TADPOLE

Operated by FOREST OIL CORPORATION (P-5 275740) in the VERMEJO (DELAWARE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 105550District 08Field 93584300CondensateGasSaveExport
Value, all time
$95 k
Jan 1993 – Mar 2009
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
195
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 23 leases and 23 wells, and the rule below applies to all of them.

Discovered
1978-10-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-05-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition724 bbl$16,281
GasProduction39,654 Mcf$78,652
Total$94,934

19,971 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6721, -103.5462. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.67207, -103.54623 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,676 ft
1 wells filed one
Completion to plug
29.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,676 ft.

Completions filed
Oct 1978
1 of 1 wells
Plug dates filed
Sep 2008
1 of 1 wells

Last completion to plug: a median of 29.9 years across the 1 well that filed both dates, with the middle half between 29.9 years and 29.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3013020914,676 ftOct 1978Sep 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (195)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

195 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 200834075.246.92$2,558
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 200404143.245.28$217
Aug 200406042.375.55$333
Jul 200405138.286.08$310
Jun 2004010036.106.43$643
May 2004430437.486.49$2,124
Apr 200406034.475.86$352
Mar 200410712234.365.53$4,351
Feb 2004033932.455.51$1,868
Jan 2004033132.036.30$2,085
Dec 2003043330.266.30$2,729
Nov 2003016128.804.60$740
Oct 2003025828.174.76$1,228
Sep 200308226.314.75$389
Aug 2003024129.765.13$1,236
Jul 200305229.415.17$269
Jun 200306428.565.98$383
May 200303226.595.97$191
Apr 2003011126.675.41$600
Mar 200306731.146.10$408
Feb 200301833.487.93$143
Jan 2003024330.315.58$1,356
Dec 2002015126.914.85$733
Nov 2002033424.664.14$1,382
Oct 200205626.464.23$237
Sep 200204827.443.64$174
Aug 200206825.963.16$215
Jul 2002021224.583.06$649
Jun 2002013223.733.34$441
May 200205824.663.58$208
Apr 2002017423.653.51$611
Mar 2002021722.003.10$673
Feb 2002011518.222.38$273
Jan 200204517.172.38$107
Dec 2001019116.932.36$452
Nov 2001015418.072.41$370
Oct 2001026319.782.53$665
Sep 2001018924.262.25$426
Aug 2001031224.873.05$953
Jul 2001065923.933.20$2,107
Jun 2001063224.563.82$2,417
May 2001016225.524.31$698
Apr 2001025224.685.34$1,345
Mar 2001037524.545.38$2,016
Feb 2001034327.755.77$1,978
Jan 2001048527.478.40$4,073
Dec 2000059926.889.12$5,464
Nov 2000045832.215.66$2,591
Oct 2000057131.235.15$2,938
Sep 2000039831.875.19$2,064
Aug 2000045429.644.54$2,062
Jul 2000041828.534.09$1,710
Jun 2000027829.304.40$1,222
May 2000135327.263.68$1,326
Apr 2000023124.513.12$720
Mar 2000029528.422.86$844
Feb 2000019027.622.73$518
Jan 2000115625.272.48$412
Dec 1999028124.282.42$681
Nov 1999136823.192.43$919
Oct 199915636620.982.80$4,299
Sep 1999023721.752.62$621
Aug 1999010419.262.88$299
Jul 1999012117.892.37$287
Jun 1999014015.942.36$331
May 1999027915.792.32$648
Apr 1999019415.102.21$428
Mar 1999031012.471.84$570
Feb 19990699.981.82$125
Jan 1999020910.381.90$397
Dec 199832939.201.77$547
Nov 1998029910.892.19$654
Oct 1998124212.421.97$489
Sep 1998013012.592.08$271
Aug 1998010511.301.91$200
Jul 1998015211.742.24$340
Jun 1998022911.242.24$512
May 1998014112.622.21$311
Apr 1998012513.042.51$313
Mar 1998018812.802.31$434
Feb 1998017313.952.30$398
Jan 199806314.702.15$136
Dec 1997017016.322.41$410
Nov 1997018318.193.09$565
Oct 1997043419.253.15$1,367
Sep 1997027417.742.95$810
Aug 199709717.862.55$248
Jul 199704717.582.25$106
Jun 1997012017.242.26$271
May 199704318.972.31$99
Apr 199708617.882.08$179
Mar 199707618.951.94$147
Feb 199704420.492.21$97
Jan 199709323.483.54$329
Dec 1996015623.32$0
Nov 1996011221.97$0
Oct 199603223.31$0
Sep 199608722.22$0
Aug 1996011620.26$0
Jul 1996029719.55$0
Jun 1996079918.73$0
May 1996024719.43$0
Apr 199608221.51$0
Mar 199609319.38$0
Feb 1996010116.98$0
Jan 1996012717.07$0
Dec 1995010517.19$0
Nov 199505316.00$0
Oct 199502215.43$0
Sep 1995012216.18$0
Aug 1995020515.92$0
Jul 1995035715.24$0
Jun 1995028916.41$0
May 1995025217.56$0
Apr 1995030117.73$0
Mar 1995038116.44$0
Feb 1995028316.58$0
Jan 1995025515.92$0
Dec 1994026915.03$0
Nov 1994026715.90$0
Oct 1994038015.58$0
Sep 1994038515.29$0
Aug 1994020216.13$0
Jul 1994021117.56$0
Jun 1994028117.09$0
May 1994029415.88$0
Apr 1994029314.14$0
Mar 1994033612.46$0
Feb 1994074012.50$0
Jan 1994081412.66$0
Dec 1993060012.33$0
Nov 19931170014.49$159
Oct 199322467315.85$3,550
Sep 1993062115.03$0
Aug 1993074715.66$0
Jul 199318154215.46$2,798
Jun 1993056616.79$0
May 1993073217.68$0
Apr 199301,05918.05$0
Mar 199301,30318.14$0
Feb 199301,96217.90$0
Jan 199301,12016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2008 — as filed, then multipliedworked
Condensate            34 bbl  × $ 75.24 =     $2,558
Gas                    0 Mcf  × $  6.92 =         $0

────────────────────────────────────────────────────
Month total                                   $2,558

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/105550 is the state's own key, not one this site invented.