SUGG "D"

Operated by P1 ENERGY, LLC (P-5 631633) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 139504District 08Field 852803002 tax incentive programmesCondensateGasSaveExport
Value, all time
$269 k
Jan 1993 – May 2026
Value, last 12 filed months
$256
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 16,587 leases and 43,997 wells, and the rule below applies to all of them.

Discovered
1952-12-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-02-13.

The Commission's schedule remark for this field reads: SPRABERRY (TREND AREA) FIELD EFFECTIVE 10/1/2019.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111992-01-07124479
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,954 bbl$57,273
GasProduction144,338 Mcf$211,832
Total$269,105

91,640 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6080, -101.1185. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.60805, -101.11850 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,722 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,722 ft.

Completions filed
Jul 1989
1 of 1 wells

1 well

42-4313199019027,722 ftJul 1989

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260798.932.87$20
Mar 20260689.753.15$19
Feb 20260563.503.75$19
Jan 20260659.138.00$48
Dec 20250856.664.41$35
Nov 20250658.593.93$24
Oct 20250659.383.30$20
Sep 20250562.743.08$15
Aug 20250763.933.01$21
Jul 20250666.743.32$20
Jun 20250566.483.13$16
May 20250660.553.23$19
Apr 20250962.363.54$32
Mar 202501167.704.27$47
Feb 20250970.884.34$39
Jan 202501174.324.28$47
Dec 202401568.993.12$47
Nov 202401569.052.20$33
Oct 202401571.372.28$34
Sep 202401369.612.36$31
Aug 202401475.632.06$29
Jul 202401679.932.15$34
Jun 202401578.082.63$40
May 202401778.812.20$37
Apr 202401584.451.66$25
Mar 202402080.301.55$31
Feb 202402276.091.78$39
Jan 202402073.023.30$66
Dec 202302071.262.61$52
Nov 202302477.892.81$67
Oct 202302185.443.09$65
Sep 202301289.042.74$33
Aug 202301880.522.67$48
Jul 202301474.852.64$37
Jun 202301768.962.26$38
May 202301970.622.23$42
Apr 202301978.122.24$43
Mar 202301772.852.39$41
Feb 202301275.112.47$30
Jan 202301676.533.39$54
Dec 202203376.415.73$189
Nov 202203885.005.65$215
Oct 202204087.185.86$235
Sep 202204284.888.16$343
Aug 202204794.529.13$429
Jul 2022045101.587.54$339
Jun 2022043115.097.98$343
May 2022048109.378.43$405
Apr 2022049104.226.84$335
Mar 2022046108.885.08$234
Feb 202205191.054.86$248
Jan 202205781.844.54$259
Dec 202106371.323.90$246
Nov 202105377.435.24$278
Oct 202105779.795.71$326
Sep 202105669.865.35$300
Aug 202106266.024.22$262
Jul 202105370.783.98$211
Jun 202105069.493.38$169
May 202105863.483.02$175
Apr 202116560.362.76$240
Mar 202107161.302.72$193
Feb 202104457.805.55$244
Jan 202106550.412.81$183
Dec 202005544.642.68$147
Nov 202006138.772.71$165
Oct 20200636.972.48$15
Sep 20200037.091.99$0
Aug 202001439.982.39$33
Jul 20200038.371.83$0
Jun 202003634.901.69$61
May 202002916.921.81$53
Apr 202001914.751.80$34
