Operated by PERUN ENERGY LLC (P-5 104430) in the PHANTOM (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 295124District 08Field 71052900Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$19.4 M
Apr 2021 – May 2026
Value, last 12 filed months
$1.4 M
at the published price for each month
Months reported
61
1 month not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7,755 leases and 10,539 wells, and the rule below applies to all of them.

Discovered
1983-06-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2017-08-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: FOR THE FOLLOWING API 389-37515.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition204,711 bbl$15,993,410
GasProduction804,815 Mcf$3,359,425
Total$19,352,835

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2845, -103.6568. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.28452, -103.65679 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,019 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,019 ft.

Completions filed
Apr 2021
1 of 1 wells

1 well

42-389377922H10,019 ftApr 2021

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (61)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

61 months

May 20269868,354106.413.05$130,365
Apr 20269878,63698.932.87$122,427
Mar 20261,02410,64789.753.15$125,436
Feb 20269438,91063.503.75$93,296
Jan 20261,0209,91059.138.00$139,572
Dec 20251,0559,33456.664.41$100,971
Nov 20251,1249,91458.593.93$104,782
Oct 20251,25710,76359.383.30$110,211
Sep 20251,30110,78562.743.08$114,809
Aug 20251,33510,95663.933.01$118,376
Jul 20251,1649,90766.743.32$110,529
Jun 20251,2029,95566.483.13$111,055
May 20251,25718,27360.553.23$135,176
Apr 20251,2498,34662.363.54$107,459
Mar 20251,3097,79667.704.27$121,895
Feb 20251,1046,03470.884.34$104,444
Jan 20251,3546,46874.324.28$128,304
Dec 20241,4157,27568.993.12$120,329
Nov 20241,0753,91069.052.20$82,825
Oct 202446155371.372.28$34,163
Sep 20247202,34869.612.36$55,671
Aug 20249384,99675.632.06$81,251
Jul 20241,70011,94379.932.15$161,518
Jun 20241,70314,03078.082.63$169,925
May 20242,05016,46378.812.20$197,753
Apr 20241,91310,20484.451.66$178,483
Mar 20242,14518,18780.301.55$200,345
Feb 20242,0736,55576.091.78$169,426
Jan 20242,23912,14573.023.30$203,542
Dec 20232,37512,60771.262.61$202,156
Nov 20232,35210,84777.892.81$213,651
Oct 20232,4649,02285.443.09$238,378
Sep 20232,3858,70189.042.74$236,158
Aug 20232,68510,19980.522.67$243,457
Jul 20232,8589,95474.852.64$240,218
Jun 20232,94011,31868.962.26$228,304
May 20233,14210,94670.622.23$246,269
Apr 20233,0788,50278.122.24$259,479
Mar 20233,2019,23272.852.39$255,287
Feb 20233,06210,33275.112.47$255,462
Jan 20233,51010,81576.533.39$305,258
Dec 20223,93612,79676.415.73$374,059
Nov 20223,4889,92285.005.65$352,502
Oct 20223,87311,98887.185.86$407,943
Sep 20224,09614,27484.888.16$464,197
Aug 20223,96816,00294.529.13$521,108
Jul 20224,8856,266101.587.54$543,477
Jun 20224,98013,967115.097.98$684,566
May 20224,48913,001109.378.43$600,600
Apr 20224,42818,197104.226.84$585,910
Mar 20225,54816,953108.885.08$690,126
Feb 20224,16225,27191.054.86$501,738
Dec 20216,07127,41871.323.90$539,890
Nov 20216,51329,78677.435.24$660,286
Oct 20217,96532,85879.795.71$823,274
Sep 20219,65135,73269.865.35$865,418
Aug 202112,80139,72666.024.22$1,012,789
Jul 202114,93336,18070.783.98$1,201,029
Jun 202118,11733,72769.493.38$1,372,969
May 20218,36914,29063.483.02$574,387
Apr 202128338960.362.76$18,155

Not filed, and not zero: Jan 2022. The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate           986 bbl  × $106.41 =   $104,920
Gas                8,354 Mcf  × $  3.05 =    $25,445

────────────────────────────────────────────────────
Month total                                 $130,365

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/295124 is the state's own key, not one this site invented.