KICKAPOO

Operated by APACHE CORPORATION (P-5 27200) in the ALPINE HIGH (CONS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 286741District 08Field 01942500CondensateGasSaveExport
Value, all time
$9.8 M
Jul 2018 – May 2026
Value, last 12 filed months
$421 k
at the published price for each month
Months reported
95
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 258 leases and 258 wells, and the rule below applies to all of them.

Discovered
2016-06-07
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2019-06-04.

The Commission's schedule remark for this field reads: REQUIREMENTS OF COMMISSION PROCEDURES.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition38,007 bbl$2,236,299
GasProduction2,125,760 Mcf$7,581,685
Total$9,817,984

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.1846, -103.8038. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.18462, -103.80377 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,004 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,004 ft.

Completions filed
Jul 2018
1 of 1 wells

1 well

42-38936974201AH9,004 ftJul 2018

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (95)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

95 months

May 202600106.413.05$0
Apr 202601,50898.932.87$4,328
Mar 202603,29589.753.15$10,377
Feb 20261068,14263.503.75$37,266
Jan 2026013,68959.138.00$109,484
Dec 2025020,11656.664.41$88,779
Nov 20252638458.593.93$3,031
Oct 202505,30159.383.30$17,519
Sep 202507,78162.743.08$23,942
Aug 20253112,77063.933.01$40,480
Jul 2025013,45866.743.32$44,616
Jun 2025013,17166.483.13$41,208
May 20255114,34860.553.23$49,465
Apr 20257320,30362.363.54$76,488
Mar 202517929,42167.704.27$137,697
Feb 2025027,97370.884.34$121,426
Jan 202516832,47974.324.28$151,453
Dec 202419324,25468.993.12$89,021
Nov 20241583,90569.052.20$19,495
Oct 20249223,27771.372.28$59,670
Sep 2024016,07069.612.36$37,995
Aug 202407,04975.632.06$14,547
Jul 20247116,37279.932.15$40,819
Jun 2024012,29878.082.63$32,393
May 202410311,49878.812.20$33,395
Apr 20241274,74684.451.66$18,600
Mar 202416432,13980.301.55$62,828
Feb 202415432,94276.091.78$70,475
Jan 202413125,15373.023.30$92,512
Dec 202313829,84071.262.61$87,738
Nov 202315733,45977.892.81$106,167
Oct 202317121,12585.443.09$79,829
Sep 2023019,51489.042.74$53,372
Aug 202336521,89280.522.67$87,904
Jul 202314522,24974.852.64$69,631
Jun 20237521,12668.962.26$52,885
May 202315521,38670.622.23$58,581
Apr 202313822,57278.122.24$61,291
Mar 202335021,76172.852.39$77,575
Feb 2023021,16475.112.47$52,184
Jan 202312925,42676.533.39$96,009
Dec 202232431,63576.415.73$205,996
Nov 202256133,58185.005.65$237,290
Oct 202212731,74487.185.86$197,211
Sep 202220428,28884.888.16$248,250
Aug 202212833,49794.529.13$317,831
Jul 202226125,400101.587.54$218,081
Jun 202219326,698115.097.98$235,188
May 202226228,004109.378.43$264,814
Apr 202212526,652104.226.84$195,263
Mar 202249722,042108.885.08$166,007
Feb 202212921,27191.054.86$115,098
Jan 202239717,65181.844.54$112,585
Dec 202128222,05971.323.90$106,123
Nov 202125123,33077.435.24$141,611
Oct 202133920,11479.795.71$141,978
Sep 202165619,80569.865.35$151,803
Aug 202140021,00566.024.22$115,061
Jul 202113620,89170.783.98$92,816
Jun 202133622,41569.493.38$99,125
May 202127314,30763.483.02$60,504
Apr 202146715,13360.362.76$69,931
Mar 20214349,07361.302.72$51,255
Feb 202126818,19457.805.55$116,430
Jan 202155324,52250.412.81$96,790
Dec 202040723,19644.642.68$80,228
Nov 202039623,54538.772.71$79,079
Oct 202051421,26036.972.48$71,694
Sep 202060824,04137.091.99$70,417
Aug 202064226,47439.982.39$88,810
Jul 202039626,39338.371.83$63,365
Jun 202059424,82134.901.69$62,686
May 202063617,05116.921.81$41,704
Apr 202040826,21114.751.80$53,313
Mar 202051628,68130.341.86$68,894
Feb 202063528,92749.881.98$88,969
Jan 202078131,80957.252.09$111,344
Dec 201954533,50859.012.30$109,375
Nov 201931725,45355.302.75$87,544
Oct 201970731,80653.472.42$114,727
Sep 201966829,27155.052.66$114,555
Aug 20191,19633,52253.112.30$140,766
Jul 20191,35928,81956.272.46$147,367
Jun 20191,28433,07652.782.49$150,168
May 20191,23445,87858.482.74$197,885
Apr 201962226,64062.632.75$112,235
Mar 201964211,34756.803.06$71,211
Feb 20191,15328,40050.852.79$137,929
Jan 20191,02329,42346.033.23$142,071
Dec 20181,00434,03146.594.19$189,211
Nov 20181,38743,02352.934.24$255,713
Oct 20181,91239,63761.443.40$252,163
Sep 20183,07147,79659.543.11$331,397
Aug 20182,09728,99259.403.07$213,468
Jul 201806265.142.93$182

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $ 98.93 =         $0
Gas                1,508 Mcf  × $  2.87 =     $4,328

────────────────────────────────────────────────────
Month total                                   $4,328

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/286741 is the state's own key, not one this site invented.