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200857.252.09$17
Dec 20190059.012.30$0
Nov 201901655.302.75$44
Oct 201904853.472.42$116
Sep 201905755.052.66$151
Aug 201905453.112.30$124
Jul 201901956.272.46$47
Jun 201902452.782.49$60
May 201903058.482.74$82
Apr 201903462.632.75$94
Mar 201903456.803.06$104
Feb 201901650.852.79$45
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180259.543.11$6
Aug 201805659.403.07$172
Jul 201806065.142.93$176
Jun 201806860.183.08$209
May 201807065.382.90$203
Apr 201806663.842.90$191
Mar 201805461.222.79$150
Feb 201804361.782.77$119
Jan 201804562.874.01$180
Dec 2017201557.272.92$1,189
Nov 20170855.423.12$25
Oct 201701749.292.98$51
Sep 201701747.523.09$52
Aug 201702145.373.00$63
Jul 201701843.873.09$56
Jun 201702042.493.09$62
May 201702345.373.26$75
Apr 201703647.933.21$116
Mar 201703246.772.98$95
Feb 201702950.452.95$86
Jan 201703749.413.42$127
Dec 201601848.763.72$67
Nov 201601642.492.64$42
Oct 201601846.193.09$56
Sep 201601741.553.10$53
Aug 201601541.442.92$44
Jul 201603741.622.92$108
Jun 201604645.352.69$124
May 201605342.521.99$106
Apr 201604836.561.99$96
Mar 201606933.011.79$124
Feb 201604226.472.06$87
Jan 201603427.352.36$80
Dec 201504132.362.00$82
Nov 201503038.792.17$65
Oct 201505343.552.43$129
Sep 201506542.992.76$179
Aug 201507440.162.87$213
Jul 201507848.152.95$230
Jun 2015010256.152.88$294
May 20152110555.212.96$1,470
Apr 2015012049.822.71$325
Mar 2015010042.892.93$293
Feb 201509644.662.98$286
Jan 2015010743.433.10$332
Dec 201403954.693.59$140
Nov 201403470.464.25$145
Oct 201403078.303.90$117
Sep 201402586.164.05$101
Aug 201408189.394.04$327
Jul 201409396.564.18$389
Jun 2014146298.164.74$1,668
May 201405694.734.73$265
Apr 201404195.944.81$197
Mar 201405695.895.06$283
Feb 201405097.406.19$310
Jan 201406090.404.86$292
Dec 2013011791.824.35$509
Nov 2013912088.853.74$1,248
Oct 2013013097.423.78$491
Sep 2013096104.113.72$357
Aug 2013078104.253.52$275
Jul 2013091102.523.72$338
Jun 20131612394.403.93$1,994
May 2013011194.834.15$461
Apr 2013011893.964.28$505
Mar 2013013293.623.91$517
Feb 201309791.233.42$332
Jan 2013010991.603.42$373
Dec 2012114286.773.42$1,098
Nov 20120086.953.62$0
Oct 201208989.383.40$303
Sep 2012010594.672.92$306
Aug 2012011392.662.91$329
Jul 2012015985.133.02$480
Jun 2012014379.822.52$360
May 2012015991.612.49$396
Apr 2012691101.652.00$792
Mar 2012062105.052.22$138
Feb 2012030101.102.57$77
Jan 201201298.092.73$33
Dec 201101396.873.24$42
Nov 201101695.723.31$53
Oct 201101384.983.65$47
Sep 20110483.623.99$16
Aug 20110983.404.15$37
Jul 201102094.144.52$90
Jun 201102192.904.64$97
May 201102498.134.40$106
Apr 2011018105.964.33$78
Mar 201101696.364.06$65
Feb 201101585.644.18$63
Jan 201101086.504.59$46
Dec 201001085.734.35$43
Nov 20100880.843.80$30
Oct 20100578.103.51$18
Sep 20100972.633.98$36
Aug 20100873.684.42$35
Jul 20100972.554.74$43
Jun 201002070.364.91$98
May 201006671.124.24$280
Apr 201003781.694.12$153
Mar 201003578.394.39$154
