KUDU A

Operated by MATADOR PRODUCTION COMPANY (P-5 532993) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 293913District 08Field 71052900Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$18.2 M
Feb 2021 – May 2026
Value, last 12 filed months
$2.7 M
at the published price for each month
Months reported
63
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition195,243 bbl$15,422,153
GasProduction664,932 Mcf$2,791,629
Total$18,213,782

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9533, -103.3172. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.95334, -103.31718 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,773 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,773 ft.

Completions filed
Oct 2019
1 of 1 wells

1 well

42-495342702 H12,773 ftOct 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (63)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

63 months

May 20262,62110,968106.413.05$312,307
Apr 20262,69314,32498.932.87$307,524
Mar 20262,70512,39389.753.15$281,805
Feb 20262,98210,52563.503.75$228,829
Jan 20262,56812,50659.138.00$251,868
Dec 20253,24317,49556.664.41$260,960
Nov 20252,97312,57658.593.93$223,567
Oct 20252,8862,10959.383.30$178,341
Sep 20252,3593,26862.743.08$158,059
Aug 20252,6492,71863.933.01$177,545
Jul 20252,3492,17066.743.32$163,966
Jun 20252,3791,59866.483.13$163,156
May 20252,8016,33860.553.23$190,087
Apr 20252,37969162.363.54$150,803
Mar 20252,9292,30267.704.27$208,119
Feb 20252,3315,98670.884.34$191,206
Jan 20253,35211,53074.324.28$298,454
Dec 20242,59111,77768.993.12$215,513
Nov 20243,23317,51769.052.20$261,749
Oct 20243,73314,78871.372.28$300,162
Sep 20244,11218,12469.612.36$329,088
Aug 20244,71616,99775.632.06$391,747
Jul 20244,71520,07079.932.15$419,952
Jun 20243,61516,48278.082.63$325,672
May 20243,5499,90478.812.20$301,470
Apr 20243,0766,79284.451.66$271,037
Mar 20242,8356,40180.301.55$237,541
Feb 20242,4067,46576.091.78$196,387
Jan 20241148673.023.30$8,608
Dec 20233611971.262.61$2,876
Nov 20232,8435,90577.892.81$238,020
Oct 20233,4665,87285.443.09$314,264
Sep 20234,4097,17989.042.74$412,212
Aug 20235,9829,82380.522.67$507,926
Jul 20236,27211,67874.852.64$500,310
Jun 20235,21613,01268.962.26$389,083
May 20234,35719,11970.622.23$350,277
Apr 20234,63418,59378.122.24$403,615
Mar 20234,79019,13472.852.39$394,742
Feb 20233,67913,98575.112.47$310,812
Jan 20234,55817,80776.533.39$409,149
Dec 20223,63712,68776.415.73$350,588
Nov 20224,03914,86985.005.65$427,268
Oct 20224,52716,30987.185.86$490,296
Sep 20225,34821,74884.888.16$631,482
Aug 20224,82417,44194.529.13$615,151
Jul 20222,94318,314101.587.54$437,076
Jun 20224,01613,176115.097.98$567,309
May 20224,43616,852109.378.43$627,279
Apr 20224,51117,984104.226.84$593,104
Mar 20222,59018,924108.885.08$378,065
Feb 20223,12426,60691.054.86$413,715
Dec 20214,46722,15771.323.90$404,979
Nov 20212,4037,31277.435.24$224,356
Oct 20214,57110,94179.795.71$427,236
Sep 20214,67111,07569.865.35$385,578
Aug 2021019766.024.22$831
Jul 202105270.783.98$207
Jun 202101669.493.38$54
May 20210763.483.02$21
Apr 202107260.362.76$199
Mar 202106761.302.72$182
Feb 20210057.805.55$0

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate         2,621 bbl  × $106.41 =   $278,901
Gas               10,968 Mcf  × $  3.05 =    $33,407

────────────────────────────────────────────────────
Month total                                 $312,307

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/293913 is the state's own key, not one this site invented.