,462
Sep 200127933724.262.25$7,527
Aug 200130227224.873.05$8,341
Jul 20011565323.933.20$3,903
Jun 200101024.563.82$38
May 20011389325.524.31$3,922
Apr 200116427424.685.34$5,509
Mar 200115628324.545.38$5,350
Feb 200134624127.755.77$10,991
Jan 200115429527.478.40$6,708
Dec 200017035026.889.12$7,762
Nov 200016533532.215.66$7,210
Oct 200017533131.235.15$7,168
Sep 200017834331.875.19$7,452
Aug 200016231029.644.54$6,209
Jul 200017528228.534.09$6,146
Jun 200017717729.304.40$5,964
May 200018120527.263.68$5,688
Apr 200015624924.513.12$4,599
Mar 200016928028.422.86$5,604
Feb 200034613027.622.73$9,911
Jan 200017821125.272.48$5,021
Dec 1999011824.282.42$286
Nov 199934024123.192.43$8,471
Oct 199916927120.982.80$4,305
Sep 1999023421.752.62$613
Aug 199934226619.262.88$7,352
Jul 199916726617.892.37$3,619
Jun 199917525315.942.36$3,387
May 199917527315.792.32$3,397
Apr 199934823015.102.21$5,763
Mar 199917223212.471.84$2,571
Feb 199901979.981.82$358
Jan 199917820910.381.90$2,245
Dec 19983542389.201.77$3,679
Nov 199817923010.892.19$2,452
Oct 1998025312.421.97$498
Sep 199817025612.592.08$2,673
Aug 199817024911.301.91$2,396
Jul 199834220211.742.24$4,467
Jun 199817920211.242.24$2,464
May 199818121612.622.21$2,761
Apr 1998025613.042.51$641
Mar 199818025012.802.31$2,881
Feb 199817823013.952.30$3,012
Jan 199817427614.702.15$3,153
Dec 199735423716.322.41$6,349
Nov 199717514518.193.09$3,631
Oct 199734114319.253.15$7,015
Sep 1997018517.742.95$547
Aug 199717728617.862.55$3,892
Jul 199717426017.582.25$3,643
Jun 199735032217.242.26$6,761
May 199718133818.972.31$4,214
Apr 199718332517.882.08$3,949
Mar 199735933318.951.94$7,449
Feb 199717831920.492.21$4,351
Jan 199718435523.483.54$5,577
Dec 199635437023.32$8,255
Nov 199618336621.97$4,021
Oct 199636342723.31$8,462
Sep 199617842122.22$3,955
Aug 19963569020.26$7,213
Jul 199616632419.55$3,245
Jun 199617943618.73$3,353
May 199636046619.43$6,995
Apr 199617843821.51$3,829
Mar 199628943319.38$5,601
Feb 199635450416.98$6,011
Jan 199636645717.07$6,248
Dec 199518342317.19$3,146
Nov 199536143916.00$5,776
Oct 199517848215.43$2,747
Sep 199535655216.18$5,760
Aug 199518037715.92$2,866
Jul 199531737315.24$4,831
Jun 199517637116.41$2,888
May 199532553617.56$5,707
Apr 199534550117.73$6,117
Mar 199517951816.44$2,943
Feb 199536243516.58$6,002
Jan 199517053315.92$2,706
Dec 199435658315.03$5,351
Nov 199436480315.90$5,788
Oct 199418269015.58$2,836
Sep 199435974615.29$5,489
Aug 199434484016.13$5,549
Jul 199417984017.56$3,143
Jun 199434389517.09$5,862
May 199436098215.88$5,717
Apr 199417594514.14$2,475
Mar 199436293612.46$4,511
Feb 199434335212.50$4,288
Jan 199436369412.66$4,596
Dec 199336557612.33$4,500
Nov 199336665014.49$5,303
Oct 199336263915.85$5,738
Sep 199317735215.03$2,660
Aug 199335679115.66$5,575
Jul 199353434615.46$8,256
Jun 199335860716.79$6,011
May 199336058917.68$6,365
Apr 199336148218.05$6,516
Mar 199333128518.14$6,004
Feb 199318036917.90$3,222
Jan 199336643516.93$6,196

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2011 — as filed, then multipliedworked
Oil                   19 bbl  × $ 95.72 =     $1,819
Casinghead gas         0 Mcf  × $  3.31 =         $0

────────────────────────────────────────────────────
Month total                                   $1,819

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/12733 is the state's own key, not one this site invented.