WILKINSON 3

Operated by ATROPOS PRODUCTION CORPORATION (P-5 36617) in the CREDO, E. (CISCO, UP.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 212282District 08Field 215981052 tax incentive programmesCondensateGasSaveExport
Value, all time
$529 k
Sep 2005 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 141 leases and 151 wells, and the rule below applies to all of them.

Discovered
1974-08-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-06-06.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 08/01/96.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-07-17193266
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition312 bbl$23,220
GasProduction97,363 Mcf$505,903
Total$529,124

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9492, -101.1548. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.94924, -101.15484 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,560 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,560 ft.

Completions filed
Sep 2005
1 of 1 wells

1 well

42-4313313437,560 ftSep 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

May 202600106.413.05$0
Apr 2026012798.932.87$364
Mar 202607789.753.15$243
Feb 202609163.503.75$341
Jan 202607959.138.00$632
Dec 202509056.664.41$397
Nov 202509058.593.93$353
Oct 202509159.383.30$301
Sep 202508662.743.08$265
Aug 2025011163.933.01$335
Jul 202509166.743.32$302
Jun 2025011866.483.13$369
May 2025013860.553.23$446
Apr 202508062.363.54$283
Mar 2025011467.704.27$487
Feb 2025710270.884.34$939
Jan 2025013274.324.28$565
Dec 2024011668.993.12$362
Nov 2024011469.052.20$251
Oct 2024011671.372.28$265
Sep 2024011969.612.36$281
Aug 2024013075.632.06$268
Jul 2024018279.932.15$391
Jun 2024010078.082.63$263
May 2024017778.812.20$389
Apr 202408884.451.66$146
Mar 2024018480.301.55$284
Feb 2024013776.091.78$244
Jan 2024015573.023.30$511
Dec 2023027371.262.61$713
Nov 2023015877.892.81$444
Oct 2023013285.443.09$408
Sep 2023011189.042.74$304
Aug 2023017180.522.67$457
Jul 2023019774.852.64$520
Jun 2023016868.962.26$379
May 2023023670.622.23$526
Apr 2023014978.122.24$333
Mar 2023018472.852.39$440
Feb 2023015375.112.47$377
Jan 2023021276.533.39$718
Dec 2022023576.415.73$1,346
Nov 2022021985.005.65$1,237
Oct 2022018087.185.86$1,055
Sep 2022020584.888.16$1,674
Aug 2022018694.529.13$1,698
Jul 20220154101.587.54$1,161
Jun 20220168115.097.98$1,340
May 20223173109.378.43$1,787
Apr 20220165104.226.84$1,128
Mar 20220171108.885.08$868
Feb 2022014291.054.86$690
Jan 2022019081.844.54$862
Dec 2021015471.323.90$600
Nov 2021018377.435.24$958
Oct 2021023279.795.71$1,326
Sep 2021020369.865.35$1,086
Aug 2021021466.024.22$903
Jul 2021019370.783.98$769
Jun 2021017169.493.38$578
May 2021024263.483.02$730
Apr 2021018360.362.76$505
Mar 2021024261.302.72$658
Feb 2021021357.805.55$1,182
Jan 2021021150.412.81$593
Dec 2020032244.642.68$862
Nov 2020025938.772.71$701
Oct 2020021436.972.48$530
Sep 2020028037.091.99$557
Aug 2020027039.982.39$644
Jul 2020032338.371.83$590
Jun 2020020934.901.69$353
May 2020024916.921.81$452
Apr 2020027214.751.80$491
Mar 2020024330.341.86$451
Feb 2020026049.881.98$515
Jan 2020030457.252.09$637
Dec 2019027759.012.30$638
Nov 2019029055.302.75$798
Oct 2019022653.472.42$547
Sep 2019030055.052.66$797
Aug 2019026353.112.30$606
Jul 2019032656.272.46$802
Jun 2019027952.782.49$695
May 2019026558.482.74$726
Apr 2019022562.632.75$619
Mar 2019024056.803.06$735
Feb 2019023750.852.79$662
Jan 2019027146.033.23$875
Dec 2018030546.594.19$1,277
Nov 2018032552.934.24$1,377
Oct 2018033061.443.40$1,121
Sep 2018032359.543.11$1,004
Aug 2018027559.403.07$843
Jul 2018025165.142.93$736
Jun 2018026760.183.08$822
May 2018028165.382.90$815
Apr 2018025663.842.90$743
Mar 2018024661.222.79$686
Feb 2018026261.782.77$725
Jan 2018028562.874.01$1,143
Dec 2017023357.272.92$681
Nov 2017023255.423.12$723
Oct 2017025949.292.98$773
Sep 2017023247.523.09$716
Aug 2017027345.373.00$820
Jul 2017023943.873.09$738
Jun 2017022542.493.09$695
May 2017027945.373.26$910
Apr 2017027047.933.21$867
Mar 2017029946.772.98$892
Feb 2017028750.452.95$847
Jan 2017030149.413.42$1,029
