WILCOTS, S. W.

Operated by BP AMERICA PRODUCTION COMPANY (P-5 40798) in the CARTHAGE (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 13114District 06Field 16032812OilCasinghead gasSaveExport
Value, all time
$605 k
Jan 1993 – May 2003
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
125
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 873 leases and 896 wells, and the rule below applies to all of them.

Discovered
1943-06-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-10-10.

The Commission's schedule remark for this field reads: (PETTIT, LOWER).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition12,873 bbl$231,636
Casinghead gasProduction323,077 Mcf$373,829
Total$605,465

184,703 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1044, -94.4976. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

32.10437, -94.49762 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
8,334 ft
2 wells filed one
Completion to plug
52.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,957 and 9,710 ft, median 8,334 ft, over the 2 wells that filed a depth.

Completions filed
Apr 1961 – Feb 1997
2 of 2 wells
Plug dates filed
Feb 2014
1 of 2 wells; 1 filed none

Last completion to plug: a median of 52.8 years across the 1 well that filed both dates, with the middle half between 52.8 years and 52.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-3653171239,710 ftFeb 1997Yes
42-3650167316,957 ftApr 1961Feb 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (125)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

125 months

May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 2003036030.315.58$2,010
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 200123024.685.34$568
Mar 2001831,53624.545.38$10,295
Feb 2001831,61027.755.77$11,588
Jan 20011652,05227.478.40$21,767
Dec 20007879626.889.12$9,358
Nov 2000675132.215.66$4,442
Oct 20008668531.235.15$6,210
Sep 2000064031.875.19$3,319
Aug 20008699829.644.54$7,081
Jul 200021,09728.534.09$4,544
Jun 2000121,59129.304.40$7,348
May 2000962,34927.263.68$11,261
Apr 2000952,27724.513.12$9,424
Mar 2000992,19828.422.86$9,099
Feb 20001011,56827.622.73$7,065
Jan 20001441,83225.272.48$8,183
Dec 1999352,12924.282.42$6,010
Nov 19992732,21023.192.43$11,710
Oct 19991492,38020.982.80$9,799
Sep 19991332,04321.752.62$8,243
Aug 19991342,59419.262.88$10,040
Jul 19991562,56817.892.37$8,883
Jun 19991472,53515.942.36$8,331
May 19991502,30315.792.32$7,714
Apr 19991582,95015.102.21$8,900
Mar 19991673,08912.471.84$7,761
Feb 19991602,9159.981.82$6,896
Jan 19992743,17510.381.90$8,876
Dec 19981703,3329.201.77$7,473
Nov 19981252,92110.892.19$7,746
Oct 19981292,87612.421.97$7,266
Sep 19982303,57012.592.08$10,331
Aug 19981423,71111.301.91$8,683
Jul 19982193,31711.742.24$9,992
Jun 1998251,85911.242.24$4,440
May 19981193,07312.622.21$8,282
Apr 19982223,43113.042.51$11,491
Mar 19981033,43412.802.31$9,249
Feb 19982363,39613.952.30$11,100
Jan 19981583,54514.702.15$9,961
Dec 19972523,25916.322.41$11,970
Nov 19971473,37118.193.09$13,084
Oct 19971943,44119.253.15$14,573
Sep 1997933,68417.742.95$12,536
Aug 19971063,66217.862.55$11,249
Jul 19971033,80517.582.25$10,360
Jun 19971122,89017.242.26$8,454
May 1997733,87118.972.31$10,321
Apr 1997733,65217.882.08$8,912
Mar 19971633,70618.951.94$10,275
Feb 19972967,66520.492.21$22,973
Jan 19971563,67223.483.54$16,661
Dec 19961423,92323.32$3,311
Nov 19962724,26021.97$5,976
Oct 19961733,98523.31$4,033
Sep 19964694,09822.22$10,421
Aug 19963979,88920.26$8,043
Jul 19962723,72819.55$5,318
Jun 19962633,91518.73$4,926
May 19961324,27019.43$2,565
Apr 19963783,75121.51$8,131
Mar 19962203,39519.38$4,264
Feb 199612616.98$204
Jan 19961021,48717.07$1,741
Dec 19951903,16117.19$3,266
Nov 1995761,37816.00$1,216
Oct 19957276315.43$1,111
Sep 19951702,70316.18$2,751
Aug 1995883,15715.92$1,401
Jul 19951482,74915.24$2,256
Jun 1995663,49216.41$1,083
May 19951163,59717.56$2,037
Apr 19951193,52317.73$2,110
Mar 19951193,68916.44$1,956
Feb 1995563,17316.58$928
Jan 1995794,12615.92$1,258
Dec 1994804,45315.03$1,202
Nov 1994814,38415.90$1,288
Oct 1994814,24315.58$1,262
Sep 1994793,54415.29$1,208
Aug 1994774,04416.13$1,242
Jul 1994393,45117.56$685
Jun 1994804,02817.09$1,367
May 19941304,29015.88$2,064
Apr 19941313,69714.14$1,852
Mar 1994411,61912.46$511
Feb 1994371,86712.50$463
Jan 1994523,24812.66$658
Dec 19931894,68512.33$2,330
Nov 19931034,89014.49$1,492
Oct 1993715,42715.85$1,125
Sep 1993695,18215.03$1,037
Aug 1993724,54615.66$1,128
Jul 19931054,03715.46$1,623
Jun 1993674,40316.79$1,125
May 1993645,53917.68$1,132
Apr 1993965,51318.05$1,733
Mar 1993955,91318.14$1,723
Feb 1993644,00617.90$1,146
Jan 1993985,47616.93$1,659

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2003 — as filed, then multipliedworked
Oil                    0 bbl  × $ 30.31 =         $0
Casinghead gas       360 Mcf  × $  5.58 =     $2,010

────────────────────────────────────────────────────
Month total                                   $2,010

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/13114 is the state's own key, not one this site invented.