UL ROY E 18-4-13

Operated by APACHE CORPORATION (P-5 27200) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 294733District 08Field 71052900Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$41.3 M
Apr 2020 – May 2026
Value, last 12 filed months
$3.1 M
at the published price for each month
Months reported
73
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition474,942 bbl$38,027,634
GasProduction701,647 Mcf$3,288,635
Total$41,316,269

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5826, -103.2464. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.58257, -103.24638 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,287 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,287 ft.

Completions filed
Jun 2021
1 of 1 wells

1 well

42-475380695205H11,287 ftJun 2021

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (73)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

73 months

May 20262,418396106.413.05$258,506
Apr 2026195098.932.87$19,291
Mar 20261,4741,23489.753.15$136,178
Feb 20264,9945,12763.503.75$336,347
Jan 20265,9192,11059.138.00$366,866
Dec 20254,4744,56556.664.41$273,644
Nov 20253,8032,87558.593.93$234,106
Oct 20254,3654,88259.383.30$275,328
Sep 20252,4364,73862.743.08$167,413
Aug 20254,1674,37963.933.01$279,598
Jul 20255,1765,57266.743.32$363,919
Jun 20255,1143,00266.483.13$349,371
May 20255,8316,75760.553.23$374,908
Apr 20255,7586,10862.363.54$380,710
Mar 20254,7705,36867.704.27$345,841
Feb 20256,1157,80870.884.34$467,324
Jan 20257,1728,66474.324.28$570,094
Dec 20245,4626,68868.993.12$397,699
Nov 20244,0496,09569.052.20$292,983
Oct 20247,1149,18971.372.28$528,690
Sep 20246,8009,45969.612.36$495,712
Aug 20245,1157,91975.632.06$403,189
Jul 20243,8238,19079.932.15$323,153
Jun 20245,7359,97578.082.63$474,063
May 20245,7587,52278.812.20$470,325
Apr 20244,1096,73184.451.66$358,173
Mar 20246,2659,51080.301.55$517,774
Feb 20245,2627,87076.091.78$414,423
Jan 20245,8299,70973.023.30$457,651
Dec 20235,1878,84671.262.61$392,720
Nov 20232,0734,12577.892.81$173,047
Oct 20235,62510,34085.443.09$512,522
Sep 20237,09713,38889.042.74$668,534
Aug 20236,68210,75280.522.67$566,773
Jul 20237,32112,55774.852.64$581,150
Jun 20237,05911,56068.962.26$512,897
May 20237,33111,92770.622.23$544,281
Apr 20236,78910,18378.122.24$553,144
Mar 20237,4539,30772.852.39$565,224
Feb 20238,42210,25075.112.47$657,850
Jan 20239,94812,80276.533.39$804,690
Dec 20228,79115,99076.415.73$763,328
Nov 202210,62319,10885.005.65$1,010,843
Oct 202210,67722,25087.185.86$1,061,290
Sep 202211,39024,60984.888.16$1,167,683
Aug 202213,14523,10494.529.13$1,453,339
Jul 202213,14523,104101.587.54$1,509,521
Jun 202216,15530,077115.097.98$2,099,209
May 202215,09124,034109.378.43$1,853,182
Apr 202210,72915,557104.226.84$1,224,549
Mar 202217,04321,939108.885.08$1,967,013
Feb 202213,09617,52891.054.86$1,277,557
Dec 202114,47317,03571.323.90$1,098,636
Nov 202116,83918,98077.435.24$1,403,239
Oct 202119,14629,96879.795.71$1,698,893
Sep 202120,96532,67969.865.35$1,639,478
Aug 202122,49833,82266.024.22$1,628,067
Jul 202120,64733,38470.783.98$1,594,332
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate         2,418 bbl  × $106.41 =   $257,299
Gas                  396 Mcf  × $  3.05 =     $1,206

────────────────────────────────────────────────────
Month total                                 $258,506

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/294733 is the state's own key, not one this site invented.