INDUSTRIAL "A"

Operated by ENDEAVOR ENERGY RESOURCES L.P. (P-5 251726) in the MIDLAND, SW. (DEVONIAN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 180362District 08Field 611032002 tax incentive programmesCondensateGasSaveExport
Value, all time
$10.1 M
Sep 2000 – Aug 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
264
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 32 leases and 32 wells, and the rule below applies to all of them.

Discovered
1964-01-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2002-01-08.

The Commission's schedule remark for this field reads: CAPACITY FIELD EFFECTIVE 2/1/03 PER AOF-1 & FOR-2 FORMS

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-06-21147327
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition83,844 bbl$4,412,229
GasProduction1,008,636 Mcf$5,698,493
Total$10,110,722

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9852, -102.1377. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.98524, -102.13772 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,948 ft
1 wells filed one
Completion to plug
21.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,948 ft.

Completions filed
Oct 2000
1 of 1 wells
Plug dates filed
Jul 2022
1 of 1 wells

Last completion to plug: a median of 21.8 years across the 1 well that filed both dates, with the middle half between 21.8 years and 21.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-32934297602H11,948 ftOct 2000Jul 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (264)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

264 months

Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20171057.272.92$57
Nov 2017154655.423.12$975
Oct 2017107449.292.98$714
Sep 20173042847.523.09$2,747
Aug 20172988345.373.00$3,969
Jul 20173174643.873.09$3,663
Jun 20172994742.493.09$4,156
May 2017381,02145.373.26$5,056
Apr 20172447847.933.21$2,685
Mar 20173353046.772.98$3,125
Feb 20173543050.452.95$3,035
Jan 20176894349.413.42$6,584
Dec 2016413848.763.72$2,141
Nov 2016571,27142.492.64$5,783
Oct 20161301,71846.193.09$11,314
Sep 20168627841.553.10$4,435
Aug 20163848741.442.92$2,999
Jul 20163175141.622.92$3,486
Jun 20164263345.352.69$3,605
May 201610551142.521.99$5,482
Apr 201612850436.561.99$5,683
Mar 201614756333.011.79$5,863
Feb 201620354726.472.06$6,502
Jan 201617662227.352.36$6,284
Dec 201518265032.362.00$7,190
Nov 201527464738.792.17$12,031
Oct 20153631,09743.552.43$18,471
Sep 201516733842.992.76$8,112
Aug 20154315440.162.87$2,169
Jul 201510925548.152.95$5,999
Jun 2015359256.152.88$2,230
May 201517471555.212.96$11,720
Apr 201519039849.822.71$10,543
Mar 201514359042.892.93$7,865
Feb 201514855544.662.98$8,261
Jan 201524458043.433.10$12,395
Dec 201411663054.693.59$8,607
Nov 201435969370.464.25$28,242
Oct 201451684678.303.90$43,703
Sep 201436172686.164.05$34,041
Aug 20148321,56089.394.04$80,667
Jul 201450049296.564.18$50,336
Jun 201445266498.164.74$47,514
May 201436528494.734.73$35,919
Apr 201427984495.944.81$30,826
Mar 20145321,51395.895.06$58,664
Feb 20144681,43297.406.19$54,450
Jan 20147592,50390.404.86$80,780
Dec 20137751,34891.824.35$77,030
Nov 2013431988.853.74$3,892
Oct 201335050697.423.78$36,009
Sep 20136981,717104.113.72$79,052
Aug 20138532,129104.253.52$96,425
Jul 20134661,585102.523.72$53,667
Jun 20135121,51194.403.93$54,276
May 20136761,79894.834.15$71,565
Apr 20135891,45093.964.28$61,552
Mar 20137021,55593.623.91$71,806
Feb 20136501,44691.233.42$64,245
Jan 20136161,43291.603.42$61,323
Dec 20125741,39986.773.42$54,591
Nov 20126621,36686.953.62$62,513
Oct 20126111,39489.383.40$59,350
Sep 20124761,68394.672.92$49,975
Aug 20127411,63092.662.91$73,401
Jul 20126431,92385.133.02$60,548
Jun 20121,1052,20079.822.52$93,743
May 20121,1702,16091.612.49$112,558
Apr 20121,3953,009101.652.00$147,810
Mar 20124831,308105.052.22$53,646
Feb 20127781,369101.102.57$82,174
Jan 20121,3191,70298.092.73$134,034
Dec 20112811,18696.873.24$31,063
Nov 201123131095.723.31$23,138
Oct 201114084.983.65$1,190
Sep 2011101,30583.623.99$6,038
Aug 2011671,61983.404.15$12,306
Jul 2011922,63294.144.52$20,550
Jun 20111102,68992.904.64$22,696
May 2011742,84798.134.40$19,802
Apr 2011552,709105.964.33$17,567
Mar 2011742,79496.364.06$18,467
Feb 20117994685.644.18$10,720
Jan 2011892,91486.504.59$21,070
Dec 20101563,33985.734.35$27,891
Nov 2010893,00380.843.80$18,592
Oct 20101663,66978.103.51$25,839
Sep 20101433,97972.633.98$26,220
