UNIVERSITY 28-10

Operated by BIG D ENERGY COMPANY (P-5 69344) in the EMBAR (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 151564District 08Field 28843777GasSaveExport
Value, all time
$69 k
Jun 1994 – Apr 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
167
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 70 leases and 70 wells, and the rule below applies to all of them.

Discovered
1962-02-28
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 05/01/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction51,379 Mcf$68,851
Total$68,851

23,829 Mcf of this lease's gas, across 9 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1385, -102.6947. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.13848, -102.69469 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,150 ft
1 wells filed one
Completion to plug
13.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,150 ft.

Completions filed
Jun 1994
1 of 1 wells
Plug dates filed
Apr 2008
1 of 1 wells

Last completion to plug: a median of 13.8 years across the 1 well that filed both dates, with the middle half between 13.8 years and 13.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0033750533,150 ftJun 1994Apr 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (167)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

167 months

Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004132.036.30$6
Dec 2003130.266.30$6
Nov 2003128.804.60$5
Oct 2003428.174.76$19
Sep 2003126.314.75$5
Aug 20031029.765.13$51
Jul 2003129.415.17$5
Jun 2003028.565.98$0
May 2003226.595.97$12
Apr 20034626.675.41$249
Mar 2003431.146.10$24
Feb 2003133.487.93$8
Jan 2003730.315.58$39
Dec 20024126.914.85$199
Nov 20023024.664.14$124
Oct 20023426.464.23$144
Sep 20023627.443.64$131
Aug 2002325.963.16$9
Jul 20021424.583.06$43
Jun 20021123.733.34$37
May 2002124.663.58$4
Apr 2002923.653.51$32
Mar 2002222.003.10$6
Feb 20021818.222.38$43
Jan 20021317.172.38$31
Dec 20011616.932.36$38
Nov 20012018.072.41$48
Oct 20012519.782.53$63
Sep 20017224.262.25$162
Aug 20014124.873.05$125
Jul 20014223.933.20$134
Jun 20013524.563.82$134
May 20012225.524.31$95
Apr 20013824.685.34$203
Mar 20016124.545.38$328
Feb 2001027.755.77$0
Jan 20012627.478.40$218
Dec 20003126.889.12$283
Nov 20005832.215.66$328
Oct 20004931.235.15$252
Sep 20003431.875.19$176
Aug 20008329.644.54$377
Jul 20009128.534.09$372
Jun 20008429.304.40$369
May 20008627.263.68$316
Apr 20009424.513.12$293
Mar 200011228.422.86$320
Feb 20002027.622.73$55
Jan 2000025.272.48$0
Dec 1999024.282.42$0
Nov 1999023.192.43$0
Oct 1999620.982.80$17
Sep 1999021.752.62$0
Aug 19994419.262.88$127
Jul 19996217.892.37$147
Jun 19995215.942.36$123
May 19998615.792.32$200
Apr 199915215.102.21$336
Mar 199944712.471.84$822
Feb 19992919.981.82$529
Jan 199928010.381.90$532
Dec 19986289.201.77$1,114
Nov 199840010.892.19$874
Oct 199849112.421.97$967
Sep 199853712.592.08$1,118
Aug 199859611.301.91$1,137
Jul 199843611.742.24$975
Jun 199815711.242.24$351
May 199823112.622.21$510
Apr 199826913.042.51$674
Mar 199838712.802.31$894
Feb 199836113.952.30$830
Jan 199861714.702.15$1,330
Dec 199798116.322.41$2,365
Nov 199789718.193.09$2,770
Oct 199791019.253.15$2,866
Sep 199799917.742.95$2,952
Aug 199798217.862.55$2,509
Jul 19971,26317.582.25$2,838
Jun 19971,60417.242.26$3,621
May 19971,79118.972.31$4,135
Apr 19971,80317.882.08$3,755
Mar 19972,47418.951.94$4,797
Feb 19973,08520.492.21$6,805
Jan 19972,80023.483.54$9,911
Dec 19962,27023.32$0
Nov 19963,03021.97$0
Oct 19963,00023.31$0
Sep 19963,82622.22$0
Aug 19965,03720.26$0
Jul 19963,02319.55$0
Jun 1996018.73$0
May 1996019.43$0
Apr 1996021.51$0
Mar 1996019.38$0
Feb 1996016.98$0
Jan 1996017.07$0
Dec 1995017.19$0
Nov 1995016.00$0
Oct 1995015.43$0
Sep 1995016.18$0
Aug 1995015.92$0
Jul 1995015.24$0
Jun 1995016.41$0
May 1995017.56$0
Apr 1995017.73$0
Mar 1995016.44$0
Feb 1995016.58$0
Jan 1995015.92$0
Dec 1994015.03$0
Nov 199421315.90$0
Oct 1994015.58$0
Sep 19943,33015.29$0
Aug 1994016.13$0
Jul 199410017.56$0
Jun 1994017.09$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2004 — as filed, then multipliedworked
Gas                    1 Mcf  × $  6.30 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/151564 is the state's own key, not one this site invented.