FEE "Q"

Operated by FASKEN OIL AND RANCH, LTD. (P-5 263696) in the INEZ (DEEP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 122542District 08Field 44521350Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$611 k
Jan 1993 – Sep 2018
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
309
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 29 wells, and the rule below applies to all of them.

Discovered
1989-03-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,400 ft
minimum
From a lease line
550 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1989-03-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: EFF 05/21/2019

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$448
GasProduction179,754 Mcf$610,172
Total$610,620

54,153 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1673, -102.3900. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.16732, -102.39001 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
12,779 ft
1 wells filed one
Completion to plug
3 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,779 ft.

Completions filed
Jun 2018
1 of 1 wells
Plug dates filed
Sep 2018
1 of 1 wells

Last completion to plug: a median of 3 months across the 1 well that filed both dates, with the middle half between 3 months and 3 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-00310134412,779 ftJun 2018Sep 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (309)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

309 months

Sep 20181159.543.11$63
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180165.382.90$3
Apr 2018011263.842.90$325
Mar 2018023461.222.79$652
Feb 201803861.782.77$105
Jan 201803862.874.01$152
Dec 201702457.272.92$70
Nov 201703955.423.12$122
Oct 201703149.292.98$92
Sep 201703447.523.09$105
Aug 201702945.373.00$87
Jul 201702643.873.09$80
Jun 201703642.493.09$111
May 201702145.373.26$69
Apr 201701047.933.21$32
Mar 201701346.772.98$39
Feb 201702150.452.95$62
Jan 201702949.413.42$99
Dec 201602248.763.72$82
Nov 201604442.492.64$116
Oct 201604746.193.09$145
Sep 201601941.553.10$59
Aug 201605941.442.92$173
Jul 201603641.622.92$105
Jun 201604145.352.69$110
May 201603842.521.99$76
Apr 201605636.561.99$112
Mar 201606533.011.79$117
Feb 201606626.472.06$136
Jan 201601127.352.36$26
Dec 20150032.362.00$0
Nov 20150138.792.17$2
Oct 20150043.552.43$0
Sep 201504742.992.76$130
Aug 201506540.162.87$187
Jul 201505048.152.95$147
Jun 201502156.152.88$61
May 201502755.212.96$80
Apr 201505149.822.71$138
Mar 201505542.892.93$161
Feb 201505244.662.98$155
Jan 201503643.433.10$112
Dec 20140354.693.59$11
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 201403595.944.81$168
Mar 201406095.895.06$303
Feb 201404997.406.19$303
Jan 201406390.404.86$306
Dec 201305391.824.35$231
Nov 201303888.853.74$142
Oct 201301397.423.78$49
Sep 2013020104.113.72$74
Aug 201308104.253.52$28
Jul 201303102.523.72$11
Jun 20130294.403.93$8
May 20130794.834.15$29
Apr 201301293.964.28$51
Mar 201303093.623.91$117
Feb 201303591.233.42$120
Jan 20130191.603.42$3
Dec 201201386.773.42$44
Nov 20120786.953.62$25
Oct 201201389.383.40$44
Sep 201202494.672.92$70
Aug 201202592.662.91$73
Jul 201201485.133.02$42
Jun 201202579.822.52$63
May 201203491.612.49$85
Apr 2012017101.652.00$34
Mar 2012024105.052.22$53
