ENDURING FREEDOM

Operated by CAPITAN ENERGY, INCORPORATED (P-5 130061) in the GERALDINE, SOUTH (OLDS -A-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208606District 08Field 34532500CondensateGasSaveExport
Value, all time
$2.9 M
Mar 2004 – Oct 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
176
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 72 leases and 78 wells, and the rule below applies to all of them.

Discovered
1987-09-02
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/2006.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition138 bbl$7,763
GasProduction430,227 Mcf$2,900,289
Total$2,908,052

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7545, -104.1182. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.75446, -104.11819 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,955 ft
1 wells filed one
Completion to plug
14.6 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,955 ft.

Completions filed
Mar 2004
1 of 1 wells
Plug dates filed
Oct 2018
1 of 1 wells

Last completion to plug: a median of 14.6 years across the 1 well that filed both dates, with the middle half between 14.6 years and 14.6 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1093222842,955 ftMar 2004Oct 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (176)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

176 months

Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20118092.904.64$743
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 201006,36580.843.80$24,157
Oct 201008,98378.103.51$31,520
Sep 201006,54972.633.98$26,062
Aug 201006,13573.684.42$27,113
Jul 201006,76372.554.74$32,033
Jun 201005,45570.364.91$26,786
May 201006,02771.124.24$25,526
Apr 201006,16281.694.12$25,404
Mar 201006,39978.394.39$28,083
Feb 201005,49873.585.44$29,922
Jan 201006,22874.365.96$37,144
Dec 2009253,19171.445.48$19,285
Nov 200905,07274.593.75$19,028
Oct 200906,16972.544.11$25,356
Sep 200905,82265.543.06$17,843
Aug 200906,06167.423.22$19,507
Jul 200905,89661.133.46$20,427
Jun 200905,57966.163.90$21,730
May 200905,99954.743.93$23,551
Apr 200905,47446.773.59$19,638
Mar 200906,55542.144.06$26,607
Feb 200906,63432.814.63$30,735
Jan 200906,64335.865.37$35,680
Dec 200805,44837.105.98$32,563
Nov 200806,45255.496.86$44,263
Oct 200806,13175.246.92$42,439
Sep 200806,507101.767.88$51,256
Aug 200806,680114.228.48$56,667
Jul 200805,709131.0811.39$65,022
Jun 200805,631131.3313.03$73,387
May 200806,240123.1711.57$72,224
Apr 200806,469110.3110.45$67,632
Mar 200805,611101.909.66$54,225
Feb 200806,31492.538.77$55,377
Jan 200806,86690.388.21$56,341
Dec 200706,58688.337.30$48,091
Nov 200706,25991.677.29$45,639
Oct 200706,12082.856.92$42,363
Sep 200705,61675.846.24$35,067
Aug 200704,83569.066.39$30,886
Jul 200704,90970.906.39$31,358
Jun 200705,95762.007.55$44,966
May 200705,10258.747.85$40,032
Apr 200706,38559.617.81$49,836
Mar 200704,36456.927.30$31,866
Feb 2007015555.108.22$1,273
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 200604,98760.085.04$25,121
Aug 200606,13068.717.34$44,994
Jul 200606,18269.376.34$39,211
Jun 200606,05866.286.38$38,674
May 200606,48566.016.42$41,666
Apr 200606,26864.397.36$46,135
Mar 200606,04556.707.08$42,816
Feb 200605,63857.597.75$43,701
Jan 200606,24360.598.93$55,771
Dec 200506,31354.9413.42$84,691
Nov 200506,01554.6910.59$63,689
Oct 200506,19258.3413.80$85,423
Sep 200505,37061.4512.08$64,864
Aug 2005235,89361.519.80$59,148
Jul 200505,62355.697.84$44,105
Jun 2005115,59952.337.38$41,902
May 200506,60945.226.65$43,958
Apr 200505,48349.207.36$40,358
Mar 2005305,20950.377.15$38,781
Feb 200504,77345.226.31$30,127
Jan 200505,15243.166.32$32,572
Dec 200405,70139.866.75$38,488
Nov 200404,87745.286.33$30,873
Oct 2004165,52449.706.52$36,785
Sep 200404,73743.245.28$25,030
Aug 200404,03042.375.55$22,369
Jul 200402,80438.286.08$17,060
Jun 200401,92936.106.43$12,409
May 2004252,72937.486.49$18,661
Apr 200402,79534.475.86$16,374
Mar 200402,82934.365.53$15,645

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2011 — as filed, then multipliedworked
Condensate             8 bbl  × $ 92.90 =       $743
Gas                    0 Mcf  × $  4.64 =         $0

────────────────────────────────────────────────────
Month total                                     $743

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/208606 is the state's own key, not one this site invented.