Feb 201003173.585.44$169
Jan 201003074.365.96$179
Dec 200902371.445.48$126
Nov 200902374.593.75$86
Oct 200907972.544.11$325
Sep 200907765.543.06$236
Aug 200901667.423.22$52
Jul 200901061.133.46$35
Jun 200901966.163.90$74
May 200901054.743.93$39
Apr 200901746.773.59$61
Mar 20090442.144.06$16
Feb 20090332.814.63$14
Jan 200904935.865.37$263
Dec 200804537.105.98$269
Nov 2008011455.496.86$782
Oct 2008013575.246.92$934
Sep 20080119101.767.88$937
Aug 20080158114.228.48$1,340
Jul 20080145131.0811.39$1,651
Jun 20080114131.3313.03$1,486
May 20080230123.1711.57$2,662
Apr 20080171110.3110.45$1,788
Mar 20080199101.909.66$1,923
Feb 200803992.538.77$342
Jan 200804390.388.21$353
Dec 2007013988.337.30$1,015
Nov 2007013291.677.29$963
Oct 2007013082.856.92$900
Sep 2007012175.846.24$756
Aug 2007012369.066.39$786
Jul 2007017570.906.39$1,118
Jun 2007018262.007.55$1,374
May 2007017958.747.85$1,404
Apr 2007018859.617.81$1,467
Mar 2007019356.927.30$1,409
Feb 2007011555.108.22$945
Jan 2007020350.306.73$1,366
Dec 2006017156.656.92$1,183
Nov 2006018454.207.62$1,402
Oct 2006019054.906.01$1,143
Sep 2006017460.085.04$876
Aug 2006014168.717.34$1,035
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 200606966.016.42$443
Apr 2006011264.397.36$824
Mar 2006011856.707.08$836
Feb 2006012757.597.75$984
Jan 2006013260.598.93$1,179
Dec 2005015154.9413.42$2,026
Nov 2005015954.6910.59$1,684
Oct 2005019158.3413.80$2,635
Sep 2005017861.4512.08$2,150
Aug 2005019961.519.80$1,950
Jul 2005023455.697.84$1,835
Jun 2005021752.337.38$1,602
May 2005025545.226.65$1,696
Apr 2005017449.207.36$1,281
Mar 2005517450.377.15$1,497
Feb 20051222445.226.31$1,957
Jan 2005419143.166.32$1,380
Dec 2004020339.866.75$1,370
Nov 2004016045.286.33$1,013
Oct 2004623749.706.52$1,842
Sep 2004020643.245.28$1,088
Aug 2004020642.375.55$1,143
Jul 2004820538.286.08$1,554
Jun 2004019236.106.43$1,235
May 20041122337.486.49$1,861
Apr 2004024834.475.86$1,453
Mar 20041123934.365.53$1,700
Feb 2004025232.455.51$1,388
Jan 2004922232.036.30$1,687
Dec 2003019130.266.30$1,204
Nov 2003723128.804.60$1,263
Oct 20030028.174.76$0
Sep 2003624426.314.75$1,317
Aug 2003023129.765.13$1,185
Jul 2003524429.415.17$1,409
Jun 2003022728.565.98$1,358
May 2003021726.595.97$1,296
Apr 2003021326.675.41$1,152
Mar 2003430231.146.10$1,966
Feb 2003027733.487.93$2,195
Jan 2003430130.315.58$1,801
Dec 2002424326.914.85$1,287
Nov 2002423424.664.14$1,067
Oct 2002030926.464.23$1,307
Sep 2002430927.443.64$1,233
Aug 2002032825.963.16$1,038
Jul 2002431524.583.06$1,063
Jun 2002030823.733.34$1,028
May 2002430124.663.58$1,177
Apr 2002025023.653.51$878
Mar 2002425622.003.10$882
Feb 2002623518.222.38$668
Jan 2002829117.172.38$829
Dec 2001845516.932.36$1,211
Nov 2001024218.072.41$582
Oct 2001329019.782.53$793
Sep 2001635824.262.25$952
Aug 2001948824.873.05$1,714
Jul 2001022123.933.20$707
Jun 20011825824.563.82$1,429
May 2001423725.524.31$1,123
Apr 2001334624.685.34$1,920
Mar 2001534224.545.38$1,961
