KYDD

Operated by JM COX RESOURCES, L.P. (P-5 433075) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 18193District 08Field 85280300OilCasinghead gasSaveExport
Value, all time
$571 k
Jan 1993 – Sep 2006
Value, last 12 filed months
$42 k
at the published price for each month
Months reported
165
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 16,587 leases and 43,997 wells, and the rule below applies to all of them.

Discovered
1952-12-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-02-13.

The Commission's schedule remark for this field reads: SPRABERRY (TREND AREA) FIELD EFFECTIVE 10/1/2019.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition24,805 bbl$535,880
Casinghead gasProduction23,838 Mcf$34,975
Total$570,855

16,154 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2766, -101.7161. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

32.27664, -101.71615 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
7,603 ft
2 wells filed one
Completion to plug
38.2 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,590 and 7,615 ft, median 7,603 ft, over the 2 wells that filed a depth.

Completions filed
Jan 1964
2 of 2 wells
Plug dates filed
Sep 1997 – Sep 2006
2 of 2 wells

Last completion to plug: a median of 38.2 years across the 2 wells that filed both dates, with the middle half between 35.9 years and 40.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-3171002827,590 ftJan 1964Sep 2006Yes
42-3171002717,615 ftJan 1964Sep 1997Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (165)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

165 months

Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 2006936866.016.42$6,576
Apr 20061686864.397.36$11,318
Mar 200606856.707.08$482
Feb 200606857.597.75$527
Jan 20061746860.598.93$11,150
Dec 200506854.9413.42$912
Nov 200506854.6910.59$720
Oct 20051686858.3413.80$10,739
Sep 200506861.4512.08$821
Aug 20051666861.519.80$10,877
Jul 200506855.697.84$533
Jun 200506852.337.38$502
May 20051686845.226.65$8,049
Apr 200506849.207.36$501
Mar 200506850.377.15$487
Feb 200506845.226.31$429
Jan 20051806843.166.32$8,199
Dec 20041806839.866.75$7,634
Nov 200406845.286.33$430
Oct 20041796849.706.52$9,339
Sep 20041746843.245.28$7,883
Aug 20041716842.375.55$7,623
Jul 200406838.286.08$414
Jun 20041806836.106.43$6,935
May 200406837.486.49$442
Apr 20041776834.475.86$6,500
Mar 200406834.365.53$376
Feb 200406832.455.51$375
Jan 20041816832.036.30$6,226
Dec 200306830.266.30$429
Nov 200306828.804.60$312
Oct 20031686828.174.76$5,056
Sep 200306826.314.75$323
Aug 20031726829.765.13$5,468
Jul 200306829.415.17$352
Jun 20031736828.565.98$5,348
May 20031816826.595.97$5,219
Apr 20031736826.675.41$4,982
Mar 200306831.146.10$415
Feb 20031806833.487.93$6,565
Jan 200306830.315.58$380
Dec 200206826.914.85$330
Nov 200206824.664.14$281
Oct 20021826826.464.23$5,103
Sep 200206827.443.64$247
Aug 20021806825.963.16$4,888
Jul 200206824.583.06$208
Jun 20021776823.733.34$4,427
May 200206824.663.58$244
Apr 20021786823.653.51$4,449
Mar 20021776822.003.10$4,105
Feb 20021746818.222.38$3,332
Jan 200206817.172.38$162
Dec 200106816.932.36$161
Nov 20011696818.072.41$3,217
Oct 20011796819.782.53$3,713
Sep 20011686824.262.25$4,229
