DR STATE WISE UNIT 1

Operated by CHEVRON U. S. A. INC. (P-5 148113) in the FORD, WEST (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 287971District 08Field 31913800Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$32.7 M
Jun 2019 – May 2026
Value, last 12 filed months
$2.2 M
at the published price for each month
Months reported
84
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,466 leases and 1,484 wells, and the rule below applies to all of them.

Discovered
2010-11-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-06-05.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: DOCKET SAYS PRO PLAT NOT REQUIRED NOT LEASE PLAT NOT REQ

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition356,288 bbl$20,646,191
GasProduction3,242,364 Mcf$12,090,820
Total$32,737,011

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9998, -104.3038. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,378 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,378 ft.

Completions filed
Apr 2020
1 of 1 wells

1 well

42-109334530103WA8,378 ftApr 2020

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (84)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

84 months

May 202692619,847106.413.05$158,986
Apr 202696814,98198.932.87$138,756
Mar 20261,10736,07489.753.15$212,966
Feb 20261,22517,07663.503.75$141,828
Jan 20261,26724,83959.138.00$273,578
Dec 20251,09224,34756.664.41$169,325
Nov 20251,12824,02658.593.93$160,426
Oct 20251,49830,09759.383.30$188,417
Sep 20251,43924,25962.743.08$164,926
Aug 20251,71226,41763.933.01$189,089
Jul 20251,67622,02466.743.32$184,870
Jun 20251,50926,75066.483.13$184,012
May 20252,81737,91560.553.23$293,123
Apr 202551811,19162.363.54$71,954
Mar 20251,92141,63567.704.27$307,763
Feb 20251,86731,12870.884.34$267,455
Jan 20251,67128,68874.324.28$246,935
Dec 20242,14230,04568.993.12$241,558
Nov 20241,43126,17269.052.20$156,348
Oct 20242,13832,52271.372.28$226,785
Sep 20242,96732,35069.612.36$283,020
Aug 20241,55616,95275.632.06$152,663
Jul 20241,0129,22179.932.15$100,683
Jun 20241,53421,05878.082.63$175,241
May 20241,56524,52878.812.20$177,261
Apr 20241,58324,93984.451.66$175,063
Mar 20242,00826,88980.301.55$202,789
Feb 20242,14327,57676.091.78$212,247
Jan 20242,22028,47573.023.30$256,005
Dec 20232,38825,31571.262.61$236,259
Nov 20231,98420,48277.892.81$212,038
Oct 20232,40328,85785.443.09$294,402
Sep 20232,51029,39089.042.74$303,873
Aug 20232,71829,75380.522.67$298,380
Jul 20232,94846,84974.852.64$344,423
Jun 20233,21947,30168.962.26$328,811
May 20232,89245,56470.622.23$305,722
Apr 20233,01247,55378.122.24$341,710
Mar 20232,68442,63572.852.39$297,562
Feb 20232,88838,18275.112.47$311,062
Jan 20232,85646,39676.533.39$375,746
Dec 20223,75452,97376.415.73$590,330
Nov 20223,45348,53085.005.65$567,515
Oct 20223,97661,20887.185.86$705,537
Sep 20223,28439,81484.888.16$603,775
Aug 20223,61449,16194.529.13$790,296
Jul 20223,61450,609101.587.54$748,807
Jun 20223,96751,615115.097.98$868,305
May 20224,47953,494109.378.43$940,985
Apr 20224,63357,416104.226.84$875,439
Mar 20225,06158,954108.885.08$850,316
Feb 20225,05057,38191.054.86$738,608
Jan 20225,62760,99181.844.54$737,271
Dec 20215,97165,59371.323.90$681,607
Nov 20216,22663,05777.435.24$812,299
Oct 20217,84668,27079.795.71$1,016,118
Sep 20214,50347,97569.865.35$571,290
Aug 20219,32765,70666.024.22$893,087
Jul 20219,00854,80070.783.98$855,804
Jun 202110,14755,46569.493.38$892,621
May 20212,3619,64363.483.02$178,976
Apr 20211871360.362.76$3,053
Mar 2021449,98461.302.72$29,823
Feb 20216,68266,85257.805.55$757,111
Jan 202111,88498,12750.412.81$874,836
Dec 202013,06192,59844.642.68$830,785
Nov 20208,51754,56138.772.71$477,877
Oct 202014,20999,44436.972.48$771,772
Sep 202015,89099,93037.091.99$788,325
Aug 202020,249110,14239.982.39$1,072,255
Jul 202023,466117,78638.371.83$1,115,364
Jun 202021,359100,78534.901.69$915,787
May 202025,43688,24416.921.81$590,518
Apr 202010,43040,24514.751.80$226,460
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate           926 bbl  × $106.41 =    $98,536
Gas               19,847 Mcf  × $  3.05 =    $60,451

────────────────────────────────────────────────────
Month total                                 $158,986

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/287971 is the state's own key, not one this site invented.