Operated by ATLAS OPERATING LLC (P-5 36587) in the CHAPEL HILL, NE. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14306District 06Field 17011500OilCasinghead gasSaveExport
Value, all time
$771 k
Mar 2004 – May 2026
Value, last 12 filed months
$20 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 42 leases and 57 wells, and the rule below applies to all of them.

Discovered
1979-12-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1981-06-08.

The Commission's schedule remark for this field reads: FIELD TYPE CHANGED TO ONE WELL EFF. 7-1-04.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition8,770 bbl$561,502
Casinghead gasProduction39,988 Mcf$209,280
Total$770,782

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3943, -95.1105. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.39427, -95.11045 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,800 ft.

Completions filed
Jan 1984
1 of 1 wells

1 well

42-4233071438,800 ftJan 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 2026154089.753.15$13,822
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 2025105058.593.93$6,152
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 2023014975.112.47$367
Jan 2023017276.533.39$583
Dec 2022028576.415.73$1,633
Nov 202214226885.005.65$13,583
Oct 2022019187.185.86$1,120
Sep 2022021884.888.16$1,780
Aug 2022024494.529.13$2,227
Jul 20220173101.587.54$1,305
Jun 2022061115.097.98$487
May 2022090109.378.43$759
Apr 2022049104.226.84$335
Mar 202214056108.885.08$15,527
Feb 202202991.054.86$141
Jan 2022022181.844.54$1,003
Dec 2021013471.323.90$522
Nov 202117016277.435.24$14,011
Oct 202108179.795.71$463
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 2021169069.493.38$11,744
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 2021155050.412.81$7,814
Dec 202003244.642.68$86
Nov 202001138.772.71$30
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 2020161038.371.83$6,178
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 202004630.341.86$85
Feb 202008149.881.98$160
Jan 2020015757.252.09$329
Dec 2019030259.012.30$696
Nov 2019031555.302.75$866
Oct 2019017953.472.42$433
Sep 2019013655.052.66$361
Aug 2019021553.112.30$495
Jul 201917237156.272.46$10,591
Jun 2019021552.782.49$536
May 2019030558.482.74$836
Apr 2019027862.632.75$765
Mar 2019026356.803.06$805
Feb 2019028650.852.79$799
Jan 2019025546.033.23$823
Dec 2018035546.594.19$1,486
Nov 2018018352.934.24$775
Oct 2018033361.443.40$1,132
Sep 2018017859.543.11$553
Aug 20180159.403.07$3
Jul 201801165.142.93$32
Jun 201816915660.183.08$10,650
May 2018021865.382.90$632
Apr 201809163.842.90$264
Mar 2018020661.222.79$574
Feb 2018017361.782.77$479
Jan 2018018262.874.01$730
Dec 2017020457.272.92$596
Nov 2017019755.423.12$614
Oct 2017016149.292.98$480
Sep 20171689847.523.09$8,286
Aug 201707045.373.00$210
Jul 2017015943.873.09$491
Jun 2017038642.493.09$1,192
May 2017040245.373.26$1,312
Apr 2017038747.933.21$1,243
Mar 2017032346.772.98$964
Feb 2017024750.452.95$729
Jan 2017022849.413.42$779
Dec 2016026048.763.72$968
Nov 2016025942.492.64$685
Oct 201619127546.193.09$9,672
Sep 2016029041.553.10$899
Aug 2016027741.442.92$810
Jul 2016026341.622.92$769
Jun 2016027745.352.69$744
May 201617224442.521.99$7,799
Apr 2016027936.561.99$556
Mar 2016028033.011.79$502
Feb 2016031026.472.06$640
Jan 201618027427.352.36$5,571
Dec 2015029132.362.00$582