Aug 20011666824.873.05$4,336
Jul 20011726823.933.20$4,333
Jun 20011696824.563.82$4,411
May 20011776825.524.31$4,810
Apr 20011756824.685.34$4,682
Mar 20011806824.545.38$4,783
Feb 20011736827.755.77$5,193
Jan 20011716827.478.40$5,268
Dec 20001736826.889.12$5,271
Nov 20001816832.215.66$6,215
Oct 200006831.235.15$350
Sep 20001726831.875.19$5,834
Aug 20001716829.644.54$5,377
Jul 20001706828.534.09$5,128
Jun 20001796829.304.40$5,544
May 20001726827.263.68$4,939
Apr 20001756824.513.12$4,501
Mar 20001806828.422.86$5,310
Feb 20001806827.622.73$5,157
Jan 20003506825.272.48$9,013
Dec 19991756824.282.42$4,414
Nov 19991706823.192.43$4,108
Oct 19991746820.982.80$3,841
Sep 19991736821.752.62$3,941
Aug 19991746819.262.88$3,547
Jul 19991756817.892.37$3,292
Jun 19991736815.942.36$2,918
May 19991746815.792.32$2,905
Apr 19991756815.102.21$2,793
Mar 19991676812.471.84$2,208
Feb 1999163689.981.82$1,750
Jan 19991706810.381.90$1,894
Dec 1998337689.201.77$3,221
Nov 19981676810.892.19$1,967
Oct 199806812.421.97$134
Sep 19981766812.592.08$2,357
Aug 19981836811.301.91$2,198
Jul 19981786811.742.24$2,242
Jun 19981806811.242.24$2,175
May 19983526812.622.21$4,592
Apr 19981966813.042.51$2,726
Mar 19981986812.802.31$2,691
Feb 19981926813.952.30$2,835
Jan 19981796814.702.15$2,778
Dec 19971966816.322.41$3,363
Nov 19973816818.193.09$7,140
Oct 199706819.253.15$214
Sep 199706817.742.95$201
Aug 199706817.862.55$174
Jul 19971796817.582.25$3,300
Jun 19971906817.242.26$3,429
May 19971936818.972.31$3,818
Apr 199706817.882.08$142
Mar 19973676818.951.94$7,087
Feb 199706820.492.21$150
Jan 19971966823.483.54$4,843
Dec 199616823.32$23
Nov 19961976821.97$4,328
Oct 19961936823.31$4,499
Sep 19961946822.22$4,311
Aug 199619628020.26$3,971
Jul 1996028019.55$0
Jun 199630028018.73$5,619
May 1996028019.43$0
Apr 1996028021.51$0
Mar 199617228019.38$3,333
Feb 199638828016.98$6,588
Jan 1996028017.07$0
Dec 199519828017.19$3,404
Nov 1995128016.00$16
Oct 199518028015.43$2,777
Sep 199519628016.18$3,171
Aug 199519531515.92$3,104
Jul 199519438615.24$2,957
Jun 1995034216.41$0
May 199520233917.56$3,547
Apr 199518632217.73$3,298
Mar 199520733416.44$3,403
Feb 199519133616.58$3,167
Jan 199518732915.92$2,977
Dec 199418230815.03$2,735
Nov 199437441215.90$5,947
Oct 199419140115.58$2,976
Sep 199439341915.29$6,009
Aug 199419546816.13$3,145
Jul 199437251117.56$6,532
Jun 199436847517.09$6,289
May 199420245815.88$3,208
Apr 199437032514.14$5,232
Mar 199418728012.46$2,330
Feb 199437428012.50$4,675
Jan 199420628012.66$2,608
Dec 199338831612.33$4,784
Nov 199318843814.49$2,724
Oct 199339646815.85$6,277
Sep 199319446715.03$2,916
Aug 199337649315.66$5,888
Jul 199318946715.46$2,922
Jun 199335642416.79$5,977
May 199318838617.68$3,324
Apr 199338744618.05$6,985
Mar 199319141418.14$3,465
Feb 199318641917.90$3,329
Jan 199319546416.93$3,301

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2006 — as filed, then multipliedworked
Oil                   93 bbl  × $ 66.01 =     $6,139
Casinghead gas        68 Mcf  × $  6.42 =       $437

────────────────────────────────────────────────────
Month total                                   $6,576

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/18193 is the state's own key, not one this site invented.