JONES "A"

Operated by 3-T EXPLORATION, INC. (P-5 953682) in the LANE CHAPEL (PALUXY A SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14215District 06Field 51850625OilCasinghead gasSaveExport
Value, all time
$4.8 M
Apr 2003 – May 2026
Value, last 12 filed months
$9
at the published price for each month
Months reported
278
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 29 leases and 69 wells, and the rule below applies to all of them.

Discovered
1989-09-01
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-11-06.

The Commission's schedule remark for this field reads: 14941 & 14845 UNITIZED INTO THIS UNIT.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition79,514 bbl$3,451,501
Casinghead gasProduction279,056 Mcf$1,380,247
Total$4,831,748

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3624, -95.2140. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.1 miles.

32.36236, -95.21399 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
7,386 ft
2 wells filed one
Completion to plug
14.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,371 and 7,400 ft, median 7,386 ft, over the 2 wells that filed a depth.

Completions filed
Jul 2004 – Mar 2008
2 of 2 wells
Plug dates filed
Jan 2023
1 of 2 wells; 1 filed none

Last completion to plug: a median of 14.8 years across the 1 well that filed both dates, with the middle half between 14.8 years and 14.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-4233162417,371 ftMar 2008Jan 2023Yes
42-4233177427,400 ftJul 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250366.483.13$9
May 20250660.553.23$19
Apr 202501162.363.54$39
Mar 20250567.704.27$21
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202415822271.372.28$11,783
Sep 202409669.612.36$227
Aug 202404075.632.06$83
Jul 202403179.932.15$67
Jun 202404178.082.63$108
May 2024011278.812.20$246
Apr 202408084.451.66$133
Mar 20241603780.301.55$12,905
Feb 2024012376.091.78$219
Jan 202407673.023.30$251
Dec 202305171.262.61$133
Nov 202308177.892.81$227
Oct 202306785.443.09$207
Sep 202307189.042.74$194
Aug 2023011180.522.67$297
Jul 2023016474.852.64$433
Jun 202315314268.962.26$10,872
May 2023021970.622.23$488
Apr 202316823178.122.24$13,641
Mar 2023021972.852.39$524
Feb 2023022575.112.47$555
Jan 2023024076.533.39$813
Dec 2022021276.415.73$1,215
Nov 2022029585.005.65$1,666
Oct 2022028387.185.86$1,659
Sep 2022023384.888.16$1,902
Aug 2022025994.529.13$2,364
Jul 20220248101.587.54$1,870
Jun 20220252115.097.98$2,010
May 2022175283109.378.43$21,526
Apr 20220318104.226.84$2,174
Mar 20220310108.885.08$1,574
Feb 2022023291.054.86$1,127
Jan 2022028181.844.54$1,275
Dec 2021030571.323.90$1,189
Nov 2021031177.435.24$1,629
Oct 202116744079.795.71$15,839
Sep 2021035269.865.35$1,884
Aug 2021047666.024.22$2,009
Jul 2021045170.783.98$1,796
Jun 202116942069.493.38$13,164
May 2021010763.483.02$323
Apr 2021031160.362.76$858
Mar 2021054361.302.72$1,475
Feb 2021037557.805.55$2,080
Jan 2021064250.412.81$1,804
Dec 2020064144.642.68$1,715
Nov 202016060038.772.71$7,827
Oct 2020052236.972.48$1,294
Sep 2020018437.091.99$366
Aug 2020052439.982.39$1,250
Jul 202015864738.371.83$7,243
Jun 2020062434.901.69$1,055
May 2020053916.921.81$978
Apr 2020056314.751.80$1,016
Mar 2020073930.341.86$1,372
Feb 2020072249.881.98$1,430
Jan 2020056457.252.09$1,181