Aug 20101053,63773.684.42$23,810
Jul 20101093,52072.554.74$24,580
Jun 20101322,58970.364.91$22,001
May 2010661,60771.124.24$11,500
Apr 2010921,00781.694.12$11,667
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 201005474.365.96$322
Dec 20092820071.445.48$3,097
Nov 20091431,35374.593.75$15,742
Oct 20091282,99972.544.11$21,612
Sep 20091823,88265.543.06$23,826
Aug 20091162,58767.423.22$16,147
Jul 20092403,09761.133.46$25,401
Jun 20091032,18966.163.90$15,341
May 20091641,87054.743.93$16,319
Apr 2009983,91946.773.59$18,643
Mar 20091694,81842.144.06$26,678
Feb 20092433,78432.814.63$25,504
Jan 20091032,44935.865.37$16,847
Dec 20081922,91837.105.98$24,564
Nov 2008441,98155.496.86$16,032
Oct 20081152,20875.246.92$23,936
Sep 20081072,528101.767.88$30,802
Aug 20081103,122114.228.48$39,048
Jul 20081043,200131.0811.39$50,079
Jun 20081122,508131.3313.03$47,395
May 2008513,160123.1711.57$42,856
Apr 20081043,710110.3110.45$50,260
Mar 2008661,760101.909.66$23,734
Feb 20081072,49592.538.77$31,783
Jan 20081764,47990.388.21$52,660
Dec 20071233,58488.337.30$37,035
Nov 2007882,72691.677.29$27,944
Oct 20071875,68882.856.92$54,865
Sep 20072276,88875.846.24$60,225
Aug 20072266,96069.066.39$60,068
Jul 20072696,76870.906.39$62,306
Jun 20072124,99762.007.55$50,864
May 20071485,39158.747.85$50,993
Apr 20071875,86359.617.81$56,909
Mar 20072335,58356.927.30$54,029
Feb 20071623,58655.108.22$38,389
Jan 20072935,83550.306.73$53,989
Dec 20062996,86956.656.92$64,461
Nov 20062485,75754.207.62$57,295
Oct 20063436,74954.906.01$59,418
Sep 20063047,15360.085.04$54,295
Aug 20061337,55868.717.34$64,614
Jul 20062007,27569.376.34$60,018
Jun 20062155,14966.286.38$47,121
May 20061616,22466.016.42$50,617
Apr 20061556,36064.397.36$56,793
Mar 20062313,59156.707.08$38,532
Feb 20064756,49257.597.75$77,676
Jan 20062595,68260.598.93$66,452
Dec 20054427,41154.9413.42$123,705
Nov 20053765,12554.6910.59$74,829
Oct 20053996,44658.3413.80$112,205
Sep 20053725,77861.4512.08$92,652
Aug 20053164,72761.519.80$65,747
Jul 20052963,47755.697.84$43,757
Jun 20053083,42652.337.38$41,405
May 20052755,40645.226.65$48,392
Apr 20054095,99249.207.36$64,227
Mar 20054215,76650.377.15$62,461
Feb 20053405,70145.226.31$51,359
Jan 20053305,59643.166.32$49,622
Dec 20042043,03239.866.75$28,601
Nov 20043445,71745.286.33$51,767
Oct 20043246,53949.706.52$58,705
Sep 20043695,93243.245.28$47,300
Aug 20043156,12842.375.55$47,361
Jul 20042443,76638.286.08$32,253
Jun 20043587,27236.106.43$59,705
May 20043627,05837.486.49$59,407
Apr 20044729,21834.475.86$70,273
Mar 20045778,19734.365.53$65,156
Feb 20043805,96132.455.51$45,174
Jan 20042513,39632.036.30$29,433
Dec 20035057,23130.266.30$60,848
Nov 20032312,74028.804.60$19,244
Oct 20035015,69528.174.76$41,219
Sep 20035046,67626.314.75$44,967
Aug 20034927,54729.765.13$53,356
Jul 20035617,91529.415.17$57,426
Jun 20035157,15928.565.98$57,540
May 20036027,47426.595.97$60,647
Apr 20034517,51226.675.41$52,648
Mar 20033184,42931.146.10$36,902
Feb 20032603,85233.487.93$39,235
Jan 20034905,36630.315.58$44,805
Dec 20025066,37626.914.85$44,564
Nov 20024435,80624.664.14$34,944
Oct 20024344,57226.464.23$30,819
Sep 20025555,17527.443.64$34,041
Aug 20027957,89425.963.16$45,616
Jul 20027918,40224.583.06$45,168
Jun 20026588,79323.733.34$44,967
May 20024729,38524.663.58$45,275
Apr 20025529,75023.653.51$47,300
Mar 200263510,46622.003.10$46,443
Feb 20026499,81718.222.38$35,147
Jan 200265811,15017.172.38$37,787
Dec 200173311,47116.932.36$39,532
Nov 200176411,98618.072.41$42,638
Oct 200189012,45719.782.53$49,106
Sep 20017999,64524.262.25$41,098
Aug 200183514,15224.873.05$63,975
Jul 200183315,06823.933.20$68,107
Jun 200174414,81524.563.82$74,928
May 200194517,01525.524.31$97,405
Apr 20011,07518,78024.685.34$126,728
Mar 20012,02924,07124.545.38$179,208
Feb 20011,83527,51927.755.77$209,626
Jan 20012,25934,66427.478.40$353,189
Dec 20003,47546,79226.889.12$520,268
Nov 20005,19967,06332.215.66$546,902
Oct 20003,34450,24431.235.15$362,964
Sep 2000381031.875.19$12,142

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2017 — as filed, then multipliedworked
Condensate             1 bbl  × $ 57.27 =        $57
Gas                    0 Mcf  × $  2.92 =         $0

────────────────────────────────────────────────────
Month total                                      $57

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/180362 is the state's own key, not one this site invented.