TERRY, I. W. "A"

Operated by ANADARKO E&P COMPANY LP (P-5 20542) in the CONGER, SW (PENN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153130District 08Field 20101500CondensateGasSaveExport
Value, all time
$51 k
Dec 1994 – Dec 2002
Value, last 12 filed months
$12 k
at the published price for each month
Months reported
97
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 271 leases and 445 wells, and the rule below applies to all of them.

Discovered
1979-02-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-07-01.

The Commission's schedule remark for this field reads: OPERATOR REQUEST. TEXACO E & P INC ALLICIANT..

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,264 bbl$26,508
GasProduction14,541 Mcf$24,849
Total$51,357

6,028 Mcf of this lease's gas, across 25 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6694, -101.2788. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.66939, -101.27879 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,600 ft.

Completions filed
Feb 1981
1 of 1 wells

1 well

42-1733108778,600 ftFeb 1981Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (97)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

97 months

Dec 200284026.914.85$2,260
Nov 2002012924.664.14$534
Oct 2002012526.464.23$529
Sep 2002016727.443.64$607
Aug 2002017325.963.16$547
Jul 20026518224.583.06$2,155
Jun 2002015223.733.34$507
May 2002017824.663.58$638
Apr 20025816723.653.51$1,958
Mar 20025216922.003.10$1,668
Feb 2002013518.222.38$321
Jan 2002016817.172.38$399
Dec 200115517216.932.36$3,031
Nov 200107218.072.41$173
Oct 2001010619.782.53$268
Sep 200106924.262.25$155
Aug 200106724.873.05$205
Jul 200109723.933.20$310
Jun 20012179724.563.82$5,700
May 200108025.524.31$345
Apr 2001011024.685.34$587
Mar 2001269824.545.38$1,165
Feb 200107527.755.77$433
Jan 200105627.478.40$470
Dec 200005926.889.12$538
Nov 200006332.215.66$356
Oct 200005231.235.15$268
Sep 200004931.875.19$254
Aug 2000865529.644.54$2,799
Jul 200007828.534.09$319
Jun 200007029.304.40$308
May 200007327.263.68$269
Apr 200008124.513.12$252
Mar 200005928.422.86$169
Feb 200007127.622.73$194
Jan 200006725.272.48$166
Dec 199905624.282.42$136
Nov 1999645523.192.43$1,618
Oct 199905420.982.80$151
Sep 199905921.752.62$155
Aug 199907419.262.88$213
Jul 199908717.892.37$206
Jun 1999577215.942.36$1,079
May 199908015.792.32$186
Apr 199909315.102.21$205
Mar 1999010312.471.84$189
Feb 19990859.981.82$155
Jan 1999019210.381.90$365
Dec 1998451409.201.77$662
Nov 19983012510.892.19$600
Oct 199809712.421.97$191
Sep 1998011712.592.08$244
Aug 199806711.301.91$128
Jul 199807711.742.24$172
Jun 1998015311.242.24$342
May 199809012.622.21$199
Apr 1998015713.042.51$393
Mar 19982814412.802.31$691
Feb 199808113.952.30$186
Jan 1998011314.702.15$243
Dec 1997015616.322.41$376
Nov 1997011518.193.09$355
Oct 19975220919.253.15$1,659
Sep 1997020317.742.95$600
Aug 1997014617.862.55$373
Jul 1997018017.582.25$404
Jun 1997025517.242.26$576
May 1997022718.972.31$524
Apr 19976616517.882.08$1,524
Mar 19976117418.951.94$1,493
Feb 1997052820.492.21$1,165
Jan 1997016323.483.54$577
Dec 1996011623.32$0
Nov 1996029021.97$0
Oct 1996088223.31$0
Sep 1996043522.22$0
Aug 1996065820.26$0
Jul 199601119.55$0
Jun 1996056018.73$0
May 19968343819.43$1,613
Apr 1996044821.51$0
Mar 1996028519.38$0
Feb 1996013816.98$0
Jan 1996010717.07$0
Dec 199506517.19$0
Nov 1995058316.00$0
Oct 199506315.43$0
Sep 199505916.18$0
Aug 19952912615.92$462
Jul 199501215.24$0
Jun 199507016.41$0
May 199507517.56$0
Apr 1995018317.73$0
Mar 199509716.44$0
Feb 1995016416.58$0
Jan 199509315.92$0
Dec 199467015.03$90

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2002 — as filed, then multipliedworked
Condensate            84 bbl  × $ 26.91 =     $2,260
Gas                    0 Mcf  × $  4.85 =         $0

────────────────────────────────────────────────────
Month total                                   $2,260

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/153130 is the state's own key, not one this site invented.