Dec 2016028348.763.72$1,054
Nov 2016031142.492.64$822
Oct 2016028546.193.09$881
Sep 2016027141.553.10$840
Aug 2016029541.442.92$863
Jul 2016029441.622.92$860
Jun 2016039045.352.69$1,047
May 2016040742.521.99$810
Apr 2016037936.561.99$755
Mar 20161234233.011.79$1,010
Feb 2016036226.472.06$747
Jan 2016021727.352.36$513
Dec 2015027332.362.00$546
Nov 2015024138.792.17$522
Oct 2015027643.552.43$670
Sep 2015018742.992.76$516
Aug 2015030940.162.87$888
Jul 2015023048.152.95$677
Jun 2015024756.152.88$712
May 2015025755.212.96$760
Apr 20151437149.822.71$1,702
Mar 2015040342.892.93$1,183
Feb 2015025244.662.98$750
Jan 2015030343.433.10$939
Dec 2014067754.693.59$2,431
Nov 2014077770.464.25$3,304
Oct 2014064478.303.90$2,512
Sep 2014078886.164.05$3,188
Aug 20141357389.394.04$3,474
Jul 2014062196.564.18$2,596
Jun 2014076798.164.74$3,633
May 2014053194.734.73$2,510
Apr 2014032795.944.81$1,573
Mar 2014044195.895.06$2,230
Feb 2014051097.406.19$3,158
Jan 2014037090.404.86$1,798
Dec 2013053791.824.35$2,338
Nov 2013039988.853.74$1,492
Oct 20131451797.423.78$3,318
Sep 20130474104.113.72$1,762
Aug 20130471104.253.52$1,659
Jul 20130444102.523.72$1,651
Jun 2013039594.403.93$1,554
May 2013035194.834.15$1,456
Apr 20131534493.964.28$2,883
Mar 2013035193.623.91$1,373
Feb 2013062291.233.42$2,127
Jan 2013044691.603.42$1,525
Dec 2012047186.773.42$1,611
Nov 20121431186.953.62$2,345
Oct 2012054589.383.40$1,853
Sep 2012055294.672.92$1,611
Aug 2012049592.662.91$1,440
Jul 2012041885.133.02$1,263
Jun 20121444379.822.52$2,233
May 2012037491.612.49$931
Apr 20120440101.652.00$879
Mar 20120372105.052.22$827
Feb 20120329101.102.57$846
Jan 2012056598.092.73$1,545
Dec 2011064596.873.24$2,090
Nov 20111253395.723.31$2,914
Oct 2011069084.983.65$2,517
Sep 2011073683.623.99$2,934
Aug 2011062083.404.15$2,573
Jul 2011059894.144.52$2,701
Jun 20111241792.904.64$3,050
May 2011040898.134.40$1,797
Apr 20110399105.964.33$1,729
Mar 2011047896.364.06$1,939
Feb 2011029485.644.18$1,229
Jan 20111244186.504.59$3,062
Dec 2010039785.734.35$1,726
Nov 2010030580.843.80$1,158
Oct 2010043478.103.51$1,523
Sep 2010040872.633.98$1,624
Aug 20101240673.684.42$2,678
Jul 2010047272.554.74$2,236
Jun 2010028070.364.91$1,375
May 2010034371.124.24$1,453
Apr 20101238081.694.12$2,547
Mar 2010035378.394.39$1,549
Feb 2010040773.585.44$2,215
Jan 2010045774.365.96$2,726
Dec 2009053071.445.48$2,906
Nov 20091254174.593.75$2,925
Oct 2009054972.544.11$2,257
Sep 2009052065.543.06$1,594
Aug 2009048367.423.22$1,555
Jul 2009052961.133.46$1,833
Jun 20091248266.163.90$2,671
May 2009054554.743.93$2,140
Apr 2009061846.773.59$2,217
Mar 2009063442.144.06$2,573
Feb 2009072632.814.63$3,364
Jan 2009059735.865.37$3,206
Dec 20081371137.105.98$4,732
Nov 2008068655.496.86$4,706
Oct 2008034675.246.92$2,395
Sep 20080361101.767.88$2,844
Aug 20080817114.228.48$6,931
Jul 20080540131.0811.39$6,150
Jun 20080589131.3313.03$7,676
May 200811579123.1711.57$8,056
Apr 20080611110.3110.45$6,388
Mar 20080612101.909.66$5,914
Feb 2008058392.538.77$5,113
Jan 2008075890.388.21$6,220
Dec 20071095588.337.30$7,857
Nov 2007063491.677.29$4,623
Oct 2007076882.856.92$5,316
Sep 2007064975.846.24$4,052
Aug 20071076969.066.39$5,603
Jul 2007092270.906.39$5,890
Jun 2007074562.007.55$5,624
May 2007075658.747.85$5,932
Apr 2007063759.617.81$4,972
Mar 20071562656.927.30$5,425
Feb 2007062755.108.22$5,151
Jan 2007089350.306.73$6,007
Dec 2006093656.656.92$6,476
Nov 20061569054.207.62$6,069
Oct 2006067254.906.01$4,041
Sep 2006064960.085.04$3,269
Aug 2006076068.717.34$5,578
Jul 20061471469.376.34$5,500
Jun 2006079466.286.38$5,069
May 2006090766.016.42$5,827
Apr 20061898864.397.36$8,431
Mar 2006097956.707.08$6,934
Feb 200601,05957.597.75$8,208
Jan 2006161,15560.598.93$11,287
Dec 200501,39454.9413.42$18,701
Nov 200501,56854.6910.59$16,603
Oct 200502,06758.3413.80$28,516
Sep 2005037861.4512.08$4,566

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                  127 Mcf  × $  2.87 =       $364

────────────────────────────────────────────────────
Month total                                     $364

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well