UNIVERSITY 8

Operated by FULLER PRODUCTION, INC. (P-5 288587) in the VIEJOS (DEVONIAN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 184712District 08Field 93771200Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$1.7 M
Jul 2001 – Sep 2011
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
123
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 29 leases and 48 wells, and the rule below applies to all of them.

Discovered
1990-09-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1994-12-05.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: O&G # 08-0210281 TEMP. FD. RULES MADE PERMANENT; INTERVAL EXPAND.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1 bbl$66
GasProduction297,943 Mcf$1,686,123
Total$1,686,189

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.9535, -102.2755. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.95352, -102.27553 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,450 ft
1 wells filed one
Completion to plug
19.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,450 ft.

Completions filed
Mar 1992
1 of 1 wells
Plug dates filed
Sep 2011
1 of 1 wells

Last completion to plug: a median of 19.5 years across the 1 well that filed both dates, with the middle half between 19.5 years and 19.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3713633736,450 ftMar 1992Sep 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (123)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

123 months

Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201109994.144.52$447
Jun 2011016092.904.64$742
May 2011015998.134.40$700
Apr 20110254105.964.33$1,101
Mar 2011020396.364.06$824
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 201002985.734.35$126
Nov 201003680.843.80$137
Oct 2010046378.103.51$1,625
Sep 2010090472.633.98$3,597
Aug 2010087073.684.42$3,845
Jul 2010086672.554.74$4,102
Jun 2010085270.364.91$4,184
May 2010078971.124.24$3,342
Apr 2010060581.694.12$2,494
Mar 2010015578.394.39$680
Feb 201002273.585.44$120
Jan 201003374.365.96$197
Dec 200903371.445.48$181
Nov 20090974.593.75$34
Oct 2009076272.544.11$3,132
Sep 200902,55365.543.06$7,824
Aug 200902,65067.423.22$8,529
Jul 200902,49161.133.46$8,630
Jun 200902,36666.163.90$9,216
May 200902,52354.743.93$9,905
Apr 200901,20346.773.59$4,316
Mar 2009042942.144.06$1,741
Feb 2009038132.814.63$1,765
Jan 2009031635.865.37$1,697
Dec 2008023137.105.98$1,381
Nov 2008042355.496.86$2,902
Oct 2008053275.246.92$3,682
Sep 200801,564101.767.88$12,320
Aug 200801,346114.228.48$11,418
Jul 200801,384131.0811.39$15,763
Jun 200802,042131.3313.03$26,613
May 200802,755123.1711.57$31,887
Apr 200802,832110.3110.45$29,608
Mar 200802,793101.909.66$26,992
Feb 200802,82892.538.77$24,803
Jan 200803,18990.388.21$26,168
Dec 200703,30788.337.30$24,148
Nov 200703,18291.677.29$23,202
Oct 200703,32682.856.92$23,023
Sep 200703,25875.846.24$20,343
Aug 200703,38969.066.39$21,649
Jul 200703,03670.906.39$19,394
Jun 200703,48262.007.55$26,284
May 200703,80358.747.85$29,839
Apr 200703,59459.617.81$28,052
Mar 200703,98756.927.30$29,113
Feb 200703,55755.108.22$29,224
Jan 200703,82550.306.73$25,730
Dec 200604,01456.656.92$27,771
Nov 200604,14354.207.62$31,559
Oct 200604,36954.906.01$26,274
Sep 200604,25060.085.04$21,408
Aug 200604,38368.717.34$32,171
Jul 200604,34969.376.34$27,585
Jun 200602,75466.286.38$17,581
May 2006111866.016.42$824
Apr 2006047864.397.36$3,518
Mar 2006090656.707.08$6,417
Feb 200601,42457.597.75$11,038
Jan 2006073460.598.93$6,557
Dec 2005022054.9413.42$2,951
Nov 2005080454.6910.59$8,513
Oct 2005039158.3413.80$5,394
Sep 2005033561.4512.08$4,046
Aug 200501,72261.519.80$16,870
Jul 200503,55955.697.84$27,916
Jun 200503,47352.337.38$25,634
May 200503,77845.226.65$25,128
Apr 200502,62149.207.36$19,292
Mar 200502,35650.377.15$16,857
Feb 200503,31945.226.31$20,949
Jan 200504,02243.166.32$25,428
Dec 200404,58939.866.75$30,981
Nov 200404,83445.286.33$30,601
Oct 200403,34349.706.52$21,780
Sep 200403,13243.245.28$16,549
Aug 200402,86642.375.55$15,908
Jul 200402,90238.286.08$17,656
Jun 2004049336.106.43$3,171
May 2004094037.486.49$6,105
Apr 200401,26834.475.86$7,429
Mar 200401,93834.365.53$10,717
Feb 200402,85332.455.51$15,719
Jan 200403,83932.036.30$24,184
Dec 200304,36030.266.30$27,475
Nov 200304,53328.804.60$20,830
Oct 200305,05928.174.76$24,079
Sep 200304,86226.314.75$23,091
Aug 200304,60029.765.13$23,597
Jul 200302,87129.415.17$14,845
Jun 200303,84428.565.98$22,999
May 200304,09826.595.97$24,476
Apr 200303,74326.675.41$20,239
Mar 200301,91331.146.10$11,662
Feb 2003075133.487.93$5,952
Jan 2003079030.315.58$4,410
Dec 200202,21226.914.85$10,737
Nov 200203,52424.664.14$14,579
Oct 200204,79226.464.23$20,266
Sep 200204,86927.443.64$17,700
Aug 200205,55825.963.16$17,586
Jul 200205,81924.583.06$17,816
Jun 200205,97223.733.34$19,936
May 200206,25824.663.58$22,429
Apr 200206,13523.653.51$21,548
Mar 200206,32822.003.10$19,634
Feb 200205,00118.222.38$11,881
Jan 200202,65417.172.38$6,305
Dec 200102,45916.932.36$5,814
Nov 200103,59918.072.41$8,657
Oct 200104,72219.782.53$11,941
Sep 200104,60524.262.25$10,367
Aug 200104,61324.873.05$14,084
Jul 20010023.933.20$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2011 — as filed, then multipliedworked
Condensate             0 bbl  × $ 94.14 =         $0
Gas                   99 Mcf  × $  4.52 =       $447

────────────────────────────────────────────────────
Month total                                     $447

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/184712 is the state's own key, not one this site invented.