EAST BLOCK 31 ATOKA UNIT

Operated by FORMENTERA OPERATIONS LLC (P-5 276959) in the BLOCK 31, EAST (ATOKA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217487District 08Field 09359250Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$1.4 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 25 wells, and the rule below applies to all of them.

Discovered
1965-12-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1966-01-21.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: EFFECTIVE 6-27-84 PER DOCKET 8-57526

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition909 bbl$68,112
GasProduction220,560 Mcf$1,356,349
Total$1,424,461

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4639, -102.4310. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.46393, -102.43105 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,080 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,080 ft.

Completions filed
Oct 2004
1 of 1 wells

1 well

42-10332768A 6S9,080 ftOct 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 201903952.782.49$97
May 201903758.482.74$101
Apr 201907662.632.75$209
Mar 2019014256.803.06$435
Feb 201901,09050.852.79$3,044
Jan 201902,04346.033.23$6,595
Dec 201802,10346.594.19$8,802
Nov 201801,97752.934.24$8,377
Oct 201801,91161.443.40$6,494
Sep 201801,84659.543.11$5,737
Aug 201801,98859.403.07$6,096
Jul 201801,77265.142.93$5,195
Jun 201801,47560.183.08$4,538
May 201801,19265.382.90$3,458
Apr 201801,20063.842.90$3,481
Mar 201801,28761.222.79$3,587
Feb 201801,28461.782.77$3,552
Jan 201801,55462.874.01$6,230
Dec 201701,37257.272.92$4,008
Nov 201701,63655.423.12$5,102
Oct 201701,64549.292.98$4,908
Sep 201701,61747.523.09$4,992
Aug 201701,55145.373.00$4,660
Jul 201701,68143.873.09$5,190
Jun 201701,75642.493.09$5,421
May 2017044845.373.26$1,462
Apr 2017037347.933.21$1,198
Mar 2017036646.772.98$1,092
Feb 2017035950.452.95$1,060
Jan 2017030449.413.42$1,039
Dec 2016033348.763.72$1,240
Nov 201607042.492.64$185
Oct 201613446.193.09$151
Sep 20162341.553.10$92
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 2016231226.472.06$697
Jan 20161133327.352.36$1,088
Dec 20151537332.362.00$1,232
Nov 2015939338.792.17$1,201
Oct 2015337943.552.43$1,050
Sep 201507342.992.76$201
Aug 20150240.162.87$6
Jul 20150248.152.95$6
Jun 201501156.152.88$32
May 201501955.212.96$56
Apr 20150149.822.71$3
Mar 20150742.892.93$21
Feb 201501744.662.98$51
Jan 201503043.433.10$93
Dec 201403054.693.59$108
Nov 201403070.464.25$128
Oct 201403078.303.90$117
Sep 201402986.164.05$117
Aug 201405089.394.04$202
Jul 2014045696.564.18$1,906
Jun 2014050498.164.74$2,387
May 2014051794.734.73$2,444
Apr 2014050095.944.81$2,405
Mar 2014056195.895.06$2,837
Feb 2014049597.406.19$3,065
Jan 2014055090.404.86$2,673
Dec 2013053391.824.35$2,321
Nov 2013047188.853.74$1,761
Oct 2013049997.423.78$1,886
Sep 20130457104.113.72$1,699
Aug 20130489104.253.52$1,723
Jul 20130470102.523.72$1,747
Jun 2013044794.403.93$1,758
May 2013051194.834.15$2,120
Apr 2013049493.964.28$2,116
Mar 2013046393.623.91$1,812
Feb 2013040791.233.42$1,392
Jan 2013045391.603.42$1,549
Dec 2012055286.773.42$1,888
Nov 2012046086.953.62$1,667
Oct 2012054889.383.40$1,863
Sep 2012049094.672.92$1,430
Aug 2012429092.662.91$1,214
Jul 20122615385.133.02$2,676
Jun 20123326879.822.52$3,309
May 20123152491.612.49$4,144
Apr 201231555101.652.00$4,259
Mar 201226621105.052.22$4,111
Feb 201224662101.102.57$4,128
Jan 20122867298.092.73$4,584
Dec 20112963896.873.24$4,876
Nov 20112157095.723.31$3,898
Oct 20113056184.983.65$4,596
Sep 20112565283.623.99$4,689
Aug 20113574183.404.15$5,994
Jul 20112468894.144.52$5,367
Jun 2011846992.904.64$2,919
May 20111778098.134.40$5,104
Apr 201123836105.964.33$6,060
Mar 2011262996.364.06$2,623
Feb 2011025885.644.18$1,078
Jan 2011014686.504.59$670
Dec 201007385.734.35$317
Nov 20100080.843.80$0
Oct 2010019278.103.51$674
Sep 2010018772.633.98$744
Aug 2010019273.684.42$849
Jul 2010019772.554.74$933
Jun 2010018870.364.91$923
May 2010019771.124.24$834
Apr 2010018981.694.12$779
Mar 2010015978.394.39$698
Feb 2010036173.585.44$1,965
Jan 2010010774.365.96$638
Dec 200909871.445.48$537
Nov 20091417674.593.75$1,705
Oct 20091371572.544.11$3,882
Sep 2009068265.543.06$2,090
Aug 200901,07367.423.22$3,453
Jul 200901,01561.133.46$3,516
Jun 2009081166.163.90$3,159
May 2009081154.743.93$3,184
Apr 200901,05346.773.59$3,778
Mar 200901,03142.144.06$4,185
Feb 200901,00432.814.63$4,652
Jan 200901,08135.865.37$5,806
Dec 200802,07837.105.98$12,421
Nov 200802,43355.496.86$16,691
Oct 200802,75875.246.92$19,091
Sep 200802,231101.767.88$17,574
Aug 200802,784114.228.48$23,617
Jul 200802,304131.0811.39$26,241
Jun 200822,582131.3313.03$33,913
May 200832,742123.1711.57$32,106
Apr 200822,620110.3110.45$27,612
Mar 200822,601101.909.66$25,340
Feb 200822,95792.538.77$26,120
Jan 200803,79890.388.21$31,165
Dec 200704,33088.337.30$31,618
Nov 200703,87291.677.29$28,233
Oct 200702,04082.856.92$14,121
Sep 200702,21175.846.24$13,806
Aug 2007154,82769.066.39$31,870
Jul 2007164,45370.906.39$29,580
Jun 2007148,76062.007.55$66,992
May 2007153,88458.747.85$31,356
Apr 2007127,16259.617.81$56,616
Mar 2007129,49556.927.30$70,015
Feb 2007137,32355.108.22$60,882
Jan 20076311,79650.306.73$82,519
Dec 20063711,29156.656.92$80,212
Nov 2006406,62454.207.62$52,626
Oct 2006467,44354.906.01$47,286
Sep 2006927,02360.085.04$40,904
Aug 200614,99668.717.34$36,739
Jul 20064669.376.34$316
Jun 200679,41966.286.38$60,594

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 52.78 =         $0
Gas                   39 Mcf  × $  2.49 =        $97

────────────────────────────────────────────────────
Month total                                      $97

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/217487 is the state's own key, not one this site invented.