UNIVERSITY CQ

Operated by CIMAREX ENERGY CO. OF COLORADO (P-5 153429) in the EMMA (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 155891District 08Field 28899913CondensateGasSaveExport
Value, all time
$424 k
May 1995 – Mar 2010
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
179
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1956-09-14
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 8-1-81 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,044 bbl$101,332
GasProduction108,664 Mcf$322,471
Total$423,803

31,898 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1302, -102.6077. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.13021, -102.60766 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
12,355 ft
1 wells filed one
Completion to plug
14.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,355 ft.

Completions filed
May 1995
1 of 1 wells
Plug dates filed
Mar 2010
1 of 1 wells

Last completion to plug: a median of 14.8 years across the 1 well that filed both dates, with the middle half between 14.8 years and 14.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-00304257612,355 ftMay 1995Mar 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (179)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

179 months

Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 200955074.593.75$4,102
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080537.105.98$30
Nov 2008017355.496.86$1,187
Oct 200802875.246.92$194
Sep 200807101.767.88$55
Aug 200800114.228.48$0
Jul 200802131.0811.39$23
Jun 2008037131.3313.03$482
May 200857500123.1711.57$12,808
Apr 20080501110.3110.45$5,238
Mar 200856153101.909.66$7,185
Feb 2008596792.538.77$6,047
Jan 2008012690.388.21$1,034
Dec 200712823488.337.30$13,015
Nov 2007028491.677.29$2,071
Oct 200714537082.856.92$14,574
Sep 2007024075.846.24$1,499
Aug 2007016269.066.39$1,035
Jul 20071073470.906.39$7,803
Jun 2007015862.007.55$1,193
May 200714927358.747.85$10,894
Apr 200711229559.617.81$8,979
Mar 2007045456.927.30$3,315
Feb 2007044555.108.22$3,656
Jan 20079012350.306.73$5,354
Dec 200601556.656.92$104
Nov 20060054.207.62$0
Oct 200602954.906.01$174
Sep 2006019560.085.04$982
Aug 2006046168.717.34$3,384
Jul 2006039869.376.34$2,524
Jun 2006026766.286.38$1,705
May 2006048166.016.42$3,090
Apr 2006023964.397.36$1,759
Mar 2006059356.707.08$4,200
Feb 2006054057.597.75$4,186
Jan 2006052360.598.93$4,672
Dec 2005057854.9413.42$7,754
Nov 2005054154.6910.59$5,728
Oct 2005041058.3413.80$5,656
Sep 2005031161.4512.08$3,757
Aug 2005051561.519.80$5,045
Jul 2005053155.697.84$4,165
Jun 2005033952.337.38$2,502
May 2005074045.226.65$4,922
Apr 2005053349.207.36$3,923
Mar 2005093150.377.15$6,661
Feb 2005028145.226.31$1,774
Jan 200509443.166.32$594
Dec 200405739.866.75$385
Nov 200403345.286.33$209
Oct 200403249.706.52$208
Sep 200404143.245.28$217
Aug 200406142.375.55$339
Jul 2004010338.286.08$627
Jun 2004024136.106.43$1,550
May 2004030437.486.49$1,974
Apr 2004027834.475.86$1,629
Mar 2004022934.365.53$1,266
Feb 2004018532.455.51$1,019
Jan 2004029632.036.30$1,865
Dec 2003028130.266.30$1,771
Nov 2003023728.804.60$1,089
Oct 2003020628.174.76$980
Sep 2003024826.314.75$1,178