Feb 2001026227.755.77$1,511
Jan 20011516327.478.40$1,781
Dec 20001013926.889.12$1,537
Nov 2000919432.215.66$1,388
Oct 2000932831.235.15$1,969
Sep 2000042331.875.19$2,194
Aug 20001149229.644.54$2,560
Jul 20001044628.534.09$2,109
Jun 2000944929.304.40$2,238
May 2000048627.263.68$1,788
Apr 20001152524.513.12$1,906
Mar 20002265728.422.86$2,504
Feb 20001451327.622.73$1,785
Jan 20001473925.272.48$2,187
Dec 19991069924.282.42$1,937
Nov 1999948123.192.43$1,379
Oct 19991548620.982.80$1,677
Sep 19991769621.752.62$2,192
Aug 19991363419.262.88$2,074
Jul 19991056117.892.37$1,510
Jun 19991457215.942.36$1,574
May 19991157215.792.32$1,501
Apr 19991047715.102.21$1,204
Mar 19991735912.471.84$872
Feb 1999124149.981.82$872
Jan 1999936210.381.90$781
Dec 199895119.201.77$989
Nov 1998454610.892.19$1,237
Oct 19982739312.421.97$1,109
Sep 19983048312.592.08$1,384
Aug 1998143111.301.91$833
Jul 19983051611.742.24$1,507
Jun 1998949811.242.24$1,215
May 19981546012.622.21$1,204
Apr 1998746313.042.51$1,251
Mar 19983338812.802.31$1,318
Feb 19982753013.952.30$1,595
Jan 19982177714.702.15$1,983
Dec 19971049616.322.41$1,359
Nov 19973643018.193.09$1,983
Oct 19972663119.253.15$2,488
Sep 19971437017.742.95$1,342
Aug 1997652517.862.55$1,448
Jul 1997257217.582.25$1,320
Jun 19973885517.242.26$2,585
May 1997121,39918.972.31$3,457
Apr 19971066517.882.08$1,564
Mar 19972029618.951.94$953
Feb 19972648220.492.21$1,596
Jan 19973564123.483.54$3,091
Dec 19961346923.32$303
Nov 1996841121.97$176
Oct 19963755723.31$862
Sep 19961452022.22$311
Aug 1996391,02520.26$790
Jul 199631,05919.55$59
Jun 199651,28618.73$94
May 199691,39819.43$175
Apr 1996161,20421.51$344
Mar 1996171,42019.38$329
Feb 1996231,05516.98$391
Jan 1996421,65017.07$717
Dec 19952467617.19$413
Nov 19952347816.00$368
Oct 19952876315.43$432
Sep 1995191,27616.18$307
Aug 1995411,44715.92$653
Jul 1995511,17515.24$777
Jun 19951397816.41$213
May 1995111,66917.56$193
Apr 1995131,57017.73$230
Mar 1995181,11516.44$296
Feb 1995988416.58$149
Jan 1995121,10315.92$191
Dec 1994171,52315.03$256
Nov 1994371,71815.90$588
Oct 1994472,14015.58$732
Sep 1994262,23615.29$398
Aug 1994402,86616.13$645
Jul 1994512,85417.56$896
Jun 1994261,20017.09$444
May 1994271,43915.88$429
Apr 1994262,51414.14$368
Mar 1994672,57812.46$835
Feb 1994962,16612.50$1,200
Jan 19941003,23012.66$1,266
Dec 19931304,27912.33$1,603
Nov 1993302,95614.49$435
Oct 19931542,57315.85$2,441
Sep 19931762,32415.03$2,645
Aug 1993642,20515.66$1,002
Jul 19931165,03315.46$1,793
Jun 1993935,60216.79$1,561
May 1993232,84617.68$407
Apr 199332,56018.05$54
Mar 1993403,55918.14$726
Feb 1993273,11817.90$483
Jan 1993372,93316.93$626

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                    7 Mcf  × $  2.87 =        $20

────────────────────────────────────────────────────
Month total                                      $20

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/139504 is the state's own key, not one this site invented.