MOSS, PAUL

Operated by CODY ENERGY LLC (P-5 164455) in the COWDEN, SOUTH (13800) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 20340District 08Field 21292875Hydrogen sulphide fieldNGPA filingOilCasinghead gasSaveExport
Value, all time
$3.7 M
Jan 1993 – Jul 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
211
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 11 wells, and the rule below applies to all of them.

Discovered
1966-04-13
as the register files it
Field class
Oil
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition215,691 bbl$3,557,787
Casinghead gasProduction279,011 Mcf$135,959
Total$3,693,746

220,899 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7953, -102.4293. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.6 miles.

31.79561, -102.42884 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
5 of 5 wells
With a plug date
60.0%
3 of 5 wells
Median depth
13,815 ft
5 wells filed one
Completion to plug
8.0 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
5100.0%
A plug date is filed
360.0%
BothOn the schedule and plugged. Neither fact cancels the other.
360.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 13,790 and 14,088 ft, median 13,815 ft, over the 5 wells that filed a depth.

Completions filed
Apr 1972 – Jun 2004
5 of 5 wells
Plug dates filed
Jun 1981 – Jun 2012
3 of 5 wells; 2 filed none

Last completion to plug: a median of 8.0 years across the 3 wells that filed both dates, with the middle half between 4.6 years and 8.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

5 wells

42-1353319018613,857 ftJun 2004Jun 2012Yes
42-13530141105 L13,815 ftOct 1999Yes
42-1352017210413,804 ftSep 1994Dec 2003Yes
42-1352017010213,790 ftMay 1980Jun 1981Yes
42-1352016910114,088 ftApr 1972Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (211)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

211 months

Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19997415621.752.62$2,018
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 19999809.981.82$978
Jan 19991,4571,88710.381.90$18,709
Dec 19981,4511,8059.201.77$16,550
Nov 19981,5221,46710.892.19$19,781
Oct 19981,2191,50712.421.97$18,108
Sep 19982,0882,12012.592.08$30,703
Aug 19981,8822,77111.301.91$26,552
Jul 19981,7572,73611.742.24$26,748
Jun 19982,0282,37211.242.24$28,102
May 19981,9842,34312.622.21$30,208
Apr 19981,8532,20813.042.51$29,695
Mar 19981,9092,36512.802.31$29,897
Feb 19981,6242,40313.952.30$28,180
Jan 19981,8701,61514.702.15$30,969
Dec 19972,4292,19716.322.41$44,938
Nov 19972,1062,47318.193.09$45,945
Oct 19972,4961,44819.253.15$52,609
Sep 19972,0401,87217.742.95$41,721
Aug 19972,1181,66717.862.55$42,086
Jul 19972,3492,13817.582.25$46,099
Jun 19972,1922,85817.242.26$44,241
May 19971,9362,46118.972.31$42,407
Apr 19972,5523,11017.882.08$52,107
Mar 19972,7703,65018.951.94$59,569
Feb 19972,7023,32220.492.21$62,692
Jan 19972,2583,16123.483.54$64,207
Dec 19962,9013,51923.32$67,651
Nov 19962,9053,32821.97$63,823
Oct 19962,5073,56623.31$58,438
Sep 19962,8613,57622.22$63,571
Aug 19962,6803,74720.26$54,297
Jul 19962,5682,92219.55$50,204
Jun 19962,6594,26918.73$49,803
May 19962,9494,15419.43$57,299
Apr 19962,9782,72821.51$64,057
Mar 19962,9603,29419.38$57,365
Feb 19962,5463,46416.98$43,231
Jan 19962,7322,90017.07$46,635
Dec 19953,7963,89017.19$65,253
Nov 19952,9903,38416.00$47,840
Oct 19953,6095,58015.43$55,687
Sep 19952,9105,95916.18$47,084
Aug 19953,5685,50515.92$56,803
Jul 19953,4786,00415.24$53,005
Jun 19953,3465,23616.41$54,908
May 19953,0554,67617.56$53,646
Apr 19953,1085,75917.73$55,105
Mar 19952,9795,16416.44$48,975
Feb 19953,0002,98016.58$49,740
Jan 19953,3204,02015.92$52,854
Dec 19943,0044,40715.03$45,150
Nov 19942,9855,24115.90$47,462
Oct 19943,3086,94315.58$51,539
Sep 19942,5713,06415.29$39,311
Aug 19942,8343,77916.13$45,712
Jul 19943,2713,76317.56$57,439
Jun 19943,7206,08917.09$63,575
May 19943,3656,09615.88$53,436
Apr 19943,3845,08514.14$47,850
Mar 19944,2655,28712.46$53,142
Feb 19943,14311,23812.50$39,288
Jan 19944,2414,90412.66$53,691
Dec 19934,9483,94012.33$61,009
Nov 19934,7285,50614.49$68,509
Oct 19934,6035,03415.85$72,958
Sep 19934,7225,89915.03$70,972
Aug 19934,9285,07915.66$77,172
Jul 19933,9095,42115.46$60,433
Jun 19934,2421,76816.79$71,223
May 19934,0845,34317.68$72,205
Apr 19934,0023,88818.05$72,236
Mar 19934,3924,42318.14$79,671
Feb 19933,4864,38217.90$62,399
Jan 19934,3874,69616.93$74,272

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 1999 — as filed, then multipliedworked
Oil                   74 bbl  × $ 21.75 =     $1,610
Casinghead gas       156 Mcf  × $  2.62 =       $409

────────────────────────────────────────────────────
Month total                                   $2,018

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/20340 is the state's own key, not one this site invented.