BAUGHMAN, M. A.

Operated by BIG RUN PRODUCTION COMPANY (P-5 70370) in the MINDEN (TRAVIS PEAK CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14598District 06Field 61792380OilCasinghead gasSaveExport
Value, all time
$2.4 M
Apr 2006 – May 2026
Value, last 12 filed months
$78 k
at the published price for each month
Months reported
242
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 304 leases and 325 wells, and the rule below applies to all of them.

Discovered
2006-03-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: EFF. 11-12-08. ALLOCATION FORMULA REMAINS SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition22,399 bbl$1,593,251
Casinghead gasProduction176,024 Mcf$803,959
Total$2,397,210

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0912, -94.6676. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.09121, -94.66756 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,952 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,952 ft.

Completions filed
Apr 1984
1 of 1 wells

1 well

42-4013182417,952 ftApr 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (242)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

242 months

May 202600106.413.05$0
Apr 202615653798.932.87$16,974
Mar 2026046689.753.15$1,468
Feb 2026036063.503.75$1,350
Jan 202601,02459.138.00$8,190
Dec 202513857356.664.41$10,348
Nov 202516254358.593.93$11,624
Oct 20250059.383.30$0
Sep 202516456062.743.08$12,012
Aug 2025061663.933.01$1,857
Jul 202514967266.743.32$12,172
Jun 2025071166.483.13$2,225
May 2025059260.553.23$1,914
Apr 202516748562.363.54$12,133
Mar 2025044767.704.27$1,908
Feb 2025045570.884.34$1,975
Jan 202515834574.324.28$13,219
Dec 2024050268.993.12$1,567
Nov 202416458969.052.20$12,619
Oct 2024039171.372.28$892
Sep 2024025969.612.36$612
Aug 2024224075.632.06$647
Jul 2024021779.932.15$466
Jun 202415819078.082.63$12,837
May 2024033478.812.20$734
Apr 202416734184.451.66$14,669
Mar 2024063580.301.55$981
Feb 202416757076.091.78$13,724
Jan 2024060573.023.30$1,995
Dec 202316770771.262.61$13,746
Nov 2023088577.892.81$2,485
Oct 202314557685.443.09$14,167
Sep 2023067989.042.74$1,857
Aug 2023053780.522.67$1,435
Jul 202316751174.852.64$13,850
Jun 202315746568.962.26$11,877
May 2023055770.622.23$1,241
Apr 202317256678.122.24$14,703
Mar 2023071372.852.39$1,706
Feb 202316653275.112.47$13,780
Jan 2023060376.533.39$2,043
Dec 202217268376.415.73$17,055
Nov 202201,03685.005.65$5,849
Oct 202216750287.185.86$17,503
Sep 2022063984.888.16$5,217
Aug 20221581,23894.529.13$26,234
Jul 20220363101.587.54$2,738
Jun 20221665,552115.097.98$63,394
May 20220720109.378.43$6,072
Apr 20221730104.226.84$18,030
Mar 2022173560108.885.08$21,679
Feb 2022066691.054.86$3,236
Jan 202216478381.844.54$16,975
Dec 20210071.323.90$0
Nov 2021067877.435.24$3,551
Oct 202115456679.795.71$15,522
Sep 2021055869.865.35$2,986
Aug 2021084366.024.22$3,558
Jul 20210070.783.98$0
Jun 2021052869.493.38$1,785
May 2021039663.483.02$1,195
Apr 202115557860.362.76$10,950
Mar 2021048661.302.72$1,320
Feb 202116752357.805.55$12,554
Jan 2021040250.412.81$1,130
Dec 202011754144.642.68$6,670
Nov 202016764338.772.71$8,215
Oct 202016652836.972.48$7,446
Sep 202012972937.091.99$6,236
Aug 202017761739.982.39$8,548
Jul 2020048938.371.83$892
Jun 2020036934.901.69$624
May 2020060016.921.81$1,089
Apr 2020066514.751.80$1,200
Mar 20207847530.341.86$3,248
Feb 202017052449.881.98$9,517
Jan 2020047357.252.09$991
Dec 201917055459.012.30$11,308
Nov 2019051455.302.75$1,414
Oct 201917949953.472.42$10,778
Sep 201915165855.052.66$10,061
Aug 2019041153.112.30$947
Jul 2019059556.272.46$1,464
Jun 201917346252.782.49$10,282
May 2019062758.482.74$1,718
Apr 2019040662.632.75$1,117
Mar 201917565056.803.06$11,930
Feb 201916665850.852.79$10,278
Jan 2019038246.033.23$1,233
Dec 2018067046.594.19$2,804
Nov 201815560552.934.24$10,768
Oct 201816440261.443.40$11,442
Sep 2018031359.543.11$973
Aug 201815342559.403.07$10,391
Jul 2018044265.142.93$1,296
Jun 2018039360.183.08$1,209
May 201817141965.382.90$12,395
Apr 201815831563.842.90$11,000
Mar 2018037761.222.79$1,051
Feb 2018044761.782.77$1,236
Jan 201814832962.874.01$10,624
Dec 201716675357.272.92$11,707
Nov 2017035955.423.12$1,119
Oct 201715848349.292.98$9,229
Sep 2017040347.523.09$1,244
Aug 201715942945.373.00$8,503
Jul 201716543043.873.09$8,566
Jun 2017059242.493.09$1,828
May 2017075245.373.26$2,454
Apr 201716758847.933.21$9,893
