LA ESCALERA

Operated by CAMERON EXPLORATION, INC. (P-5 126996) in the ELSINORE, WEST FARM (DEVONIAN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 211685District 08Field 28778400GasSaveExport
Value, all time
$56.4 M
Aug 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
250
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1982-12-01
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction8,143,698 Mcf$56,398,730
Total$56,398,730

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 30.6689, -103.2627. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

30.66895, -103.26275 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,725 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,725 ft.

Completions filed
Aug 2005
1 of 1 wells

1 well

42-371375371AH13,725 ftAug 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (250)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

250 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 201914450.852.79$402
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 20177057.272.92$205
Nov 20171,03555.423.12$3,228
Oct 201747449.292.98$1,414
Sep 20171,91447.523.09$5,909
Aug 201742345.373.00$1,271
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 20178,03247.933.21$25,796
Mar 20172,15446.772.98$6,427
Feb 201710,85950.452.95$32,062
Jan 20175,75149.413.42$19,662
Dec 20163,76648.763.72$14,020
Nov 2016042.492.64$0
Oct 20167,32146.193.09$22,624
Sep 201615,20641.553.10$47,148
Aug 201620,68741.442.92$60,496
Jul 201610,52241.622.92$30,770
Jun 20161,66845.352.69$4,480
May 20162,40142.521.99$4,780
Apr 20166,94636.561.99$13,830
Mar 2016033.011.79$0
Feb 20163,83226.472.06$7,908
Jan 20162,53727.352.36$5,998
Dec 20158,27532.362.00$16,562
Nov 201519,92938.792.17$43,193
Oct 201519,95643.552.43$48,425
Sep 201514,91342.992.76$41,136
Aug 201518,74840.162.87$53,853
Jul 201520,41848.152.95$60,133
Jun 201514,70656.152.88$42,395
May 20159,72855.212.96$28,751
Apr 201520,71949.822.71$56,077
Mar 201519,00642.892.93$55,777
Feb 20158,94144.662.98$26,610
Jan 201513,26543.433.10$41,130
Dec 201416254.693.59$582
Nov 20147670.464.25$323
Oct 201414178.303.90$550
Sep 20145886.164.05$235
Aug 20146889.394.04$274
Jul 201445596.564.18$1,902
Jun 20149098.164.74$426
May 201429994.734.73$1,413
Apr 201415295.944.81$731
Mar 20146495.895.06$324
Feb 201457897.406.19$3,579
Jan 20147490.404.86$360
Dec 201313,11691.824.35$57,113
Nov 201313,54688.853.74$50,639
Oct 201310,76097.423.78$40,666
Sep 201355104.113.72$204
Aug 2013304104.253.52$1,071
Jul 20138,600102.523.72$31,973
Jun 201318,26794.403.93$71,852
May 201320,10694.834.15$83,421
Apr 201320,70693.964.28$88,675
Mar 201321,49893.623.91$84,119
Feb 201312,33491.233.42$42,181
Jan 201379691.603.42$2,722
Dec 201248686.773.42$1,662
Nov 201218,15386.953.62$65,804
Oct 201224,60089.383.40$83,632
Sep 20127,10694.672.92$20,738
Aug 201219,89192.662.91$57,846
Jul 201217,09085.133.02$51,625
Jun 201215,91579.822.52$40,091
May 201223,56891.612.49$58,645
Apr 201224,047101.652.00$48,017
Mar 201225,122105.052.22$55,823
Feb 201224,029101.102.57$61,760
Jan 201226,38198.092.73$72,128
Dec 201127,47796.873.24$89,018
Nov 201126,93595.723.31$89,189
Oct 201128,82784.983.65$105,176
Sep 201122,28283.623.99$88,812
Aug 201128,87683.404.15$119,816
Jul 201131,84194.144.52$143,833
Jun 201132,43092.904.64$150,471
May 201127,38998.134.40$120,644
Apr 201130,149105.964.33$130,644
Mar 201131,80596.364.06$129,044
Feb 201118,77585.644.18$78,479
Jan 201135,51086.504.59$162,948
Dec 201036,09385.734.35$156,923
Nov 201036,02280.843.80$136,715
Oct 201036,80978.103.51$129,159
Sep 201034,93672.633.98$139,027
Aug 201039,96973.684.42$176,637
Jul 201040,77672.554.74$193,135
Jun 201041,65170.364.91$204,523
May 201044,04271.124.24$186,528
Apr 201037,24881.694.12$153,562
Mar 201038,41078.394.39$168,569
Feb 201035,41573.585.44$192,741
Jan 201040,22474.365.96$239,900
Dec 200942,12771.445.48$231,014
Nov 200941,52874.593.75$155,792
Oct 200944,42572.544.11$182,598
Sep 200944,52965.543.06$136,470
Aug 200947,13067.423.22$151,688
Jul 200949,24161.133.46$170,595
Jun 200950,44666.163.90$196,487
May 200954,52954.743.93$214,067
Apr 200956,19246.773.59$201,589
Mar 200961,85842.144.06$251,082
Feb 200947,73732.814.63$221,166
Jan 200945,93935.865.37$246,738
Dec 200832,27637.105.98$192,918
Nov 200826,17955.496.86$179,597
Oct 200854,05375.246.92$374,154
Sep 200861,978101.767.88$488,206
Aug 200863,297114.228.48$536,950
Jul 200866,858131.0811.39$761,475
Jun 200873,068131.3313.03$952,268
May 200858,318123.1711.57$674,989
Apr 200880,071110.3110.45$837,131
Mar 200890,351101.909.66$873,158
Feb 200891,76392.538.77$804,815
Jan 200898,59890.388.21$809,069
Dec 2007101,26088.337.30$739,397
Nov 2007104,97091.677.29$765,410
Oct 2007119,04282.856.92$824,006
Sep 2007121,68775.846.24$759,833
Aug 2007137,84569.066.39$880,546
Jul 2007147,88070.906.39$944,649
Jun 2007150,63562.007.55$1,137,061
May 2007164,58358.747.85$1,291,364
Apr 2007165,45059.617.81$1,291,370
Mar 2007178,27056.927.30$1,301,722
Feb 2007168,07555.108.22$1,380,904
Jan 2007193,62650.306.73$1,302,493
Dec 2006203,87356.656.92$1,410,483
Nov 2006209,14154.207.62$1,593,127
Oct 2006240,30054.906.01$1,445,116
Sep 2006242,39160.085.04$1,220,972
Aug 2006255,39768.717.34$1,874,594
Jul 2006262,39169.376.34$1,664,283
Jun 2006244,37066.286.38$1,560,029
May 2006246,93966.016.42$1,586,583
Apr 2006234,15364.397.36$1,723,478
Mar 2006251,48456.707.08$1,781,241
Feb 2006187,20657.597.75$1,451,056
Jan 2006204,61860.598.93$1,827,918
Dec 2005193,23154.9413.42$2,592,271
Nov 2005156,98754.6910.59$1,662,241
Oct 2005169,34058.3413.80$2,336,174
Sep 2005163,25461.4512.08$1,971,945
Aug 200575,87961.519.80$743,374

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2019 — as filed, then multipliedworked
Gas                  144 Mcf  × $  2.79 =       $402

────────────────────────────────────────────────────
Month total                                     $402

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/211685 is the state's own key, not one this site invented.