GRAY, NELLE

Operated by FOUR C OIL & GAS CORP. (P-5 280588) in the FOUR C (YATES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 97006District 08Field 32344900CondensateGasSaveExport
Value, all time
$12 k
Jan 1993 – May 2017
Value, last 12 filed months
$701
at the published price for each month
Months reported
293
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1977-10-03
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6 bbl$330
GasProduction3,041 Mcf$11,871
Total$12,201

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2409, -102.5697. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.24091, -102.56972 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,186 ft
1 wells filed one
Completion to plug
35.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,186 ft.

Completions filed
Dec 1981
1 of 1 wells
Plug dates filed
Jun 2017
1 of 1 wells

Last completion to plug: a median of 35.5 years across the 1 well that filed both dates, with the middle half between 35.5 years and 35.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-37133364101,186 ftDec 1981Jun 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (293)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

293 months

May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 201701249.413.42$41
Dec 201601248.763.72$45
Nov 201601242.492.64$32
Oct 201601346.193.09$40
Sep 201601241.553.10$37
Aug 201601341.442.92$38
Jul 201601341.622.92$38
Jun 2016016045.352.69$430
May 201601042.521.99$20
Apr 201601336.561.99$26
Mar 201601033.011.79$18
Feb 201601126.472.06$23
Jan 20160527.352.36$12
Dec 20150732.362.00$14
Nov 20150738.792.17$15
Oct 201501243.552.43$29
Sep 201501342.992.76$36
Aug 201501540.162.87$43
Jul 201501548.152.95$44
Jun 20150056.152.88$0
May 201501355.212.96$38
Apr 201501349.822.71$35
Mar 201501342.892.93$38
Feb 201501144.662.98$33
Jan 201501043.433.10$31
Dec 20140754.693.59$25
Nov 20140670.464.25$26
Oct 20140878.303.90$31
Sep 201401086.164.05$40
Aug 201401089.394.04$40
Jul 201401096.564.18$42
Jun 201401198.164.74$52
May 201401094.734.73$47
Apr 20140295.944.81$10
Mar 20140895.895.06$40
Feb 20140797.406.19$43
Jan 20140890.404.86$39
Dec 201301091.824.35$44
Nov 201301088.853.74$37
Oct 201301097.423.78$38
Sep 2013010104.113.72$37
Aug 201309104.253.52$32
Jul 2013010102.523.72$37
Jun 201301094.403.93$39
May 201301094.834.15$41
Apr 201301093.964.28$43
Mar 201301093.623.91$39
Feb 20130891.233.42$27
Jan 20130791.603.42$24
Dec 20120786.773.42$24
Nov 201201086.953.62$36
Oct 201201089.383.40$34
Sep 201201094.672.92$29
Aug 201201092.662.91$29
Jul 201201085.133.02$30
Jun 201201079.822.52$25
May 201201091.612.49$25
Apr 2012010101.652.00$20
Mar 2012010105.052.22$22
Feb 2012010101.102.57$26
Jan 201201098.092.73$27
Dec 201101096.873.24$32
Nov 201101095.723.31$33
Oct 201101084.983.65$36
Sep 201101083.623.99$40
Aug 201101083.404.15$41
Jul 201101094.144.52$45
Jun 201101092.904.64$46
May 201101098.134.40$44
Apr 2011010105.964.33$43
Mar 201101096.364.06$41
Feb 201101085.644.18$42
Jan 201101086.504.59$46
Dec 201001085.734.35$43
Nov 201001080.843.80$38
Oct 201001078.103.51$35
Sep 201001072.633.98$40
Aug 201001073.684.42$44
Jul 201001072.554.74$47
Jun 201001070.364.91$49
May 201001071.124.24$42
Apr 201001081.694.12$41
Mar 201001078.394.39$44
Feb 201001073.585.44$54
Jan 201001074.365.96$60
Dec 200901071.445.48$55
Nov 200901074.593.75$38
Oct 200901072.544.11$41
Sep 200901065.543.06$31
Aug 200901067.423.22$32
Jul 200901061.133.46$35
Jun 200901066.163.90$39
May 200901054.743.93$39
Apr 200901046.773.59$36
Mar 200901042.144.06$41
Feb 200901032.814.63$46
Jan 200901035.865.37$54
Dec 200801037.105.98$60
Nov 200801055.496.86$69
