FOREST

Operated by YUCCA ENERGY, INC. (P-5 950335) in the GOLDSMITH, EAST (GRAYBURG) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 173006District 08Field 35653444Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$2.5 M
Apr 1999 – Oct 2016
Value, last 12 filed months
$390
at the published price for each month
Months reported
211
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 46 leases and 46 wells, and the rule below applies to all of them.

Discovered
not filed
Field class
Oil and gas
the register's own label
Between wells
1,800 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1964-12-16.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$66
GasProduction537,010 Mcf$2,491,959
Total$2,492,025

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9799, -102.5718. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.97989, -102.57182 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,165 ft
1 wells filed one
Completion to plug
17.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,165 ft.

Completions filed
May 1999
1 of 1 wells
Plug dates filed
Oct 2016
1 of 1 wells

Last completion to plug: a median of 17.4 years across the 1 well that filed both dates, with the middle half between 17.4 years and 17.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1353774114,165 ftMay 1999Oct 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (211)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

211 months

Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 201609345.352.69$250
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201602326.472.06$47
Jan 201601327.352.36$31
Dec 201503132.362.00$62
Nov 20150038.792.17$0
Oct 201504543.552.43$109
Sep 201507142.992.76$196
Aug 20150040.162.87$0
Jul 20150648.152.95$18
Jun 201508856.152.88$254
May 201501555.212.96$44
Apr 20150449.822.71$11
Mar 20150142.892.93$3
Feb 20150244.662.98$6
Jan 20150243.433.10$6
Dec 2014022654.693.59$812
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 2014013586.164.05$546
Aug 201402289.394.04$89
Jul 20140996.564.18$38
Jun 2014010198.164.74$478
May 2014022694.734.73$1,068
Apr 2014020295.944.81$971
Mar 2014052895.895.06$2,670
Feb 2014081397.406.19$5,034
Jan 2014099190.404.86$4,817
Dec 2013076391.824.35$3,322
Nov 2013099988.853.74$3,735
Oct 2013084497.423.78$3,190
Sep 20130669104.113.72$2,487
Aug 20130743104.253.52$2,617
Jul 20130885102.523.72$3,290
Jun 2013085094.403.93$3,343
May 2013091894.834.15$3,809
Apr 2013082293.964.28$3,520
Mar 2013068293.623.91$2,669
Feb 2013063191.233.42$2,158
Jan 2013021591.603.42$735
Dec 2012051486.773.42$1,758
Nov 2012072086.953.62$2,610
Oct 2012070789.383.40$2,404
Sep 2012073194.672.92$2,133
Aug 2012059192.662.91$1,719
Jul 2012077685.133.02$2,344
Jun 2012057979.822.52$1,459
May 2012044791.612.49$1,112
Apr 20120789101.652.00$1,575
Mar 20120644105.052.22$1,431
Feb 20120527101.102.57$1,355
Jan 2012066298.092.73$1,810
Dec 2011063296.873.24$2,048
Nov 2011050495.723.31$1,669
Oct 2011055384.983.65$2,018
Sep 2011070483.623.99$2,806
Aug 2011069483.404.15$2,880
Jul 2011050494.144.52$2,277
Jun 2011081092.904.64$3,758
May 2011086598.134.40$3,810
Apr 2011076105.964.33$329
Mar 2011081696.364.06$3,311
Feb 2011082585.644.18$3,448
Jan 201101,14186.504.59$5,236
Dec 201001,15385.734.35$5,013
Nov 201001,14180.843.80$4,330
Oct 201001,03678.103.51$3,635
Sep 201001,05872.633.98$4,210
Aug 201001,04473.684.42$4,614
Jul 201001,04872.554.74$4,964
Jun 201001,02670.364.91$5,038
May 201001,12371.124.24$4,756
Apr 201001,07181.694.12$4,415
Mar 201001,18978.394.39$5,218
Feb 201001,08873.585.44$5,921
Jan 201001,21974.365.96$7,270
Dec 200901,16571.445.48$6,389
Nov 200901,20674.593.75$4,524
Oct 200901,09972.544.11$4,517
Sep 200901,11865.543.06$3,426
Aug 200901,05167.423.22$3,383
Jul 200901,21561.133.46$4,209
Jun 200901,20666.163.90$4,697
May 200901,35054.743.93$5,300
Apr 200901,33946.773.59$4,804
Mar 2009055142.144.06$2,237
Feb 200901,04632.814.63$4,846
Jan 200901,34635.865.37$7,229
Dec 200801,31137.105.98$7,836