Dec 201916375659.012.30$11,361
Nov 2019046055.302.75$1,265
Oct 2019061253.472.42$1,480
Sep 2019084755.052.66$2,251
Aug 2019067953.112.30$1,565
Jul 2019075856.272.46$1,865
Jun 2019082952.782.49$2,065
May 2019044958.482.74$1,230
Apr 2019032562.632.75$894
Mar 201916366456.803.06$11,292
Feb 2019080550.852.79$2,248
Jan 2019033446.033.23$1,078
Dec 2018016446.594.19$686
Nov 201816250552.934.24$10,714
Oct 2018056661.443.40$1,923
Sep 2018069659.543.11$2,163
Aug 2018059559.403.07$1,825
Jul 2018077165.142.93$2,260
Jun 2018077360.183.08$2,378
May 201817191665.382.90$13,837
Apr 2018092463.842.90$2,680
Mar 2018089361.222.79$2,489
Feb 2018066661.782.77$1,842
Jan 201817169062.874.01$13,517
Dec 2017087657.272.92$2,559
Nov 2017088655.423.12$2,763
Oct 2017089549.292.98$2,670
Sep 201717288647.523.09$10,909
Aug 2017092345.373.00$2,773
Jul 2017095943.873.09$2,961
Jun 2017089442.493.09$2,760
May 201716390945.373.26$10,362
Apr 2017097247.933.21$3,122
Mar 2017093746.772.98$2,796
Feb 201716584250.452.95$10,810
Jan 2017090349.413.42$3,087
Dec 2016091848.763.72$3,418
Nov 2016064842.492.64$1,714
Oct 20161621,16346.193.09$11,077
Sep 201601,02541.553.10$3,178
Aug 201601,22741.442.92$3,588
Jul 201601,36541.622.92$3,992
Jun 20161671,19745.352.69$10,788
May 201601,24942.521.99$2,487
Apr 201601,21536.561.99$2,419
Mar 20161581,13933.011.79$7,259
Feb 2016097226.472.06$2,006
Jan 201601,21227.352.36$2,866
Dec 20151751,24832.362.00$8,161
Nov 201501,23138.792.17$2,668
Oct 201501,26643.552.43$3,072
Sep 20151611,42842.992.76$10,860
Aug 201501,15440.162.87$3,315
Jul 201501,49648.152.95$4,406
Jun 20151651,64356.152.88$14,001
May 201501,55455.212.96$4,593
Apr 201501,19249.822.71$3,226
Mar 20151721,68942.892.93$12,334
Feb 201501,52544.662.98$4,539
Jan 20151721,65043.433.10$12,586
Dec 201401,61754.693.59$5,807
Nov 20141841,62270.464.25$19,861
Oct 201401,89978.303.90$7,408
Sep 201401,84686.164.05$7,468
Aug 20141611,68989.394.04$21,207
Jul 201401,75796.564.18$7,344
Jun 20141591,71998.164.74$23,750
May 201401,74494.734.73$8,243
Apr 20141791,84495.944.81$26,041
Mar 201401,67895.895.06$8,485
Feb 20141681,65497.406.19$26,605
Jan 201401,93790.404.86$9,415
Dec 20131781,52591.824.35$22,985
Nov 201301,73088.853.74$6,467
Oct 20131691,66597.423.78$22,757
Sep 20131691,600104.113.72$23,543
Aug 201301,448104.253.52$5,101
Jul 20131591,429102.523.72$21,613
Jun 20131471,46194.403.93$19,624
May 20131771,51194.834.15$23,054
Apr 201301,59993.964.28$6,848
Mar 20131551,70593.623.91$21,183
Feb 20131471,80591.233.42$19,584
Jan 20131442,31091.603.42$21,090
Dec 20121612,28286.773.42$21,775
Nov 20121711,81786.953.62$21,455
Oct 20121712,99389.383.40$25,459
Sep 20123223,03294.672.92$39,332
Aug 20121713,51692.662.91$26,070
Jul 20121673,51085.133.02$24,820
Jun 201202,10179.822.52$5,293
May 201203291.612.49$80
Apr 20120130101.652.00$260
Mar 20120245105.052.22$544
Feb 20120517101.102.57$1,329
Jan 2012055298.092.73$1,509
Dec 2011065896.873.24$2,132
Nov 201117369995.723.31$18,874
Oct 2011062384.983.65$2,273
Sep 2011074683.623.99$2,973
Aug 2011092183.404.15$3,822
Jul 2011093394.144.52$4,215
Jun 201101,08992.904.64$5,053
May 20111661,04898.134.40$20,906
Apr 20110567105.964.33$2,457
Mar 2011024596.364.06$994
Feb 2011042785.644.18$1,785
Jan 2011024386.504.59$1,115
Dec 2010044885.734.35$1,948