Oct 200801075.246.92$69
Sep 2008010101.767.88$79
Aug 2008010114.228.48$85
Jul 2008010131.0811.39$114
Jun 2008010131.3313.03$130
May 2008010123.1711.57$116
Apr 2008010110.3110.45$105
Mar 2008010101.909.66$97
Feb 20080692.538.77$53
Jan 200801090.388.21$82
Dec 200701088.337.30$73
Nov 200701091.677.29$73
Oct 20070582.856.92$35
Sep 200701075.846.24$62
Aug 200701069.066.39$64
Jul 200701070.906.39$64
Jun 200701062.007.55$75
May 200701058.747.85$78
Apr 20070659.617.81$47
Mar 20070556.927.30$37
Feb 20070655.108.22$49
Jan 20070650.306.73$40
Dec 20060256.656.92$14
Nov 20060354.207.62$23
Oct 200601054.906.01$60
Sep 20060360.085.04$15
Aug 20060968.717.34$66
Jul 20060969.376.34$57
Jun 20060066.286.38$0
May 20060666.016.42$39
Apr 20060464.397.36$29
Mar 20060656.707.08$43
Feb 20060357.597.75$23
Jan 20060760.598.93$63
Dec 200565654.9413.42$1,081
Nov 20050354.6910.59$32
Oct 20050158.3413.80$14
Sep 20050461.4512.08$48
Aug 200501061.519.80$98
Jul 20050455.697.84$31
Jun 20050452.337.38$30
May 200501045.226.65$67
Apr 200501049.207.36$74
Mar 20050350.377.15$21
Feb 20050145.226.31$6
Jan 20050443.166.32$25
Dec 20040239.866.75$14
Nov 200401245.286.33$76
Oct 20040349.706.52$20
Sep 20040343.245.28$16
Aug 20040142.375.55$6
Jul 20040838.286.08$49
Jun 200401036.106.43$64
May 20040637.486.49$39
Apr 200401034.475.86$59
Mar 20040634.365.53$33
Feb 20040132.455.51$6
Jan 20040632.036.30$38
Dec 20030330.266.30$19
Nov 20030228.804.60$9
Oct 20030328.174.76$14
Sep 20030926.314.75$43
Aug 20030129.765.13$5
Jul 20030529.415.17$26
Jun 20030528.565.98$30
May 200301226.595.97$72
Apr 200301026.675.41$54
Mar 20030231.146.10$12
Feb 20030133.487.93$8
Jan 20030530.315.58$28
Dec 20020226.914.85$10
Nov 20020524.664.14$21
Oct 20020426.464.23$17
Sep 20020627.443.64$22
Aug 20020425.963.16$13
Jul 20020424.583.06$12
Jun 20020323.733.34$10
May 20020324.663.58$11
Apr 20020323.653.51$11
Mar 20020822.003.10$25
Feb 20020918.222.38$21
Jan 20020417.172.38$10
Dec 20010216.932.36$5
Nov 20010118.072.41$2
Oct 20010219.782.53$5
Sep 20010224.262.25$5
Aug 20010324.873.05$9
Jul 20010223.933.20$6
Jun 20010624.563.82$23
May 20010625.524.31$26
Apr 20010724.685.34$37
Mar 20010324.545.38$16
Feb 20010327.755.77$17
Jan 200101127.478.40$92
Dec 20000326.889.12$27
Nov 20000932.215.66$51
Oct 20000231.235.15$10
Sep 20000031.875.19$0
Aug 20000229.644.54$9
Jul 20000428.534.09$16
Jun 20000929.304.40$40
May 20000727.263.68$26
Apr 20000624.513.12$19
Mar 200001228.422.86$34
Feb 200002227.622.73$60
Jan 200001025.272.48$25
Dec 199905324.282.42$128
Nov 199901323.192.43$32
Oct 199902020.982.80$56
Sep 199902521.752.62$65
Aug 19990819.262.88$23
Jul 199901217.892.37$28
Jun 199901315.942.36$31
May 199904315.792.32$100
Apr 199901015.102.21$22
Mar 19990612.471.84$11
Feb 19990129.981.82$22
Jan 199901610.381.90$30
Dec 19980319.201.77$55
Nov 199802310.892.19$50
Oct 199802412.421.97$47
Sep 199805112.592.08$106
Aug 199803111.301.91$59
Jul 199806211.742.24$139
Jun 199803011.242.24$67
May 199802712.622.21$60
Apr 199805513.042.51$138
Mar 19980612.802.31$14
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 199706216.322.41$149
Nov 199709518.193.09$293
Oct 199708819.253.15$277
Sep 1997020217.742.95$597
Aug 1997020917.862.55$534
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 19930015.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 19930017.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 49.41 =         $0
Gas                   12 Mcf  × $  3.42 =        $41

────────────────────────────────────────────────────
Month total                                      $41

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/G/97006 is the state's own key, not one this site invented.