PARKER, J. E. -A-

Operated by BRIGHT & CO. (P-5 93125) in the GOLDSMITH (5600) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11563District 08Field 35652868Hydrogen sulphide fieldNGPA filingOilCasinghead gasSaveExport
Value, all time
$324 k
Jan 1993 – Apr 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 1,575 wells, and the rule below applies to all of them.

Discovered
1947-10-26
as the register files it
Field class
Oil and gas
the register's own label
Between wells
850 ft
minimum
From a lease line
555 ft
minimum

A drilling unit in this field needs at least 20 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: INTO THE GOLDSMITH (CLEAR FORK) FIELD.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition11,018 bbl$250,844
Casinghead gasProduction31,651 Mcf$73,564
Total$324,408

10,383 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8348, -102.6788. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.83484, -102.67883 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,325 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,325 ft.

Plug dates filed
Sep 2008
1 of 1 wells

1 well

42-1350380216,325 ftSep 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 200621054.906.01$1,153
Sep 200643060.085.04$2,583
Aug 20060368.717.34$22
Jul 20060469.376.34$25
Jun 200626866.286.38$1,774
May 20060266.016.42$13
Apr 20060464.397.36$29
Mar 20060656.707.08$43
Feb 20060457.597.75$31
Jan 20061025060.598.93$6,627
Dec 2005954654.9413.42$5,836
Nov 200504654.6910.59$487
Oct 2005864958.3413.80$5,693
Sep 200505261.4512.08$628
Aug 2005743961.519.80$4,934
Jul 20050055.697.84$0
Jun 200501952.337.38$140
May 200504045.226.65$266
Apr 2005733649.207.36$3,857
Mar 20051035450.377.15$5,574
Feb 200504645.226.31$290
Jan 200503343.166.32$209
Dec 2004843939.866.75$3,612
Nov 200404445.286.33$279
Oct 2004945549.706.52$5,030
Sep 200403443.245.28$180
Aug 200405442.375.55$300
Jul 2004997138.286.08$4,222
Jun 200406636.106.43$425
May 20041063437.486.49$4,194
Apr 20040034.475.86$0
Mar 2004112034.365.53$3,848
Feb 2004955032.455.51$3,358
Jan 200404032.036.30$252
Dec 200304930.266.30$309
Nov 2003774428.804.60$2,420
Oct 200305528.174.76$262
Sep 2003675926.314.75$2,043
Aug 200311113129.765.13$3,975
Jul 200309729.415.17$502
Jun 20039712728.565.98$3,530
May 2003011526.595.97$687
Apr 2003569226.675.41$1,991
Mar 200303631.146.10$219
Feb 20031201833.487.93$4,160
Jan 2003015130.315.58$843
Dec 2002905326.914.85$2,679
Nov 2002725324.664.14$1,995
Oct 20029011526.464.23$2,868
Sep 200205627.443.64$204
Aug 2002929325.963.16$2,683
Jul 20029014724.583.06$2,662
Jun 200210512423.733.34$2,906
May 20029013224.663.58$2,692
Apr 20028912923.653.51$2,558
Mar 20029816722.003.10$2,674
Feb 20028717718.222.38$2,006
Jan 200210920417.172.38$2,356
Dec 200110117316.932.36$2,119
Nov 20019922418.072.41$2,328
Oct 20019824219.782.53$2,550
Sep 2001021824.262.25$491
Aug 20019425124.873.05$3,104
Jul 20018727023.933.20$2,945
Jun 2001028224.563.82$1,078
May 200111633325.524.31$4,395
Apr 20019629524.685.34$3,943
Mar 2001034124.545.38$1,833
Feb 20019729127.755.77$4,370
Jan 20019225427.478.40$4,661
Dec 20009932726.889.12$5,644
Nov 2000031832.215.66$1,799
Oct 20009432931.235.15$4,628
Sep 200010434031.875.19$5,078
Aug 200010535129.644.54$4,706
Jul 2000034828.534.09$1,423
Jun 20008028329.304.40$3,588
May 2000101027.263.68$2,753
Apr 2000032224.513.12$1,003
Mar 200011133728.422.86$4,118
Feb 200010436327.622.73$3,862
Jan 20009935625.272.48$3,385
Dec 1999040724.282.42$986
Nov 199911236023.192.43$3,474
Oct 19999736320.982.80$3,053
Sep 199910931221.752.62$3,188
Aug 1999031619.262.88$909
Jul 199910233617.892.37$2,622
Jun 199910034715.942.36$2,414
May 19999735315.792.32$2,351
Apr 1999035015.102.21$773
Mar 199916835712.471.84$2,751
Feb 199911109.981.82$1,108
Jan 199910535410.381.90$1,762
Dec 199803249.201.77$575
Nov 199810435810.892.19$1,915
Oct 199810138012.421.97$2,003
Sep 199810035212.592.08$1,992
Aug 1998031111.301.91$593
Jul 199810836411.742.24$2,082
Jun 199810135311.242.24$1,925
May 19989134112.622.21$1,901
Apr 1998036413.042.51$912
Mar 199810935312.802.31$2,210
Feb 199810132813.952.30$2,163
Jan 199810236414.702.15$2,284
Dec 1997033116.322.41$798
Nov 199710236018.193.09$2,967
Oct 199711119019.253.15$2,735
Sep 19979622017.742.95$2,353
Aug 1997027417.862.55$700
Jul 19979917017.582.25$2,122
Jun 1997974917.242.26$1,783
May 19971006518.972.31$2,047
Apr 1997025217.882.08$525
Mar 199711239718.951.94$2,892
Feb 19979729520.492.21$2,638
Jan 199710231823.483.54$3,521
Dec 19969130323.32$2,122
Nov 1996036821.97$0
Oct 199610538123.31$2,448
Sep 199610137422.22$2,244
Aug 19969138420.26$1,844
Jul 19969341819.55$1,818
Jun 1996231118.73$37
May 19969233019.43$1,788
Apr 19968838221.51$1,893
Mar 19969838219.38$1,899
Feb 1996037616.98$0
Jan 199618625617.07$3,175
Dec 1995017217.19$0
Nov 19959514716.00$1,520
Oct 1995955015.43$1,466
Sep 19951096116.18$1,764
Aug 199506115.92$0
Jul 1995914515.24$1,387
Jun 1995845816.41$1,378
May 19959715417.56$1,703
Apr 19959718917.73$1,720
Mar 1995221116.44$33
Feb 19958019116.58$1,326
Jan 19958823815.92$1,401
Dec 19948822615.03$1,323
Nov 199410921615.90$1,733
Oct 19949321615.58$1,449
Sep 1994016215.29$0
Aug 19949015816.13$1,452
Jul 199410415917.56$1,826
Jun 199410215217.09$1,743
May 19949712815.88$1,540
Apr 199410121114.14$1,428
Mar 1994020812.46$0
Feb 19948719112.50$1,088
Jan 19949221912.66$1,165
Dec 19937617812.33$937
Nov 1993023614.49$0
Oct 19939820915.85$1,553
Sep 19939118215.03$1,368
Aug 19938814415.66$1,378
Jul 19939114715.46$1,407
Jun 19939015916.79$1,511
May 199310316717.68$1,821
Apr 1993016618.05$0
Mar 19939222218.14$1,669
Feb 19938724117.90$1,557
Jan 19939024416.93$1,524

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2006 — as filed, then multipliedworked
Oil                   21 bbl  × $ 54.90 =     $1,153
Casinghead gas         0 Mcf  × $  6.01 =         $0

────────────────────────────────────────────────────
Month total                                   $1,153

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/11563 is the state's own key, not one this site invented.