MIDLAND NATIONAL BANK TRUSTEE

Operated by HUNTINGTON ENERGY, L.L.C. (P-5 419291) in the LOCKRIDGE (ELLENBURGER 18600) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 46767District 08Field 54331500CondensateGasSaveExport
Value, all time
$41 k
Jan 1993 – Nov 2000
Value, last 12 filed months
$448
at the published price for each month
Months reported
95
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 25 wells, and the rule below applies to all of them.

Discovered
1966-09-22
as the register files it
Field class
Gas
the register's own label
Between wells
3,735 ft
minimum
From a lease line
1,867 ft
minimum

A drilling unit in this field needs at least 640 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/1999.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5 bbl$159
GasProduction196,819 Mcf$40,953
Total$41,113

180,159 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3907, -103.1339. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.39069, -103.13388 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
20,328 ft
1 wells filed one
Completion to plug
31.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 20,328 ft.

Completions filed
May 1969
1 of 1 wells
Plug dates filed
Nov 2000
1 of 1 wells

Last completion to plug: a median of 31.5 years across the 1 well that filed both dates, with the middle half between 31.5 years and 31.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-47520071120,328 ftMay 1969Nov 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (95)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

95 months

Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20005031.875.19$159
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200002429.304.40$106
May 200004027.263.68$147
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000827.622.73$22
Jan 20000025.272.48$0
Dec 19990624.282.42$15
Nov 19990023.192.43$0
Oct 1999010820.982.80$303
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 1998051112.421.97$1,006
Sep 1998089912.592.08$1,872
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 199801411.242.24$31
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 1998094712.802.31$2,187
Feb 1998087713.952.30$2,016
Jan 1998091214.702.15$1,965
Dec 1997097716.322.41$2,356
Nov 199701,04118.193.09$3,215
Oct 199701,06719.253.15$3,361
Sep 1997095317.742.95$2,816
Aug 199701,05017.862.55$2,682
Jul 199701,06817.582.25$2,400
Jun 199701,02017.242.26$2,302
May 199701,06418.972.31$2,456
Apr 199701,10117.882.08$2,293
Mar 199701,12318.951.94$2,178
Feb 1997099320.492.21$2,190
Jan 1997085723.483.54$3,034
Dec 1996084823.32$0
Nov 1996021721.97$0
Oct 1996042423.31$0
Sep 1996096622.22$0
Aug 1996095520.26$0
Jul 199601,03019.55$0
Jun 1996096918.73$0
May 199601,15319.43$0
Apr 199601,59621.51$0
Mar 1996065619.38$0
Feb 1996056316.98$0
Jan 199601,48817.07$0
Dec 19950017.19$0
Nov 1995088516.00$0
Oct 1995063315.43$0
Sep 199503,17116.18$0
Aug 199501,09615.92$0
Jul 199501,00315.24$0
Jun 199501,07516.41$0
May 1995091917.56$0
Apr 199502,18417.73$0
Mar 199502,91916.44$0
Feb 199502,98216.58$0
Jan 199505,96915.92$0
Dec 199403,14315.03$0
Nov 199401,00515.90$0
Oct 199401,92915.58$0
Sep 199401,95015.29$0
Aug 199402,38416.13$0
Jul 199403,45717.56$0
Jun 199403,45817.09$0
May 199404,21915.88$0
Apr 199404,92014.14$0
Mar 199402,44312.46$0
Feb 1994093712.50$0
Jan 1994090512.66$0
Dec 199307,80612.33$0
Nov 1993020,27614.49$0
Oct 1993019,31715.85$0
Sep 199308,13915.03$0
Aug 1993013,67815.66$0
Jul 199302,13315.46$0
Jun 199303,25016.79$0
May 199304,81517.68$0
Apr 199309,03218.05$0
Mar 199307,55818.14$0
Feb 199308,11217.90$0
Jan 1993011,59216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2000 — as filed, then multipliedworked
Condensate             5 bbl  × $ 31.87 =       $159
Gas                    0 Mcf  × $  5.19 =         $0

────────────────────────────────────────────────────
Month total                                     $159

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/46767 is the state's own key, not one this site invented.