EAST SHAMMO

Operated by MATADOR PRODUCTION COMPANY (P-5 532993) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293700District 08Field 71052900Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$35.4 M
Dec 2020 – May 2026
Value, last 12 filed months
$4.5 M
at the published price for each month
Months reported
56
10 months not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition339,811 bbl$27,791,162
GasProduction1,710,121 Mcf$7,580,716
Total$35,371,878

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9969, -103.3232. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.99692, -103.32319 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,621 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,621 ft.

Completions filed
Oct 2021
1 of 1 wells

1 well

42-495343183H12,621 ftOct 2021

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (56)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

56 months

May 20263,46816,336106.413.05$418,787
Apr 20263,02615,41698.932.87$343,602
Mar 20263,21018,26589.753.15$345,622
Feb 20263,84916,41963.503.75$305,988
Jan 20263,67521,90159.138.00$392,465
Dec 20254,48026,28856.664.41$369,855
Nov 20254,01920,10958.593.93$314,430
Oct 20254,52524,96459.383.30$351,197
Sep 20254,33528,16262.743.08$358,630
Aug 20254,30623,80363.933.01$347,043
Jul 20255,16326,84966.743.32$433,588
Jun 20254,61459,02466.483.13$491,408
May 20252,96729,52460.553.23$275,083
Apr 20253,73615,11362.363.54$286,524
Mar 20255,57020,29267.704.27$463,702
Feb 20253,68914,51770.884.34$324,492
Jan 20256,33729,13974.324.28$595,642
Dec 20243,84526,84568.993.12$349,060
Nov 20243,95638,64069.052.20$358,110
Oct 20244,64433,91871.372.28$408,823
Sep 20244,58035,79969.612.36$403,456
Aug 20245,25027,48575.632.06$453,776
Jul 20244,31418,13279.932.15$383,740
Jun 20244,67617,02178.082.63$409,935
May 20243,19010,95778.812.20$275,492
Apr 20242,5988,58584.451.66$233,645
Mar 20242,1737,36580.301.55$185,872
Feb 20241,1013,44376.091.78$89,916
Jan 20243591,72173.023.30$31,889
Dec 20236424971.262.61$5,211
Nov 20234,12616,02077.892.81$366,351
Oct 20234,66122,65385.443.09$468,172
Sep 20234,79828,30589.042.74$504,629
Aug 20235,52730,43080.522.67$526,370
Jul 20235,90533,09074.852.64$529,406
Jun 20235,48232,44868.962.26$451,322
May 20236,95543,58370.622.23$588,239
Apr 20237,23942,35878.122.24$660,298
Mar 20237,54746,78672.852.39$661,765
Feb 20237,03738,05275.112.47$622,373
Jan 20237,96742,81276.533.39$754,750
Dec 20228,83145,94376.415.73$937,988
Nov 20228,30148,45585.005.65$979,172
Oct 20229,10548,18887.185.86$1,076,337
Sep 202210,05655,15884.888.16$1,303,846
Aug 20229,25658,25094.529.13$1,406,534
Jul 202210,32953,151101.587.54$1,450,089
Jun 20229,40448,603115.097.98$1,470,022
May 202212,88758,746109.378.43$1,904,859
Apr 202213,54065,065104.226.84$1,856,027
Mar 202213,98453,874108.885.08$1,796,064
Feb 202214,26852,40791.054.86$1,553,739
Dec 202126,62563,05571.323.90$2,144,754
Nov 202113,19342,36477.435.24$1,243,388
Oct 20211,0694,04479.795.71$108,402
Dec 20200044.642.68$0

Not filed, and not zero: Jan 2021 – Sep 2021 (9 months) · Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate         3,468 bbl  × $106.41 =   $369,030
Gas               16,336 Mcf  × $  3.05 =    $49,757

────────────────────────────────────────────────────
Month total                                 $418,787

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/293700 is the state's own key, not one this site invented.