COPE, R. L.

Operated by MERIT ENERGY COMPANY (P-5 561136) in the CONGER, SW (PENN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 204005District 08Field 20101500CondensateGasSaveExport
Value, all time
$398 k
Apr 2004 – Dec 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
93
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 271 leases and 445 wells, and the rule below applies to all of them.

Discovered
1979-02-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-07-01.

The Commission's schedule remark for this field reads: OPERATOR REQUEST. TEXACO E & P INC ALLICIANT..

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition393 bbl$23,742
GasProduction54,739 Mcf$374,692
Total$398,435

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6533, -101.2506. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.65328, -101.25063 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,525 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,525 ft.

Completions filed
Apr 2010
1 of 1 wells

1 well

42-4313278088,525 ftApr 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (93)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

93 months

Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20102071.124.24$142
Apr 20104181.694.12$331
Mar 2010657478.394.39$2,989
Feb 201031,02673.585.44$5,805
Jan 2010492074.365.96$5,784
Dec 2009485271.445.48$4,958
Nov 2009393974.593.75$3,746
Oct 200911,30972.544.11$5,453
Sep 2009183665.543.06$2,628
Aug 2009576967.423.22$2,812
Jul 2009496561.133.46$3,588
Jun 2009287166.163.90$3,525
May 2009489854.743.93$3,744
Apr 2009283546.773.59$3,089
Mar 200931,03642.144.06$4,332
Feb 2009387932.814.63$4,171
Jan 2009151835.865.37$2,818
Dec 2008038237.105.98$2,283
Nov 2008054555.496.86$3,739
Oct 2008351575.246.92$3,791
Sep 20080510101.767.88$4,017
Aug 20080470114.228.48$3,987
Jul 20084433131.0811.39$5,456
Jun 20080440131.3313.03$5,734
May 20080512123.1711.57$5,926
Apr 20087542110.3110.45$6,439
Mar 20080573101.909.66$5,538
Feb 2008057492.538.77$5,034
Jan 20081253790.388.21$5,491
Dec 2007048988.337.30$3,571
Nov 2007050091.677.29$3,646
Oct 20071247882.856.92$4,303
Sep 2007051475.846.24$3,210
Aug 2007744669.066.39$3,332
Jul 2007050870.906.39$3,245
Jun 2007056762.007.55$4,280
May 2007750958.747.85$4,405
Apr 2007054959.617.81$4,285
Mar 2007747656.927.30$3,874
Feb 2007050655.108.22$4,157
Jan 2007757150.306.73$4,193
Dec 2006060256.656.92$4,165
Nov 2006871454.207.62$5,872
Oct 2006079154.906.01$4,757
Sep 20061271260.085.04$4,307
Aug 20064573168.717.34$8,457
Jul 2006064469.376.34$4,085
Jun 2006064266.286.38$4,098
May 2006068766.016.42$4,414
Apr 2006067764.397.36$4,983
Mar 2006076056.707.08$5,383
Feb 2006063957.597.75$4,953
Jan 20063177160.598.93$8,766
Dec 2005682954.9413.42$11,451
Nov 2005077954.6910.59$8,248
Oct 20051695758.3413.80$14,136
Sep 2005461,02561.4512.08$15,208
Aug 200501,01661.519.80$9,954
Jul 200501,01755.697.84$7,977
Jun 2005077152.337.38$5,691
May 20052469345.226.65$5,695
Apr 2005073949.207.36$5,439
Mar 200501,56450.377.15$11,190
Feb 2005066745.226.31$4,210
Jan 20053175643.166.32$6,118
Dec 2004086039.866.75$5,806
Nov 200401,12545.286.33$7,122
Oct 2004231,20149.706.52$8,968
Sep 200401,05243.245.28$5,559
Aug 2004211,22542.375.55$7,689
Jul 200401,20838.286.08$7,350
Jun 2004121,31736.106.43$8,905
May 200401,21737.486.49$7,904
Apr 2004097734.475.86$5,724

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2010 — as filed, then multipliedworked
Condensate             2 bbl  × $ 71.12 =       $142
Gas                    0 Mcf  × $  4.24 =         $0

────────────────────────────────────────────────────
Month total                                     $142

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/204005 is the state's own key, not one this site invented.