UNIVERSITY 10-18 "B"

Operated by TEXACO E & P INC. (P-5 844118) in the BLOCK 18 (CHERRY CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 157394District 08Field 09302400CondensateGasSaveExport
Value, all time
$584 k
Feb 1996 – Jan 2001
Value, last 12 filed months
$122 k
at the published price for each month
Months reported
60
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 15 leases and 23 wells, and the rule below applies to all of them.

Discovered
1985-07-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7,380 bbl$146,749
GasProduction283,688 Mcf$437,451
Total$584,200

113,819 Mcf of this lease's gas, across 11 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6292, -103.2661. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.62925, -103.26615 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,850 ft.

Completions filed
Oct 1995
1 of 1 wells

1 well

42-4753370366,850 ftOct 1995Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (60)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

60 months

Jan 20019958627.478.40$7,641
Dec 20001621,17226.889.12$15,046
Nov 200012790032.215.66$9,183
Oct 20001661,42131.235.15$12,496
Sep 20001191,12331.875.19$9,617
Aug 20001391,45429.644.54$10,722
Jul 20001211,50828.534.09$9,619
Jun 2000901,51229.304.40$9,286
May 2000902,12427.263.68$10,269
Apr 20001252,32124.513.12$10,296
Mar 2000951,94728.422.86$8,268
Feb 20001272,14627.622.73$9,359
Jan 20001591,89225.272.48$8,711
Dec 19992591,94324.282.42$10,998
Nov 19995785023.192.43$3,391
Oct 1999691,83420.982.80$6,590
Sep 19991012,04521.752.62$7,552
Aug 19991172,82119.262.88$10,365
Jul 1999792,99817.892.37$8,526
Jun 1999923,51315.942.36$9,765
May 19991084,69815.792.32$12,609
Apr 1999773,08815.102.21$7,981
Mar 1999973,79312.471.84$8,182
Feb 1999883,6819.981.82$7,570
Jan 19991164,17010.381.90$9,127
Dec 19981154,2559.201.77$8,603
Nov 1998794,67210.892.19$11,072
Oct 19981055,23712.421.97$11,617
Sep 19981273,52312.592.08$8,936
Aug 19981345,07011.301.91$11,184
Jul 1998943,93811.742.24$9,914
Jun 1998913,15111.242.24$8,072
May 1998894,04212.622.21$10,041
Apr 19981174,46013.042.51$12,699
Mar 19981493,14512.802.31$9,170
Feb 19981863,05113.952.30$9,609
Jan 19981412,76414.702.15$8,029
Dec 19972812,71116.322.41$11,122
Nov 19971354,49918.193.09$16,350
Oct 19971136,22819.253.15$21,792
Sep 199708,55517.742.95$25,279
Aug 19972113,37817.862.55$34,552
Jul 199722511,72717.582.25$30,305
Jun 19978011,49017.242.26$27,314
May 1997913,39818.972.31$9,571
Apr 19972221,43817.882.08$6,964
Mar 19975481,86518.951.94$14,001
Feb 199712253620.492.21$3,682
Jan 19971831,19623.483.54$8,530
Dec 19961221,53923.32$2,845
Nov 19961881,72021.97$4,130
Oct 19961584,60223.31$3,683
Sep 19961126,76522.22$2,489
Aug 1996281,47720.26$567
Jul 19961913,71119.55$371
Jun 19969418,35318.73$1,761
May 19967219,35419.43$1,399
Apr 199615719,82921.51$3,377
Mar 199610320,34019.38$1,996
Feb 199606,12916.98$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2001 — as filed, then multipliedworked
Condensate            99 bbl  × $ 27.47 =     $2,720
Gas                  586 Mcf  × $  8.40 =     $4,922

────────────────────────────────────────────────────
Month total                                   $7,641

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/157394 is the state's own key, not one this site invented.