Nov 2015025038.792.17$542
Oct 201517621143.552.43$8,177
Sep 2015022142.992.76$610
Aug 2015019640.162.87$563
Jul 2015025448.152.95$748
Jun 201518322256.152.88$10,915
May 201501,65155.212.96$4,879
Apr 201518223549.822.71$9,703
Mar 2015021542.892.93$631
Feb 2015018744.662.98$557
Jan 201517417743.433.10$8,106
Dec 2014023654.693.59$848
Nov 2014021670.464.25$918
Oct 201418227278.303.90$15,312
Sep 2014026386.164.05$1,064
Aug 201417328289.394.04$16,602
Jul 2014023096.564.18$961
Jun 201418223398.164.74$18,969
May 2014022794.734.73$1,073
Apr 2014019095.944.81$914
Mar 201417918995.895.06$18,120
Feb 2014019497.406.19$1,201
Jan 201418319990.404.86$17,510
Dec 201306691.824.35$287
Nov 201318226188.853.74$17,146
Oct 2013010197.423.78$382
Sep 201318287104.113.72$19,271
Aug 20130136104.253.52$479
Jul 20130191102.523.72$710
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 201197083.404.15$8,090
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 200901471.445.48$77
Nov 20090074.593.75$0
Oct 200901772.544.11$70
Sep 2009010365.543.06$316
Aug 20091967267.423.22$13,446
Jul 200904361.133.46$149
Jun 200906266.163.90$241
May 200907054.743.93$275
Apr 200905246.773.59$187
Mar 200905442.144.06$219
Feb 20091737232.814.63$6,010
Jan 2009010235.865.37$548
Dec 200809037.105.98$538
Nov 2008011655.496.86$796
Oct 2008012075.246.92$831
Sep 20080125101.767.88$985
Aug 20080120114.228.48$1,018
Jul 2008176168131.0811.39$24,984
Jun 20080157131.3313.03$2,046
May 20080178123.1711.57$2,060
Apr 20080217110.3110.45$2,269
Mar 2008178214101.909.66$20,206
Feb 2008013692.538.77$1,193
Jan 2008019090.388.21$1,559
Dec 2007022388.337.30$1,628
Nov 2007023791.677.29$1,728
Oct 200716924182.856.92$15,670
Sep 2007022775.846.24$1,417
Aug 2007023569.066.39$1,501
Jul 2007032270.906.39$2,057
Jun 200716824362.007.55$12,250
May 2007030658.747.85$2,401
Apr 2007033959.617.81$2,646
Mar 200717036256.927.30$12,320
Feb 200718133555.108.22$12,725
Jan 2007033350.306.73$2,240
Dec 200617334456.656.92$12,180
Nov 2006035354.207.62$2,689
Oct 200618238154.906.01$12,283
Sep 200617339460.085.04$12,379
Aug 2006035668.717.34$2,613
Jul 200617238969.376.34$14,399
Jun 200617630566.286.38$13,612
May 200616738066.016.42$13,465
Apr 2006034664.397.36$2,547
Mar 200617034556.707.08$12,083
Feb 2006029657.597.75$2,294
Jan 200617233060.598.93$13,369
Dec 2005031954.9413.42$4,280
Nov 200517731154.6910.59$12,973
Oct 2005032358.3413.80$4,456
Sep 200516633861.4512.08$14,283
Aug 2005034061.519.80$3,331
Jul 200517538055.697.84$12,726
Jun 2005036552.337.38$2,694
May 200517639045.226.65$10,553
Apr 200517425149.207.36$10,408
Mar 2005031350.377.15$2,239
Feb 200517428945.226.31$9,692
Jan 2005035143.166.32$2,219
Dec 200416839039.866.75$9,329
Nov 2004039445.286.33$2,494
Oct 2004035349.706.52$2,300
Sep 200416634043.245.28$8,974
Aug 2004040242.375.55$2,231
Jul 200417143738.286.08$9,205
Jun 2004043036.106.43$2,766
May 200410446237.486.49$6,898
Apr 2004042534.475.86$2,490
Mar 2004032134.365.53$1,775

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2026 — as filed, then multipliedworked
Oil                  154 bbl  × $ 89.75 =    $13,822
Casinghead gas         0 Mcf  × $  3.15 =         $0

────────────────────────────────────────────────────
Month total                                  $13,822

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/14306 is the state's own key, not one this site invented.