Mar 201714962146.772.98$8,822
Feb 2017040250.452.95$1,187
Jan 2017020349.413.42$694
Dec 2016030348.763.72$1,128
Nov 201616254842.492.64$8,332
Oct 2016071346.193.09$2,203
Sep 201615749041.553.10$8,043
Aug 201616259741.442.92$8,459
Jul 2016056541.622.92$1,652
Jun 201615162245.352.69$8,518
May 2016045642.521.99$908
Apr 201617451936.561.99$7,395
Mar 201616045033.011.79$6,089
Feb 201617428226.472.06$5,188
Jan 2016070027.352.36$1,655
Dec 2015058932.362.00$1,179
Nov 201517658338.792.17$8,091
Oct 2015089143.552.43$2,162
Sep 201515788842.992.76$9,199
Aug 201516574440.162.87$8,764
Jul 2015073548.152.95$2,165
Jun 201516781556.152.88$11,727
May 201516273155.212.96$11,104
Apr 2015062649.822.71$1,694
Mar 20151491,06342.892.93$9,510
Feb 201514562444.662.98$8,333
Jan 201516989043.433.10$10,099
Dec 2014077854.693.59$2,794
Nov 2014055170.464.25$2,343
Oct 201417479778.303.90$16,733
Sep 201415764286.164.05$16,124
Aug 2014031889.394.04$1,283
Jul 201416845896.564.18$18,136
Jun 201417566298.164.74$20,314
May 201401,09494.734.73$5,171
Apr 201416865495.944.81$19,263
Mar 201417354595.895.06$19,345
Feb 2014069997.406.19$4,328
Jan 201416982890.404.86$19,302
Dec 2013069791.824.35$3,035
Nov 201317471388.853.74$18,125
Oct 201316887897.423.78$19,685
Sep 20130735104.113.72$2,733
Aug 2013173701104.253.52$20,505
Jul 20130736102.523.72$2,736
Jun 201317156694.403.93$18,369
May 2013058394.834.15$2,419
Apr 20138769193.964.28$11,134
Mar 20131761,00393.623.91$20,402
Feb 201316971691.233.42$17,867
Jan 2013089091.603.42$3,044
Dec 201217573186.773.42$17,685
Nov 201201,19686.953.62$4,335
Oct 201216966789.383.40$17,373
Sep 2012072994.672.92$2,128
Aug 201217795492.662.91$19,175
Jul 201217172885.133.02$16,756
Jun 201217799279.822.52$16,627
May 201201,11391.612.49$2,770
Apr 201201,031101.652.00$2,059
Mar 2012153917105.052.22$18,110
Feb 2012175971101.102.57$20,188
Jan 20121741,19598.092.73$20,335
Dec 201101,26496.873.24$4,095
Nov 2011096795.723.31$3,202
Oct 20111621,18284.983.65$18,079
Sep 201115794983.623.99$16,911
Aug 20111651,11083.404.15$18,367
Jul 201101,23694.144.52$5,583
Jun 201116277292.904.64$18,632
May 20111741,05398.134.40$21,713
Apr 20110938105.964.33$4,065
Mar 201116786796.364.06$19,610
Feb 201117084485.644.18$18,087
Jan 20111701,36086.504.59$20,946
Dec 20101581,02885.734.35$18,015
Nov 2010063780.843.80$2,418
Oct 201001,03078.103.51$3,614
Sep 201015788972.633.98$14,941
Aug 20101601,23473.684.42$17,242
Jul 201001,03972.554.74$4,921
Jun 201015945670.364.91$13,426
May 2010072171.124.24$3,054
Apr 201017480181.694.12$17,516
Mar 201017173378.394.39$16,622
Feb 2010075973.585.44$4,131
Jan 201015438374.365.96$13,736
Dec 200917160371.445.48$15,523
Nov 2009086074.593.75$3,226
Oct 200915679172.544.11$14,567
Sep 200901,04065.543.06$3,187
Aug 200917499767.423.22$14,940
Jul 200914345761.133.46$10,325
Jun 200917678066.163.90$14,682
May 200901,07454.743.93$4,216
Apr 200917093346.773.59$11,298
Mar 20091781,06442.144.06$11,820
Feb 200915547432.814.63$7,282
Jan 2009048935.865.37$2,626
Dec 2008067637.105.98$4,041
Nov 200817354755.496.86$13,352
Oct 2008050575.246.92$3,496
Sep 20080781101.767.88$6,152
Aug 20081560114.228.48$17,818
Jul 2008174828131.0811.39$32,238
Jun 2008168950131.3313.03$34,444
May 20081641,076123.1711.57$32,654
Apr 20080844110.3110.45$8,824
Mar 2008168801101.909.66$24,860
Feb 2008094592.538.77$8,288
Jan 20081811,08290.388.21$25,237
Dec 2007069888.337.30$5,097
Nov 20073351,95991.677.29$44,994
Oct 20070082.856.92$0
Sep 20073071,76975.846.24$34,329
Aug 200701,74069.066.39$11,115
Jul 20071792,40870.906.39$28,073
Jun 20071641,46362.007.55$21,211
May 20071801,53158.747.85$22,586
Apr 200701,43359.617.81$11,185
Mar 20071801,65556.927.30$22,330
Feb 200701,32555.108.22$10,886
Jan 20071811,33850.306.73$18,105
Dec 20061791,18756.656.92$18,353
Nov 20061681,43954.207.62$20,067
Oct 20061711,41554.906.01$17,897
Sep 20061711,16960.085.04$16,162
Aug 20061781,17068.717.34$20,818
Jul 20061731,51569.376.34$21,610
Jun 20061791,20866.286.38$19,576
May 20061801,12966.016.42$19,136
Apr 20069893064.397.36$13,155

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  156 bbl  × $ 98.93 =    $15,433
Casinghead gas       537 Mcf  × $  2.87 =     $1,541

────────────────────────────────────────────────────
Month total                                  $16,974

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/14598 is the state's own key, not one this site invented.