GOLDMAN, DR. JOSEPH L. UNIT

Operated by PROLINE ENERGY RESOURCES INC (P-5 681327) in the SCOOBER CREEK (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 14864District 06Field 81706610OilCasinghead gasSaveExport
Value, all time
$90 k
Nov 2008 – May 2026
Value, last 12 filed months
$73
at the published price for each month
Months reported
211
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1971-08-16
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition555 bbl$43,657
Casinghead gasProduction13,184 Mcf$46,842
Total$90,500

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0570, -94.9907. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.05697, -94.99074 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,600 ft.

Completions filed
Nov 2008
1 of 1 wells

1 well

42-0733140328,600 ftNov 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (211)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

211 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250356.664.41$13
Nov 20250358.593.93$12
Oct 20250359.383.30$10
Sep 20250362.743.08$9
Aug 20250363.933.01$9
Jul 20250366.743.32$10
Jun 20250366.483.13$9
May 20250360.553.23$10
Apr 20250362.363.54$11
Mar 20250367.704.27$13
Feb 20250370.884.34$13
Jan 20250374.324.28$13
Dec 20240368.993.12$9
Nov 20240369.052.20$7
Oct 20240371.372.28$7
Sep 20240369.612.36$7
Aug 20240375.632.06$6
Jul 20240379.932.15$6
Jun 20240378.082.63$8
May 20240278.812.20$4
Apr 20240384.451.66$5
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200544.642.68$13
Nov 202001938.772.71$51
Oct 202001736.972.48$42
Sep 202002237.091.99$44
Aug 202001439.982.39$33
Jul 202001638.371.83$29
Jun 202001234.901.69$20
May 202001216.921.81$22
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 202003049.881.98$59
Jan 202003757.252.09$78
Dec 201903859.012.30$88
Nov 201903455.302.75$94
Oct 2019010253.472.42$247
Sep 2019010055.052.66$266
Aug 2019041153.112.30$947
Jul 2019060156.272.46$1,479
Jun 2019015252.782.49$379
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 2019130056.803.06$7,384
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 201805065.382.90$145
Apr 20181253363.842.90$8,076
Mar 201804161.222.79$114
Feb 2018017361.782.77$479
Jan 2018025862.874.01$1,034
Dec 2017042357.272.92$1,236
Nov 2017052155.423.12$1,625
Oct 2017027549.292.98$821
Sep 201704247.523.09$130
Aug 201705245.373.00$156
Jul 201703543.873.09$108
Jun 201702642.493.09$80
May 201704745.373.26$153
Apr 201705347.933.21$170
Mar 201708346.772.98$248
Feb 201701550.452.95$44
Jan 201702549.413.42$85
Dec 201608848.763.72$328
Nov 201606942.492.64$182
Oct 201608746.193.09$269
Sep 201605341.553.10$164
Aug 201602141.442.92$61
Jul 20160241.622.92$6
Jun 20160445.352.69$11
May 201603642.521.99$72
Apr 201605536.561.99$110
Mar 201604333.011.79$77
Feb 201606426.472.06$132
Jan 201605927.352.36$140
Dec 201505332.362.00$106
Nov 20150238.792.17$4
Oct 20150243.552.43$5
Sep 20150342.992.76$8
Aug 20150240.162.87$6
Jul 20150248.152.95$6
Jun 20150256.152.88$6
May 20150055.212.96$0
Apr 20150249.822.71$5
Mar 201505442.892.93$158
Feb 201508344.662.98$247
Jan 201504243.433.10$130
Dec 20140154.693.59$4
Nov 20140870.464.25$34
Oct 20140278.303.90$8
Sep 20140186.164.05$4
Aug 20140189.394.04$4
Jul 20140196.564.18$4
Jun 20140098.164.74$0
May 201404594.734.73$213
Apr 201408795.944.81$418
Mar 201406595.895.06$329
Feb 20140497.406.19$25
Jan 201402590.404.86$122
Dec 20130891.824.35$35
Nov 201308388.853.74$310
Oct 20130397.423.78$11
Sep 201306104.113.72$22
Aug 201307104.253.52$25
Jul 201301102.523.72$4
Jun 201303894.403.93$149
May 2013020994.834.15$867
Apr 2013013693.964.28$582
Mar 201309093.623.91$352
Feb 2013016691.233.42$568
Jan 201301591.603.42$51
Dec 2012021186.773.42$722
Nov 201202086.953.62$73
Oct 2012011089.383.40$374
Sep 2012011794.672.92$341
Aug 201206092.662.91$174
Jul 201206185.133.02$184
Jun 201201679.822.52$40
May 201205891.612.49$144
Apr 20120101101.652.00$202
Mar 2012053105.052.22$118
Feb 201216666101.102.57$16,952
Jan 2012012898.092.73$350
Dec 2011012096.873.24$389
Nov 201105695.723.31$185
Oct 2011020184.983.65$733
Sep 201104783.623.99$187
Aug 201106583.404.15$270
Jul 201108494.144.52$379
Jun 2011015092.904.64$696
May 2011115398.134.40$772
Apr 2011063105.964.33$273
Mar 2011113796.364.06$652
Feb 2011013585.644.18$564
Jan 2011013586.504.59$619
Dec 2010132085.734.35$11,316
Nov 2010017980.843.80$679
Oct 2010018578.103.51$649
Sep 2010020572.633.98$816
Aug 2010017273.684.42$760
Jul 2010030572.554.74$1,445
Jun 2010032370.364.91$1,586
May 201006271.124.24$263
Apr 2010013381.694.12$548
Mar 2010021778.394.39$952
Feb 201007773.585.44$419
Jan 2010025874.365.96$1,539
Dec 2009026971.445.48$1,475
Nov 2009013174.593.75$491
Oct 2009018572.544.11$760
Sep 2009027665.543.06$846
Aug 2009032667.423.22$1,049
Jul 2009037661.133.46$1,303
Jun 2009024266.163.90$943
May 2009069754.743.93$2,736
Apr 2009055346.773.59$1,984
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2025 — as filed, then multipliedworked
Oil                    0 bbl  × $ 56.66 =         $0
Casinghead gas         3 Mcf  × $  4.41 =        $13

────────────────────────────────────────────────────
Month total                                      $13

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/O/14864 is the state's own key, not one this site invented.