Nov 200801,17355.496.86$8,047
Oct 200801,41175.246.92$9,767
Sep 20080786101.767.88$6,191
Aug 200801,081114.228.48$9,170
Jul 200801,436131.0811.39$16,355
Jun 200801,060131.3313.03$13,815
May 200801,414123.1711.57$16,366
Apr 200801,439110.3110.45$15,045
Mar 200801,114101.909.66$10,766
Feb 200801,41792.538.77$12,428
Jan 200801,34990.388.21$11,070
Dec 200701,30288.337.30$9,507
Nov 200701,32791.677.29$9,676
Oct 200701,36482.856.92$9,442
Sep 200701,08075.846.24$6,744
Aug 200701,37369.066.39$8,771
Jul 200701,43270.906.39$9,148
Jun 200701,46662.007.55$11,066
May 200701,46758.747.85$11,510
Apr 200701,28359.617.81$10,014
Mar 200701,55856.927.30$11,376
Feb 200701,46255.108.22$12,012
Jan 200701,58150.306.73$10,635
Dec 200601,66256.656.92$11,498
Nov 200601,04154.207.62$7,930
Oct 200601,54354.906.01$9,279
Sep 2006032860.085.04$1,652
Aug 200601,56468.717.34$11,480
Jul 200601,71069.376.34$10,846
Jun 200611,69566.286.38$10,887
May 200601,75766.016.42$11,289
Apr 200601,67164.397.36$12,299
Mar 200601,71756.707.08$12,161
Feb 200601,50657.597.75$11,673
Jan 2006057060.598.93$5,092
Dec 2005012354.9413.42$1,650
Nov 2005022454.6910.59$2,372
Oct 200501,86058.3413.80$25,660
Sep 200502,33261.4512.08$28,168
Aug 200502,49561.519.80$24,443
Jul 200502,64855.697.84$20,770
Jun 200502,68952.337.38$19,848
May 200503,04345.226.65$20,239
Apr 200503,11349.207.36$22,913
Mar 200503,20750.377.15$22,946
Feb 200502,96445.226.31$18,709
Jan 200503,44043.166.32$21,748
Dec 200403,61639.866.75$24,412
Nov 200403,65345.286.33$23,125
Oct 200403,56649.706.52$23,233
Sep 200403,48443.245.28$18,409
Aug 200403,25642.375.55$18,073
Jul 200403,50238.286.08$21,307
Jun 200403,51336.106.43$22,599
May 200403,28937.486.49$21,361
Apr 200404,05934.475.86$23,779
Mar 200404,26934.365.53$23,608
Feb 200403,66132.455.51$20,171
Jan 200404,04232.036.30$25,463
Dec 200304,05330.266.30$25,541
Nov 200304,19128.804.60$19,258
Oct 200303,84828.174.76$18,315
Sep 200304,26426.314.75$20,251
Aug 200304,58529.765.13$23,520
Jul 200303,87029.415.17$20,011
Jun 200303,89828.565.98$23,322
May 200304,50326.595.97$26,895
Apr 200304,46126.675.41$24,122
Mar 200304,72831.146.10$28,822
Feb 200304,37133.487.93$34,644
Jan 200304,75930.315.58$26,565
Dec 200204,76526.914.85$23,128
Nov 200204,79324.664.14$19,828
Oct 200204,56726.464.23$19,314
Sep 200204,96727.443.64$18,056
Aug 200204,36125.963.16$13,799
Jul 200205,34324.583.06$16,359
Jun 200205,03423.733.34$16,805
May 200204,76924.663.58$17,092
Apr 200205,21923.653.51$18,331
Mar 200205,32022.003.10$16,506
Feb 200204,90318.222.38$11,648
Jan 200205,51617.172.38$13,104
Dec 200105,62616.932.36$13,302
Nov 200105,19118.072.41$12,487
Oct 200105,60819.782.53$14,182
Sep 200105,47524.262.25$12,326
Aug 200104,45624.873.05$13,605
Jul 200105,17423.933.20$16,542
Jun 200105,46324.563.82$20,891
May 200105,13125.524.31$22,101
Apr 200105,21624.685.34$27,829
Mar 200106,19624.545.38$33,312
Feb 200105,61127.755.77$32,359
Jan 200106,66227.478.40$55,953
Dec 200006,79526.889.12$61,987
Nov 200006,96632.215.66$39,414
Oct 200007,38331.235.15$37,989
Sep 200007,37231.875.19$38,235
Aug 200007,94829.644.54$36,090
Jul 200008,26728.534.09$33,810
Jun 200008,08329.304.40$35,543
May 200006,71627.263.68$24,713
Apr 200008,31624.513.12$25,913
Mar 200009,20428.422.86$26,321
Feb 200008,83627.622.73$24,091
Jan 200009,74525.272.48$24,172
Dec 199909,88824.282.42$23,966
Nov 199909,78823.192.43$23,824
Oct 1999010,96720.982.80$30,748
Sep 1999010,20721.752.62$26,731
Aug 1999010,58219.262.88$30,430
Jul 1999011,93317.892.37$28,309
Jun 1999012,27815.942.36$29,002
May 1999012,68415.792.32$29,440
Apr 1999029015.102.21$640

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2016 — as filed, then multipliedworked
Condensate             0 bbl  × $ 45.35 =         $0
Gas                   93 Mcf  × $  2.69 =       $250

────────────────────────────────────────────────────
Month total                                     $250

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/173006 is the state's own key, not one this site invented.