KIMBELL 34-194 UNIT

Operated by ANADARKO E&P ONSHORE LLC (P-5 20528) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 279401District 08Field 71052900Hydrogen sulphide field2 tax incentive programmesCondensateGasSaveExport
Value, all time
$8.1 M
Mar 2015 – May 2026
Value, last 12 filed months
$166 k
at the published price for each month
Months reported
133
2 months not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112017-03-01219732
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition113,527 bbl$6,167,161
GasProduction605,195 Mcf$1,912,063
Total$8,079,224

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5518, -103.3484. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.55176, -103.34840 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,236 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,236 ft.

Completions filed
Jul 2015
1 of 1 wells

1 well

42-475368786H11,236 ftJul 2015

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (133)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

133 months

May 202613162106.413.05$14,129
Apr 202621035198.932.87$21,783
Mar 202623470289.753.15$23,212
Feb 20262391,09263.503.75$19,272
Jan 202619045559.138.00$14,874
Dec 202519651356.664.41$13,369
Nov 202521352458.593.93$14,537
Oct 202516323759.383.30$10,462
Sep 202513446062.743.08$9,823
Aug 202510850563.933.01$8,427
Jul 202578066.743.32$5,206
Jun 20251051,25366.483.13$10,901
May 20251241,10960.553.23$11,093
Apr 20251231,05662.363.54$11,412
Mar 20252301,56767.704.27$22,259
Feb 20252031,00270.884.34$18,738
Jan 202530754174.324.28$25,131
Dec 202439269068.993.12$29,198
Nov 20243641,38269.052.20$28,172
Oct 202411729471.372.28$9,021
Sep 2024178069.612.36$12,391
Aug 20241721,20475.632.06$15,493
Jul 20241681,86179.932.15$17,423
Jun 20241211,39178.082.63$13,112
May 20241801,68878.812.20$17,897
Apr 20241811,68384.451.66$18,078
Mar 20242511,25980.301.55$22,101
Feb 202426698376.091.78$21,993
Jan 20243341,05073.023.30$27,851
Dec 202332872771.262.61$25,271
Nov 202336794277.892.81$31,230
Oct 20233801,35285.443.09$36,641
Sep 20232601,88489.042.74$28,303
Aug 20231681,19880.522.67$16,729
Jul 20232051,70074.852.64$19,835
Jun 2023102068.962.26$7,034
May 202318890970.622.23$15,301
Apr 202316653678.122.24$14,167
Mar 20232151,00172.852.39$18,058
Feb 20233031,46375.112.47$26,366
Jan 20233461,84576.533.39$32,730
Dec 20225463,06576.415.73$59,279
Nov 20225582,98985.005.65$64,306
Oct 20225772,62187.185.86$65,672
Sep 20225403,41184.888.16$73,682
Aug 20226293,89894.529.13$95,031
Jul 20225523,553101.587.54$82,869
Jun 20225053,430115.097.98$85,482
May 20225433,408109.378.43$88,128
Apr 20226293,637104.226.84$90,423
Mar 20226433,706108.885.08$88,823
Feb 20226193,01791.054.86$71,019
Jan 20227003,84181.844.54$74,717
Dec 20217064,02171.323.90$66,030
Nov 20217154,12877.435.24$76,980
Oct 20217214,00979.795.71$80,435
Sep 20217153,62469.865.35$69,342
Aug 20217234,24466.024.22$65,645
Jul 20217404,41170.783.98$69,942
Jun 20217064,62869.493.38$64,705
May 20217345,09763.483.02$61,975
Apr 20217404,96260.362.76$58,354
Mar 20217984,90961.302.72$62,255
Feb 20215172,99057.805.55$46,471
Jan 20216793,68250.412.81$44,576
Dec 20207004,11344.642.68$42,252
Nov 20208134,51838.772.71$43,748
Oct 20207435,16036.972.48$40,257
Sep 20208294,32337.091.99$39,355
Aug 20209004,63339.982.39$47,032
Jul 20206973,39538.371.83$32,940
Jun 20206622,57234.901.69$27,451
May 202019339716.921.81$3,986
Apr 202034497114.751.80$6,826
Mar 20209674,19130.341.86$37,118
Feb 20207753,25749.881.98$45,108
Jan 20208393,75557.252.09$55,899
Dec 20198433,56159.012.30$57,951
Nov 20198543,54655.302.75$56,980
Oct 20199413,73153.472.42$59,339
Sep 20198854,16955.052.66$59,797
Aug 20198502,68653.112.30$51,333
Jul 20199073,96856.272.46$60,798
Jun 20198573,44052.782.49$53,802
May 20199454,15258.482.74$66,641
Apr 20199613,74062.632.75$70,475
Mar 20199833,58156.803.06$66,800
Feb 20191,1493,88650.852.79$69,277
Jan 20191,3195,32146.033.23$77,891
Dec 20181,1814,65146.594.19$74,489
Nov 20181,0945,28352.934.24$80,291
Oct 20181,1865,90761.443.40$92,940
Sep 20181,1673,28959.543.11$79,705
Aug 20181,0564,93959.403.07$77,872
Jul 20181,0684,46965.142.93$82,672
Jun 20181,1506,04460.183.08$87,804
May 20181,1566,34465.382.90$93,982
Apr 20181,2426,30563.842.90$97,579
Mar 20181,4167,42661.222.79$107,383
Feb 20181,3327,00561.782.77$101,668
Jan 20181,2475,86162.874.01$101,898
Dec 20171,1565,87857.272.92$83,377
Nov 20171,6617,44955.423.12$115,281
Oct 20171,6613,22449.292.98$91,490
Sep 20171,2805,67447.523.09$78,343
Aug 20171,7788,83645.373.00$107,215
Jul 20171,5527,00943.873.09$89,725
Jun 20171,2426,89142.493.09$74,047
May 20171,8038,69145.373.26$110,164
Apr 20171,9569,31947.933.21$123,680
Mar 20172,0949,73846.772.98$126,991
Feb 20172,16110,15950.452.95$139,018
Jan 20172,18810,24849.413.42$143,145
Dec 20162,21110,20548.763.72$145,800
Nov 20162,53412,23742.492.64$140,029
Oct 20162,94914,28546.193.09$180,359
Sep 20162,1659,61741.553.10$119,775
Aug 20161,9369,09341.442.92$106,819
Jul 20161,0393,84141.622.92$54,476
Jun 20161,3805,45945.352.69$77,245
May 20161,3455,03542.521.99$67,214
Apr 20161,3545,20436.561.99$59,864
Mar 20163369,72333.011.79$28,535
Feb 201667910,79726.472.06$40,254
Jan 201667811,74127.352.36$46,303
Dec 20155989,27832.362.00$37,920
Nov 20151,55512,87438.792.17$88,221
Oct 20151,66315,42743.552.43$109,859
Sep 20151,89820,71442.992.76$138,733
Aug 20153,88927,14140.162.87$234,144
Jul 20156,26035,06748.152.95$404,694
Apr 20150049.822.71$0
Mar 20150042.892.93$0

Not filed, and not zero: May 2015 – Jun 2015 (2 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate           131 bbl  × $106.41 =    $13,940
Gas                   62 Mcf  × $  3.05 =       $189

────────────────────────────────────────────────────
Month total                                  $14,129

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/279401 is the state's own key, not one this site invented.