CAMPBELL TR. 4

Operated by Q NATURAL RESOURCES, LLC (P-5 684427) in the KERMIT (MCKEE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 194280District 08Field 49038426CondensateGasSaveExport
Value, all time
$966 k
Apr 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
278
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 61 leases and 74 wells, and the rule below applies to all of them.

Discovered
1960-02-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition710 bbl$41,021
GasProduction161,099 Mcf$925,166
Total$966,187

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8826, -103.0348. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.88261, -103.03480 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,198 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,198 ft.

Completions filed
Apr 2003
1 of 1 wells
Plug dates filed
Jun 1980
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-495046091510,198 ftApr 2003Jun 1980

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (278)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

278 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230589.042.74$14
Aug 202301080.522.67$27
Jul 202309874.852.64$259
Jun 202309468.962.26$212
May 202306870.622.23$151
Apr 20230078.122.24$0
Mar 202305472.852.39$129
Feb 2023022575.112.47$555
Jan 202302976.533.39$98
Dec 202206376.415.73$361
Nov 2022022885.005.65$1,287
Oct 2022013087.185.86$762
Sep 202208684.888.16$702
Aug 202207994.529.13$721
Jul 202205101.587.54$38
Jun 2022071115.097.98$566
May 20220212109.378.43$1,788
Apr 20220189104.226.84$1,292
Mar 20220216108.885.08$1,097
Feb 2022020091.054.86$972
Jan 2022014181.844.54$640
Dec 2021016271.323.90$632
Nov 2021030077.435.24$1,571
Oct 2021021579.795.71$1,228
Sep 202106769.865.35$359
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210569.493.38$17
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 2021016761.302.72$454
Feb 20210057.805.55$0
Jan 202109750.412.81$273
Dec 20200544.642.68$13
Nov 20200538.772.71$14
Oct 20200536.972.48$12
Sep 20200537.091.99$10
Aug 20200539.982.39$12
Jul 2020023838.371.83$434
Jun 2020017134.901.69$289
May 2020021816.921.81$396
Apr 2020024914.751.80$449
Mar 2020028430.341.86$527
Feb 2020028649.881.98$566
Jan 2020028657.252.09$599
Dec 2019030259.012.30$696
Nov 2019028655.302.75$787
Oct 2019031453.472.42$759
Sep 2019034355.052.66$911
Aug 2019044553.112.30$1,025
Jul 2019038756.272.46$952
Jun 2019045952.782.49$1,143
May 2019053558.482.74$1,466
Apr 2019041862.632.75$1,150
Mar 2019030056.803.06$919
Feb 2019045050.852.79$1,257
Jan 2019058046.033.23$1,872
Dec 2018050046.594.19$2,093
Nov 2018034252.934.24$1,449
Oct 2018048161.443.40$1,634
Sep 2018053559.543.11$1,663
Aug 2018057059.403.07$1,748
Jul 2018052065.142.93$1,525
Jun 2018044260.183.08$1,360
May 2018042665.382.90$1,236
Apr 2018048963.842.90$1,418
Mar 2018050961.222.79$1,419
Feb 2018042361.782.77$1,170
Jan 2018035762.874.01$1,431
Dec 2017031957.272.92$932
Nov 2017039755.423.12$1,238
Oct 2017017649.292.98$525
Sep 2017044947.523.09$1,386
Aug 2017048745.373.00$1,463
Jul 2017040843.873.09$1,260
Jun 2017038642.493.09$1,192
May 2017034645.373.26$1,129
Apr 2017038847.933.21$1,246
Mar 2017028246.772.98$841
Feb 2017043750.452.95$1,290
Jan 2017052549.413.42$1,795
Dec 2016049348.763.72$1,835
Nov 2016059442.492.64$1,571
Oct 2016054246.193.09$1,675
Sep 2016052641.553.10$1,631
Aug 2016052141.442.92$1,524
Jul 2016041541.622.92$1,214
Jun 2016056445.352.69$1,515
