STATE AL OLSON 57-T2-6X43 J

Operated by BPX OPERATING COMPANY (P-5 85408) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293206District 08Field 71052900Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$35.9 M
Oct 2021 – May 2026
Value, last 12 filed months
$2.9 M
at the published price for each month
Months reported
55
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition294,240 bbl$25,636,647
GasProduction2,353,633 Mcf$10,245,991
Total$35,882,638

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8905, -104.0004. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,545 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,545 ft.

Completions filed
May 2022
1 of 1 wells

1 well

42-38939532W110H9,545 ftMay 2022

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (55)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

55 months

May 20261,16032,111106.413.05$221,241
Apr 20261,09227,77298.932.87$187,729
Mar 20261,65336,28789.753.15$262,640
Feb 20261,63831,39463.503.75$221,751
Jan 20261,85535,62659.138.00$394,620
Dec 20251,81834,81256.664.41$256,646
Nov 20252,13636,66958.593.93$269,127
Oct 20252,42236,68559.383.30$265,056
Sep 20252,51732,10862.743.08$256,710
Aug 20252,78130,35363.933.01$269,296
Jul 20251,66918,85066.743.32$173,881
Jun 202588812,58866.483.13$98,419
May 20252,49626,05860.553.23$235,361
Apr 20252,25522,23762.363.54$219,410
Mar 20252,40623,10467.704.27$261,501
Feb 20252,38022,69770.884.34$267,218
Jan 20252,15923,13374.324.28$259,436
Dec 20242,18623,97468.993.12$225,644
Nov 20242,79227,09469.052.20$252,352
Oct 20242,87527,52971.372.28$267,993
Sep 20242,78426,77369.612.36$257,095
Aug 20244929,10075.632.06$63,758
Jul 20242,99226,88779.932.15$296,866
Jun 20243,06225,87578.082.63$307,235
May 20246,70666,14478.812.20$673,913
Apr 20242,42175,11684.451.66$329,086
Mar 20244,70256,74680.301.55$465,251
Feb 20244,80449,55076.091.78$453,916
Jan 20244,18238,81473.023.30$433,365
Dec 20233,25536,19771.262.61$326,452
Nov 20233,14932,28377.892.81$335,912
Oct 20233,24335,67185.443.09$387,208
Sep 20234,10746,77489.042.74$493,616
Aug 20235,90058,32380.522.67$630,958
Jul 20234,89450,29174.852.64$499,175
Jun 20236,30759,65468.962.26$569,658
May 20237,77866,49370.622.23$697,389
Apr 20237,91150,73678.122.24$731,542
Mar 20234,78040,99672.852.39$446,333
Feb 20238,48164,78975.112.47$796,757
Jan 202312,74181,83676.533.39$1,252,306
Dec 202210,86562,54076.415.73$1,188,491
Nov 20225,34981,89085.005.65$917,032
Oct 202212,781136,91087.185.86$1,917,055
Sep 202223,710150,21584.888.16$3,238,812
Aug 202219,01774,44694.529.13$2,476,967
Jul 20222,599113101.587.54$264,859
Jun 202240,380148,263115.097.98$5,830,058
May 202234,113119,127109.378.43$4,735,542
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate         1,160 bbl  × $106.41 =   $123,436
Gas               32,111 Mcf  × $  3.05 =    $97,805

────────────────────────────────────────────────────
Month total                                 $221,241

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/293206 is the state's own key, not one this site invented.