Feb 2012048101.102.57$123
Jan 201208598.092.73$232
Dec 201102496.873.24$78
Nov 201102895.723.31$93
Oct 20110584.983.65$18
Sep 2011012083.623.99$478
Aug 201101283.404.15$50
Jul 20110294.144.52$9
Jun 2011034192.904.64$1,582
May 2011047598.134.40$2,092
Apr 20110562105.964.33$2,435
Mar 2011053496.364.06$2,167
Feb 2011064085.644.18$2,675
Jan 2011046786.504.59$2,143
Dec 2010055285.734.35$2,400
Nov 2010067180.843.80$2,547
Oct 2010075678.103.51$2,653
Sep 2010036372.633.98$1,445
Aug 2010040473.684.42$1,785
Jul 2010041672.554.74$1,970
Jun 2010040370.364.91$1,979
May 2010043171.124.24$1,825
Apr 2010043781.694.12$1,802
Mar 2010045478.394.39$1,992
Feb 2010042773.585.44$2,324
Jan 2010047674.365.96$2,839
Dec 2009042571.445.48$2,331
Nov 2009044974.593.75$1,684
Oct 2009071772.544.11$2,947
Sep 2009044565.543.06$1,364
Aug 2009045967.423.22$1,477
Jul 2009051161.133.46$1,770
Jun 2009048766.163.90$1,897
May 2009054654.743.93$2,143
Apr 2009061746.773.59$2,213
Mar 2009067642.144.06$2,744
Feb 2009058132.814.63$2,692
Jan 200907735.865.37$414
Dec 2008022137.105.98$1,321
Nov 2008029155.496.86$1,996
Oct 2008059975.246.92$4,146
Sep 20080336101.767.88$2,647
Aug 20080549114.228.48$4,657
Jul 20080768131.0811.39$8,747
Jun 20080289131.3313.03$3,766
May 20080494123.1711.57$5,718
Apr 20080475110.3110.45$4,966
Mar 20082399101.909.66$4,060
Feb 2008243592.538.77$4,000
Jan 2008046490.388.21$3,807
Dec 2007047288.337.30$3,447
Nov 2007044991.677.29$3,274
Oct 2007048282.856.92$3,336
Sep 2007044675.846.24$2,785
Aug 2007049969.066.39$3,188
Jul 2007047570.906.39$3,034
Jun 2007048762.007.55$3,676
May 2007046358.747.85$3,633
Apr 2007044259.617.81$3,450
Mar 2007051956.927.30$3,790
Feb 2007040655.108.22$3,336
Jan 2007040750.306.73$2,738
Dec 2006052256.656.92$3,611
Nov 2006032654.207.62$2,483
Oct 2006060754.906.01$3,650
Sep 2006047560.085.04$2,393
Aug 2006067168.717.34$4,925
Jul 2006086169.376.34$5,461
Jun 2006055966.286.38$3,569
May 2006059866.016.42$3,842
Apr 2006072664.397.36$5,344
Mar 2006080456.707.08$5,695
Feb 2006074757.597.75$5,790
Jan 2006064660.598.93$5,771
Dec 2005061454.9413.42$8,237
Nov 2005078154.6910.59$8,270
Oct 2005083058.3413.80$11,450
Sep 2005063161.4512.08$7,622
Aug 2005074761.519.80$7,318
Jul 2005080955.697.84$6,346
Jun 2005089252.337.38$6,584
May 2005096845.226.65$6,438
Apr 2005087949.207.36$6,470
Mar 2005058950.377.15$4,214
Feb 2005068045.226.31$4,292
Jan 2005083243.166.32$5,260
Dec 2004088539.866.75$5,975
Nov 2004088645.286.33$5,609
Oct 200401,01349.706.52$6,600
Sep 2004089243.245.28$4,713
Aug 2004087842.375.55$4,873
Jul 2004091638.286.08$5,573
Jun 2004085036.106.43$5,468
May 2004081537.486.49$5,293
Apr 2004079334.475.86$4,646
Mar 2004089234.365.53$4,933
Feb 2004085432.455.51$4,705
Jan 2004092332.036.30$5,815
Dec 2003084830.266.30$5,344
Nov 2003092928.804.60$4,269
Oct 200301,02728.174.76$4,888
Sep 2003093126.314.75$4,422
Aug 2003098629.765.13$5,058
Jul 2003096929.415.17$5,011
Jun 2003063228.565.98$3,781
May 2003096126.595.97$5,740
Apr 2003077226.675.41$4,174
Mar 2003094331.146.10$5,749
Feb 2003084833.487.93$6,721
Jan 2003071030.315.58$3,963
Dec 2002083226.914.85$4,038
Nov 2002091624.664.14$3,789
Oct 200201,00126.464.23$4,233
Sep 2002089327.443.64$3,246
Aug 2002075225.963.16$2,379
Jul 2002093124.583.06$2,851
Jun 2002097823.733.34$3,265
May 200201,01024.663.58$3,620