May 2016051642.521.99$1,027
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 2011132584.983.65$1,271
Sep 2011427983.623.99$1,447
Aug 2011335383.404.15$1,715
Jul 201127794.144.52$536
Jun 2011421792.904.64$1,378
May 2011330998.134.40$1,655
Apr 20113234105.964.33$1,332
Mar 2011331396.364.06$1,559
Feb 2011428585.644.18$1,534
Jan 2011429986.504.59$1,718
Dec 2010334585.734.35$1,757
Nov 2010534980.843.80$1,729
Oct 2010535078.103.51$1,619
Sep 2010432772.633.98$1,592
Aug 2010436673.684.42$1,912
Jul 2010536672.554.74$2,096
Jun 2010433770.364.91$1,936
May 2010535771.124.24$1,868
Apr 2010334481.694.12$1,663
Mar 2010537978.394.39$2,055
Feb 2010534773.585.44$2,256
Jan 2010539974.365.96$2,751
Dec 2009441071.445.48$2,534
Nov 2009440474.593.75$1,814
Oct 2009548772.544.11$2,364
Sep 2009246065.543.06$1,541
Aug 2009442967.423.22$1,650
Jul 2009426161.133.46$1,149
Jun 2009553266.163.90$2,403
May 2009555854.743.93$2,464
Apr 2009558946.773.59$2,347
Mar 2009660042.144.06$2,688
Feb 2009654132.814.63$2,703
Jan 2009660135.865.37$3,443
Dec 2008559837.105.98$3,760
Nov 2008458855.496.86$4,256
Oct 2008669675.246.92$5,269
Sep 20087393101.767.88$3,808
Aug 20085828114.228.48$7,595
Jul 20083840131.0811.39$9,960
Jun 20087769131.3313.03$10,941
May 200810800123.1711.57$10,491
Apr 200810793110.3110.45$9,394
Mar 20086774101.909.66$8,091
Feb 2008972092.538.77$7,148
Jan 2008879790.388.21$7,263
Dec 2007778788.337.30$6,365
Nov 2007484991.677.29$6,557
Oct 2007693082.856.92$6,935
Sep 2007893975.846.24$6,470
Aug 2007886969.066.39$6,104
Jul 200761,02870.906.39$6,992
Jun 2007121,02362.007.55$8,466
May 2007151,01258.747.85$8,822
Apr 200781,08359.617.81$8,930
Mar 2007480556.927.30$6,106
Feb 2007649755.108.22$4,414
Jan 2007058250.306.73$3,915
Dec 2006555956.656.92$4,151
Nov 2006171,07454.207.62$9,103
Oct 2006161,23154.906.01$8,281
Sep 2006787260.085.04$4,813
Aug 2006461068.717.34$4,752
Jul 200681,17769.376.34$8,020
Jun 2006799066.286.38$6,784
May 2006782666.016.42$5,769
Apr 200641,01064.397.36$7,692
Mar 2006111,20256.707.08$9,137
Feb 2006101,07457.597.75$8,901
Jan 2006491360.598.93$8,398
Dec 200591,00454.9413.42$13,964
Nov 2005181,53654.6910.59$17,248
Oct 2005151,32258.3413.80$19,113
Sep 20051088861.4512.08$11,341
Aug 2005101,58961.519.80$16,182
Jul 2005771455.697.84$5,990
Jun 200506052.337.38$443
May 2005010245.226.65$678
Apr 2005723249.207.36$2,052
Mar 2005527450.377.15$2,212
Feb 2005322945.226.31$1,581
Jan 200501443.166.32$89
Dec 20040039.866.75$0
Nov 20041845.286.33$96
Oct 200404649.706.52$300
Sep 2004870743.245.28$4,082
Aug 200441,08842.375.55$6,209
Jul 200481,41338.286.08$8,903
Jun 2004376636.106.43$5,036
May 200481,43837.486.49$9,639
Apr 2004131,95434.475.86$11,896
Mar 2004488334.365.53$5,021
Feb 2004046632.455.51$2,567
Jan 200492,99132.036.30$19,130
Dec 2003194,54530.266.30$29,216
Nov 200375,95128.804.60$27,547
Oct 200344,86328.174.76$23,259
Sep 200385,11826.314.75$24,518
Aug 200396,86929.765.13$35,504
Jul 2003198,51829.415.17$44,604
Jun 20033210,30728.565.98$62,580
May 20036615,08026.595.97$91,823
Apr 2003012,60026.675.41$68,132

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2023 — as filed, then multipliedworked
Condensate             0 bbl  × $ 89.04 =         $0
Gas                    5 Mcf  × $  2.74 =        $14

────────────────────────────────────────────────────
Month total                                      $14

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/194280 is the state's own key, not one this site invented.