Aug 2003033229.765.13$1,703
Jul 2003023829.415.17$1,231
Jun 2003048428.565.98$2,896
May 2003028626.595.97$1,708
Apr 2003055126.675.41$2,979
Mar 2003058331.146.10$3,554
Feb 2003062633.487.93$4,962
Jan 2003039030.315.58$2,177
Dec 2002041726.914.85$2,024
Nov 2002047224.664.14$1,953
Oct 2002070026.464.23$2,960
Sep 2002071027.443.64$2,581
Aug 2002081125.963.16$2,566
Jul 2002062324.583.06$1,907
Jun 2002094023.733.34$3,138
May 2002091924.663.58$3,294
Apr 2002085323.653.51$2,996
Mar 2002093222.003.10$2,892
Feb 2002086718.222.38$2,060
Jan 200201,00817.172.38$2,395
Dec 200101,03516.932.36$2,447
Nov 2001196318.072.41$2,335
Oct 200101,02419.782.53$2,590
Sep 200121,02924.262.25$2,365
Aug 2001278224.873.05$2,437
Jul 2001049023.933.20$1,567
Jun 2001662124.563.82$2,522
May 2001101,34525.524.31$6,049
Apr 200101,47924.685.34$7,891
Mar 20012287424.545.38$5,239
Feb 20014092827.755.77$6,462
Jan 20016342627.478.40$5,308
Dec 2000018926.889.12$1,724
Nov 20005417032.215.66$2,701
Oct 20005620931.235.15$2,824
Sep 20005646531.875.19$4,196
Aug 20006054029.644.54$4,230
Jul 20006552628.534.09$4,006
Jun 2000056229.304.40$2,471
May 20007362127.263.68$4,275
Apr 20007215324.513.12$2,241
Mar 20007317728.422.86$2,581
Feb 20007017527.622.73$2,411
Jan 2000060125.272.48$1,491
Dec 19991405524.282.42$3,533
Nov 1999050123.192.43$1,219
Oct 19995945620.982.80$2,516
Sep 19995532121.752.62$2,037
Aug 1999054719.262.88$1,573
Jul 19993273417.892.37$2,314
Jun 1999052515.942.36$1,240
May 1999074115.792.32$1,720
Apr 1999062915.102.21$1,389
Mar 1999074612.471.84$1,371
Feb 199906719.981.82$1,220
Jan 1999058510.381.90$1,111
Dec 199807489.201.77$1,326
Nov 1998064210.892.19$1,403
Oct 1998079512.421.97$1,566
Sep 1998084012.592.08$1,749
Aug 1998087011.301.91$1,659
Jul 1998095611.742.24$2,139
Jun 199801,00011.242.24$2,237
May 1998074112.622.21$1,635
Apr 199801,00213.042.51$2,510
Mar 199801,19112.802.31$2,751
Feb 1998092513.952.30$2,127
Jan 199801,18714.702.15$2,558
Dec 199701,28316.322.41$3,093
Nov 199701,34018.193.09$4,138
Oct 199701,61619.253.15$5,090
Sep 1997024617.742.95$727
Aug 199701,05417.862.55$2,693
Jul 199701,39517.582.25$3,134
Jun 199701,39017.242.26$3,138
May 199701,43918.972.31$3,322
Apr 199701,37417.882.08$2,862
Mar 199701,07718.951.94$2,088
Feb 1997093520.492.21$2,063
Jan 199701,03523.483.54$3,664
Dec 199601,15123.32$0
Nov 199601,25521.97$0
Oct 1996075523.31$0
Sep 199601,65122.22$0
Aug 199601,39320.26$0
Jul 199601,39419.55$0
Jun 199601,05218.73$0
May 199601,68119.43$0
Apr 199601,54021.51$0
Mar 199601,26719.38$0
Feb 199601,57616.98$0
Jan 199601,82917.07$0
Dec 199501,91017.19$0
Nov 199501,96016.00$0
Oct 199502,13515.43$0
Sep 199501,99816.18$0
Aug 199502,18315.92$0
Jul 1995371,87815.24$564
Jun 1995201,87416.41$328
May 1995181,41617.56$316

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2009 — as filed, then multipliedworked
Condensate            55 bbl  × $ 74.59 =     $4,102
Gas                    0 Mcf  × $  3.75 =         $0

────────────────────────────────────────────────────
Month total                                   $4,102

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/155891 is the state's own key, not one this site invented.