Nov 2010044380.843.80$1,681
Oct 2010055278.103.51$1,937
Sep 201016352172.633.98$13,912
Aug 2010055673.684.42$2,457
Jul 2010059472.554.74$2,813
Jun 2010059370.364.91$2,912
May 2010034171.124.24$1,444
Apr 2010085681.694.12$3,529
Mar 2010085478.394.39$3,748
Feb 201001,06573.585.44$5,796
Jan 20101751,03874.365.96$19,204
Dec 200901,06771.445.48$5,851
Nov 200901,34874.593.75$5,057
Oct 200901,41572.544.11$5,816
Sep 20091701,41065.543.06$15,463
Aug 20091711,42967.423.22$16,128
Jul 20091671,31561.133.46$14,765
Jun 200901,03666.163.90$4,035
May 2009096554.743.93$3,788
Apr 20091661,08946.773.59$11,671
Mar 200901,20442.144.06$4,887
Feb 200901,36332.814.63$6,315
Jan 20091681,72835.865.37$15,306
Dec 20081711,53237.105.98$15,501
Nov 200801,63755.496.86$11,230
Oct 20081661,56975.246.92$23,350
Sep 200801,194101.767.88$9,405
Aug 20081711,298114.228.48$30,543
Jul 20081671,347131.0811.39$37,232
Jun 200801,198131.3313.03$15,613
May 20081761,226123.1711.57$35,868
Apr 200801,135110.3110.45$11,866
Mar 20081771,187101.909.66$29,508
Feb 20081631,15092.538.77$25,169
Jan 200801,26190.388.21$10,347
Dec 20071581,24488.337.30$23,040
Nov 20071831,32091.677.29$26,401
Oct 20071521,34482.856.92$21,896
Sep 20071751,36175.846.24$21,770
Aug 20071631,71469.066.39$22,206
Jul 20071631,71970.906.39$22,538
Jun 20071761,70762.007.55$23,797
May 20073531,88358.747.85$35,510
Apr 20071601,40659.617.81$20,512
Mar 20071501,40456.927.30$18,790
Feb 20071721,26155.108.22$19,838
Jan 20073261,61550.306.73$27,262
Dec 20061651,20556.656.92$17,684
Nov 20061701,20454.207.62$18,385
Oct 20063251,27354.906.01$25,498
Sep 20063371,16560.085.04$26,115
Aug 20063281,45368.717.34$33,202
Jul 20061721,45469.376.34$21,154
Jun 20065291,40366.286.38$44,019
May 20063381,73266.016.42$33,439
Apr 20066671,96364.397.36$57,397
Mar 20065142,56256.707.08$47,290
Feb 20066692,96657.597.75$61,518
Jan 20066404,46960.598.93$78,701
Dec 2005085954.9413.42$11,524
Nov 20050054.6910.59$0
Oct 2005039658.3413.80$5,463
Sep 20051681,21961.4512.08$25,048
Aug 20053181,22061.519.80$31,512
Jul 20053501,65655.697.84$32,481
Jun 20053201,57352.337.38$28,356
May 20058281,80845.226.65$49,467
Apr 20051,3822,48349.207.36$86,270
Mar 20051,7012,56550.377.15$104,032
Feb 20051,8332,31045.226.31$97,469
Jan 20052,2972,72943.166.32$116,392
Dec 20041,9772,80339.866.75$97,727
Nov 20041,9971,91045.286.33$102,515
Oct 20041,3181,19249.706.52$73,271
Sep 20043,4762,98043.245.28$166,048
Aug 20044,1814,73042.375.55$203,404
Jul 20042,1782,39938.286.08$97,970
Jun 20041,43083436.106.43$56,988
May 20041,8331,07937.486.49$75,708
Apr 20041,68992534.475.86$63,639
Mar 20041,69888834.365.53$63,254
Feb 20042,4781,34632.455.51$87,827
Jan 20042,6451,36532.036.30$93,318
Dec 20032,9961,80530.266.30$102,033
Nov 20033,2301,68128.804.60$100,748
Oct 20033,1831,87528.174.76$98,589
Sep 20031,7811,13526.314.75$52,249
Aug 20033,1011,91129.765.13$102,089
Jul 20033,7742,16629.415.17$122,193
Jun 20032,6881,09128.565.98$83,297
May 20032,7971,17926.595.97$81,414
Apr 20032,38395626.675.41$68,724

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2025 — as filed, then multipliedworked
Oil                    0 bbl  × $ 66.48 =         $0
Casinghead gas         3 Mcf  × $  3.13 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/14215 is the state's own key, not one this site invented.