ROGERS, V. G.

Operated by RFE OPERATING, LLC (P-5 704776) in the BLOCKER (PAGE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14286District 06Field 09591350OilCasinghead gasSaveExport
Value, all time
$500 k
Dec 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
270
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 41 leases and 41 wells, and the rule below applies to all of them.

Discovered
1980-12-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-07-26.

The Commission's schedule remark for this field reads: FROM OCTOBER TO DECEMBER.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,392 bbl$124,277
Casinghead gasProduction59,279 Mcf$375,404
Total$499,681

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5157, -94.4329. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.51566, -94.43287 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,300 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-20330796110,300 ftNov 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (270)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

270 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20161041.622.92$42
Jun 201601145.352.69$30
May 20160042.521.99$0
Apr 20160536.561.99$10
Mar 201604433.011.79$79
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150648.152.95$18
Jun 20150456.152.88$12
May 201501155.212.96$33
Apr 20150449.822.71$11
Mar 20150742.892.93$21
Feb 201501444.662.98$42
Jan 20150743.433.10$22
Dec 20140454.693.59$14
Nov 20140770.464.25$30
Oct 20140678.303.90$23
Sep 20140886.164.05$32
Aug 20140489.394.04$16
Jul 20140496.564.18$17
Jun 201401398.164.74$62
May 201401594.734.73$71
Apr 20140995.944.81$43
Mar 20140895.895.06$40
Feb 201401797.406.19$105
Jan 2014013190.404.86$637
Dec 201301091.824.35$44
Nov 201301688.853.74$60
Oct 201301097.423.78$38
Sep 201308104.113.72$30
Aug 2013011104.253.52$39
Jul 2013010102.523.72$37
Jun 20131094.403.93$94
May 201301694.834.15$66
Apr 201301493.964.28$60
Mar 20130993.623.91$35
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201101294.144.52$54
Jun 20111352692.904.64$12,662
May 201102698.134.40$115
Apr 2011024105.964.33$104
Mar 201102296.364.06$89
Feb 2011038085.644.18$1,588
Jan 2011056386.504.59$2,583
Dec 2010011785.734.35$509
Nov 2010011380.843.80$429
Oct 201003578.103.51$123
Sep 201003072.633.98$119
Aug 201004273.684.42$186
Jul 2010065672.554.74$3,107
Jun 2010068770.364.91$3,373
May 2010045471.124.24$1,923
Apr 201001,01781.694.12$4,193
Mar 2010092778.394.39$4,068
Feb 2010030673.585.44$1,665
Jan 2010040674.365.96$2,421
Dec 2009046371.445.48$2,539
Nov 2009097074.593.75$3,639
Oct 2009032672.544.11$1,340
Sep 2009072065.543.06$2,207
Aug 2009020167.423.22$647
Jul 2009076461.133.46$2,647
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090242.144.06$8
Feb 200901032.814.63$46
Jan 200901235.865.37$64
Dec 200817413137.105.98$7,238
Nov 200803355.496.86$226
Oct 2008011075.246.92$761
Sep 20082149101.767.88$1,377
Aug 20081508114.228.48$4,424
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 20080227123.1711.57$2,627
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 2008020992.538.77$1,833
Jan 2008011790.388.21$960
Dec 2007067988.337.30$4,958
Nov 2007062791.677.29$4,572
Oct 200715063782.856.92$16,837
Sep 2007039775.846.24$2,479
Aug 2007176069.066.39$4,924
Jul 2007076470.906.39$4,880
Jun 200716969562.007.55$15,724
May 2007085758.747.85$6,724
Apr 2007088559.617.81$6,908
Mar 2007072756.927.30$5,309
Feb 2007074455.108.22$6,113
Jan 200719378950.306.73$15,015
Dec 2006076856.656.92$5,313
Nov 200601,21654.207.62$9,263
Oct 2006096954.906.01$5,827
Sep 200601,07160.085.04$5,395
Aug 200617485868.717.34$18,253
Jul 200617472369.376.34$16,656
Jun 2006031166.286.38$1,985
May 2006079766.016.42$5,121
Apr 2006055364.397.36$4,070
Mar 2006045856.707.08$3,244
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 200504254.9413.42$563
Nov 200503854.6910.59$402
Oct 2005067058.3413.80$9,243
Sep 2005059161.4512.08$7,139
Aug 2005018461.519.80$1,803
Jul 2005066855.697.84$5,240
Jun 2005062152.337.38$4,584
May 200517795445.226.65$14,349
Apr 200501,48549.207.36$10,930
Mar 2005076050.377.15$5,438
Feb 200501,46945.226.31$9,272
Jan 20052731,30843.166.32$20,052
Dec 200401,03439.866.75$6,981
Nov 200402,16045.286.33$13,674
Oct 200401,93349.706.52$12,594
Sep 20041731,61143.245.28$15,993
Aug 200401,78142.375.55$9,886
Jul 20041861,30138.286.08$15,036
Jun 200401,88236.106.43$12,107
May 200401,63737.486.49$10,632
Apr 20041771,78034.475.86$16,529
Mar 2004991,98734.365.53$14,390
Feb 200402,12532.455.51$11,708
Jan 20041322,31032.036.30$18,780
Dec 200301,42530.266.30$8,980

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2016 — as filed, then multipliedworked
Oil                    1 bbl  × $ 41.62 =        $42
Casinghead gas         0 Mcf  × $  2.92 =         $0

────────────────────────────────────────────────────
Month total                                      $42

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/14286 is the state's own key, not one this site invented.