Apr 2002095023.653.51$3,337
Mar 2002081822.003.10$2,538
Feb 2002096418.222.38$2,290
Jan 2002091717.172.38$2,179
Dec 2001093516.932.36$2,211
Nov 2001080218.072.41$1,929
Oct 200101,02219.782.53$2,585
Sep 2001088524.262.25$1,992
Aug 2001057524.873.05$1,756
Jul 2001078723.933.20$2,516
Jun 2001068424.563.82$2,616
May 2001057525.524.31$2,477
Apr 2001065524.685.34$3,495
Mar 2001071324.545.38$3,833
Feb 200101,04027.755.77$5,998
Jan 200101,33627.478.40$11,221
Dec 2000095426.889.12$8,703
Nov 2000053832.215.66$3,044
Oct 2000067031.235.15$3,447
Sep 2000073531.875.19$3,812
Aug 2000091129.644.54$4,137
Jul 200001,04028.534.09$4,253
Jun 200001,14729.304.40$5,044
May 200001,06627.263.68$3,923
Apr 200001,21724.513.12$3,792
Mar 2000059028.422.86$1,687
Feb 2000070127.622.73$1,911
Jan 2000071725.272.48$1,779
Dec 1999073224.282.42$1,774
Nov 1999079023.192.43$1,923
Oct 1999078420.982.80$2,198
Sep 1999068421.752.62$1,791
Aug 1999053619.262.88$1,541
Jul 1999068917.892.37$1,635
Jun 1999046015.942.36$1,087
May 1999062015.792.32$1,439
Apr 1999072815.102.21$1,607
Mar 1999069512.471.84$1,278
Feb 199905979.981.82$1,085
Jan 1999082110.381.90$1,560
Dec 199806999.201.77$1,240
Nov 1998088610.892.19$1,937
Oct 1998074312.421.97$1,463
Sep 1998087512.592.08$1,822
Aug 199801,15611.301.91$2,205
Jul 1998078511.742.24$1,756
Jun 1998077511.242.24$1,734
May 1998075412.622.21$1,664
Apr 1998070713.042.51$1,771
Mar 1998070612.802.31$1,630
Feb 1998079813.952.30$1,835
Jan 1998087714.702.15$1,890
Dec 1997083516.322.41$2,013
Nov 1997071618.193.09$2,211
Oct 1997075219.253.15$2,369
Sep 1997099317.742.95$2,934
Aug 199701,03117.862.55$2,634
Jul 199701,03617.582.25$2,328
Jun 1997096817.242.26$2,185
May 1997085718.972.31$1,978
Apr 1997076717.882.08$1,597
Mar 1997066018.951.94$1,280
Feb 1997068420.492.21$1,509
Jan 1997093723.483.54$3,317
Dec 1996097423.32$0
Nov 199601,01221.97$0
Oct 199601,15323.31$0
Sep 199601,03822.22$0
Aug 199601,19720.26$0
Jul 199601,18219.55$0
Jun 199601,09618.73$0
May 199601,29519.43$0
Apr 199601,16721.51$0
Mar 199601,12219.38$0
Feb 199601,10516.98$0
Jan 199601,01717.07$0
Dec 199501,01317.19$0
Nov 199501,11316.00$0
Oct 1995099915.43$0
Sep 199501,13716.18$0
Aug 199501,19415.92$0
Jul 199501,15915.24$0
Jun 199501,19416.41$0
May 1995093117.56$0
Apr 1995078817.73$0
Mar 199501,09516.44$0
Feb 1995090216.58$0
Jan 199501,07415.92$0
Dec 199401,03515.03$0
Nov 1994096715.90$0
Oct 199401,07515.58$0
Sep 199401,00115.29$0
Aug 199401,07016.13$0
Jul 199401,05117.56$0
Jun 199401,21617.09$0
May 199401,21715.88$0
Apr 199401,03914.14$0
Mar 199401,27712.46$0
Feb 1994099712.50$0
Jan 199401,28812.66$0
Dec 199301,08012.33$0
Nov 199301,27914.49$0
Oct 199301,08115.85$0
Sep 199301,21215.03$0
Aug 199301,13115.66$0
Jul 199301,34415.46$0
Jun 199301,40816.79$0
May 199301,11917.68$0
Apr 199301,37118.05$0
Mar 199301,28018.14$0
Feb 199301,22017.90$0
Jan 199301,43816.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2018 — as filed, then multipliedworked
Condensate             1 bbl  × $ 59.54 =        $60
Gas                    1 Mcf  × $  3.11 =         $3

────────────────────────────────────────────────────
Month total                                      $63

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/122542 is the state's own key, not one this site invented.