GRAYBURG GAS UNIT X

Operated by FASKEN OIL AND RANCH, LTD. (P-5 263696) in the GOLDSMITH, EAST (GRAYBURG) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 34578District 08Field 35653444Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$788 k
Jan 1993 – Sep 2005
Value, last 12 filed months
$0
at the published price for each month
Months reported
153
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 46 leases and 46 wells, and the rule below applies to all of them.

Discovered
not filed
Field class
Oil and gas
the register's own label
Between wells
1,800 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 320 acres. The field rule took effect on 1964-12-16.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition30 bbl$384
GasProduction474,980 Mcf$788,044
Total$788,428

227,626 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0082, -102.5689. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.00825, -102.56894 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,600 ft
1 wells filed one
Completion to plug
40.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,600 ft.

Completions filed
Oct 1964
1 of 1 wells
Plug dates filed
Sep 2005
1 of 1 wells

Last completion to plug: a median of 40.9 years across the 1 well that filed both dates, with the middle half between 40.9 years and 40.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1351056314,600 ftOct 1964Sep 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (153)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

153 months

Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 200301,98733.487.93$15,749
Jan 200304,79330.315.58$26,755
Dec 200204,90526.914.85$23,808
Nov 200204,75624.664.14$19,675
Oct 200204,86026.464.23$20,554
Sep 200203,01827.443.64$10,971
Aug 200201,75125.963.16$5,540
Jul 200209924.583.06$303
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 200202,06518.222.38$4,906
Jan 200202,40417.172.38$5,711
Dec 200102,05316.932.36$4,854
Nov 200102,75018.072.41$6,615
Oct 200103,33419.782.53$8,431
Sep 200103,18124.262.25$7,161
Aug 200102,50524.873.05$7,648
Jul 2001034223.933.20$1,093
Jun 200103,46924.563.82$13,266
May 2001099825.524.31$4,299
Apr 200102,23224.685.34$11,908
Mar 200103,85924.545.38$20,748
Feb 200103,18827.755.77$18,385
Jan 200103,71527.478.40$31,201
Dec 200002,35126.889.12$21,447
Nov 200003,08732.215.66$17,466
Oct 200003,38431.235.15$17,412
Sep 200004,10931.875.19$21,311
Aug 200004,54629.644.54$20,642
Jul 200002,81128.534.09$11,496
Jun 200004,25529.304.40$18,710
May 200003,25427.263.68$11,974
Apr 200004,01124.513.12$12,498
Mar 200002,57128.422.86$7,352
Feb 200003,76527.622.73$10,265
Jan 200003,99225.272.48$9,902
Dec 199903,68924.282.42$8,941
Nov 199904,05223.192.43$9,863
Oct 199904,32320.982.80$12,120
Sep 199904,31521.752.62$11,300
Aug 199904,04519.262.88$11,632
Jul 199904,61317.892.37$10,944
Jun 199904,23015.942.36$9,992
May 199904,26415.792.32$9,897
Apr 199904,02515.102.21$8,887
Mar 199903,67212.471.84$6,750
Feb 199903,3619.981.82$6,110
Jan 199903,91110.381.90$7,431
Dec 199802,0769.201.77$3,681
Nov 199803,54310.892.19$7,744
Oct 199803,37912.421.97$6,654
Sep 199804,53812.592.08$9,451
Aug 199804,72011.301.91$9,003
Jul 199804,76111.742.24$10,652
Jun 199804,67311.242.24$10,455
May 199804,93412.622.21$10,886
Apr 199804,19413.042.51$10,507
Mar 1998304,19812.802.31$10,079
Feb 199803,38313.952.30$7,778
Jan 199803,96314.702.15$8,539
Dec 199703,35816.322.41$8,096
Nov 199703,38918.193.09$10,466
Oct 199703,60319.253.15$11,349
Sep 199704,49017.742.95$13,267
Aug 199705,18417.862.55$13,244
Jul 1997033417.582.25$750
Jun 199704,11017.242.26$9,277
May 199704,34218.972.31$10,024
Apr 199704,20517.882.08$8,758
Mar 199704,43518.951.94$8,600
Feb 199704,01120.492.21$8,848
Jan 199704,63123.483.54$16,392
Dec 199602,51723.32$0
Nov 199604,02321.97$0
Oct 199604,27223.31$0
Sep 199604,19222.22$0
Aug 199604,42120.26$0
Jul 199604,48119.55$0
Jun 199603,28818.73$0
May 199604,20719.43$0
Apr 199604,45421.51$0
Mar 199604,64919.38$0
Feb 199604,30716.98$0
Jan 199604,40517.07$0
Dec 199504,82517.19$0
Nov 199504,87416.00$0
Oct 199503,99815.43$0
Sep 199504,27416.18$0
Aug 199504,52915.92$0
Jul 199504,75315.24$0
Jun 199503,78816.41$0
May 199504,63917.56$0
Apr 199504,52317.73$0
Mar 199504,63616.44$0
Feb 199504,20616.58$0
Jan 199504,88515.92$0
Dec 199404,96115.03$0
Nov 199404,96715.90$0
Oct 199405,18715.58$0
Sep 199404,44215.29$0
Aug 199405,29516.13$0
Jul 199405,62617.56$0
Jun 199405,90117.09$0
May 199403,60815.88$0
Apr 199405,22014.14$0
Mar 199405,37112.46$0
Feb 199404,69212.50$0
Jan 199405,31012.66$0
Dec 199304,52512.33$0
Nov 199305,02314.49$0
Oct 199305,34815.85$0
Sep 199305,37715.03$0
Aug 199305,44715.66$0
Jul 199305,52615.46$0
Jun 199305,28916.79$0
May 199305,55317.68$0
Apr 199305,05618.05$0
Mar 199305,64918.14$0
Feb 199305,12717.90$0
Jan 199305,98016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 33.48 =         $0
Gas                1,987 Mcf  × $  7.93 =    $15,749

────────────────────────────────────────────────────
Month total                                  $15,749

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/34578 is the state's own key, not one this site invented.