CUMMINS -W-

Operated by OXY USA WTP LP (P-5 630555) in the GOLDSMITH (5600) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12459District 08Field 35652868Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$332 k
Jan 1993 – Feb 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
170
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 157 leases and 1,575 wells, and the rule below applies to all of them.

Discovered
1947-10-26
as the register files it
Field class
Oil and gas
the register's own label
Between wells
850 ft
minimum
From a lease line
555 ft
minimum

A drilling unit in this field needs at least 20 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: INTO THE GOLDSMITH (CLEAR FORK) FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition17,312 bbl$304,135
Casinghead gasProduction46,054 Mcf$28,351
Total$332,486

36,225 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0211, -102.7166. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

32.02106, -102.71663 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
6,393 ft
2 wells filed one
Completion to plug
64.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,380 and 6,405 ft, median 6,393 ft, over the 2 wells that filed a depth.

Completions filed
Dec 1959 – Jul 2022
2 of 2 wells
Plug dates filed
Apr 2024
1 of 2 wells; 1 filed none

Last completion to plug: a median of 64.3 years across the 1 well that filed both dates, with the middle half between 64.3 years and 64.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-135003393 U6,380 ftJul 2022Yes
42-135003404 U6,405 ftDec 1959Apr 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (170)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

170 months

Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 200263026.464.23$1,667
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020723.653.51$25
Mar 200202822.003.10$87
Feb 200202018.222.38$48
Jan 20020217.172.38$5
Dec 200102516.932.36$59
Nov 200103818.072.41$91
Oct 20011252519.782.53$2,536
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 200104623.933.20$147
Jun 200103624.563.82$138
May 20012515125.524.31$6,625
Apr 200105224.685.34$277
Mar 200104324.545.38$231
Feb 20013068227.755.77$8,964
Jan 2001011327.478.40$949
Dec 2000016626.889.12$1,514
Nov 200030816832.215.66$10,871
Oct 2000019031.235.15$978
Sep 2000016731.875.19$866
Aug 200031011329.644.54$9,702
Jul 2000017428.534.09$712
Jun 2000017129.304.40$752
May 2000011627.263.68$427
Apr 200026513524.513.12$6,916
Mar 2000012228.422.86$349
Feb 2000013427.622.73$365
Jan 200026914025.272.48$7,145
Dec 1999014524.282.42$351
Nov 1999013723.192.43$333
Oct 199927913820.982.80$6,240
Sep 1999013521.752.62$354
Aug 1999022819.262.88$656
Jul 199932721317.892.37$6,355
Jun 1999021815.942.36$515
May 199932622315.792.32$5,665
Apr 1999021615.102.21$477
Mar 1999024312.471.84$447
Feb 19993442139.981.82$3,820
Jan 1999024110.381.90$458
Dec 19982141819.201.77$2,290
Nov 1998021110.892.19$461
Oct 199825713512.421.97$3,458
Sep 1998119112.592.08$410
Aug 199828220011.301.91$3,568
Jul 1998023911.742.24$535
Jun 199833213711.242.24$4,038
May 1998112212.622.21$282
Apr 199829115813.042.51$4,190
Mar 1998223412.802.31$566
Feb 199825720413.952.30$4,054
Jan 199830221314.702.15$4,898
Dec 1997024016.322.41$579
Nov 199727420418.193.09$5,614
Oct 19973514319.253.15$6,892
Sep 19971017.742.95$18
Aug 199728816317.862.55$5,560
Jul 1997124617.582.25$570
Jun 1997025317.242.26$571
May 199726534218.972.31$5,817
Apr 199725832717.882.08$5,294
Mar 1997034918.951.94$677
Feb 199728532720.492.21$6,561
Jan 1997039623.483.54$1,402
Dec 199625936223.32$6,040
Nov 1996038321.97$0
Oct 199630044623.31$6,993
Sep 1996046222.22$0
Aug 199625646620.26$5,187
Jul 199625347019.55$4,946
Jun 1996041418.73$0
May 199629027419.43$5,635
Apr 199635225521.51$7,572
Mar 1996032919.38$0
Feb 199634144816.98$5,790
Jan 199631838517.07$5,428
Dec 1995120917.19$17
Nov 199531112616.00$4,976
Oct 199533020115.43$5,092
Sep 199534722116.18$5,614
Aug 1995050315.92$0
Jul 199529284715.24$4,450
Jun 1995089316.41$0
May 19952691,02117.56$4,724
Apr 199501,00517.73$0
Mar 19952781,07616.44$4,570
Feb 199526994016.58$4,460
Jan 199521970515.92$3,486
Dec 19943221,05415.03$4,840
Nov 199401,04215.90$0
Oct 19945251,22715.58$8,180
Sep 199401,10415.29$0
Aug 19943281,14916.13$5,291
Jul 19942931,46317.56$5,145
Jun 199401,20017.09$0
May 199429567515.88$4,685
Apr 19942941,00914.14$4,157
Mar 19943101,10812.46$3,863
Feb 1994037612.50$0
Jan 19943011,07012.66$3,811
Dec 199330476712.33$3,748
Nov 199328044314.49$4,057
Oct 1993048115.85$0
Sep 199324269315.03$3,637
Aug 1993085715.66$0
Jul 199331654415.46$4,885
Jun 199333757316.79$5,658
May 19933351,10017.68$5,923
Apr 19933411,25018.05$6,155
Mar 19932651,44518.14$4,807
Feb 19933341,45717.90$5,979
Jan 19933701,69716.93$6,264

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2002 — as filed, then multipliedworked
Oil                   63 bbl  × $ 26.46 =     $1,667
Casinghead gas         0 Mcf  × $  4.23 =         $0

────────────────────────────────────────────────────
Month total                                   $1,667

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/12459 is the state's own key, not one this site invented.