GOLDSMITH BLAKENEY CLRFK. UNIT

Operated by LARIO OIL & GAS COMPANY (P-5 486710) in the GOLDSMITH (CLEAR FORK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 20639District 08Field 35652062Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$60.5 M
Jan 1993 – May 2026
Value, last 12 filed months
$1.6 M
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 255 leases and 3,904 wells, and the rule below applies to all of them.

Discovered
1946-03-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 2006-10-10.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,117,023 bbl$56,458,468
Casinghead gasProduction1,067,995 Mcf$3,996,240
Total$60,454,708

164,723 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (24)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0199, -102.6312. A lease has no coordinate of its own — that point is the mean of its wells, and they span 1.4 miles.

32.01875, -102.63013 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
37.5%
9 of 24 wells
With a plug date
29.2%
7 of 24 wells
Median depth
6,300 ft
21 wells filed one
Completion to plug
30.8 years
median over 4 wells

What the state filed about each well

On the RRC proration schedule
937.5%
A plug date is filed
729.2%
BothOn the schedule and plugged. Neither fact cancels the other.
729.2%
NeitherNo plug date, and not on the schedule.
1562.5%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 21 of 24 wells. Median 6,300 ft, with the middle half between 6,205 and 6,320 ft; the shallowest is 5,716 ft and the deepest 6,376 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 19 of 24 wells, Jul 1950 – May 2022. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Jul 1950 – May 2022
19 of 24 wells; 5 filed none
Plug dates filed
May 1994 – Sep 2024
7 of 24 wells; 17 filed none

Last completion to plug: a median of 30.8 years across the 4 wells that filed both dates, with the middle half between 20.3 years and 43.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

24 wells

42-135044104026,282 ftMay 1994Yes
42-135044114036,349 ftJul 2022Yes
42-135044305016,347 ftAug 2002Yes
42-13504408204
42-13504409401
42-13543854301P6,150 ftMay 2022
42-13543853104P6,236 ftMay 2022
42-13543861403P6,318 ftMay 2022
42-13543860402P6,306 ftMay 2022
42-13543855305P6,205 ftMay 2022
42-13543856302P6,315 ftMay 2022
42-135437652056,194 ftJul 2021
42-135437576056,308 ftJul 2021
42-135437664066,224 ftJul 2021
42-135044136016,375 ftApr 2008Yes
42-135044166036,320 ftJan 2006Sep 2024Yes
42-135044124046,376 ftJan 1999Oct 2019Yes
42-135082763026,360 ftMay 1972Feb 2013Yes
42-135044144056,300 ftOct 1962
42-135044156026,085 ftJan 1952
42-135082773035,850 ftSep 1951
42-135044062025,716 ftJan 1951Aug 2002Yes
42-13504407203Oct 1950Yes
42-135044042016,270 ftJul 1950

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20261,7971,474106.413.05$195,708
Apr 20261,7721,44498.932.87$179,448
Mar 20261,9401,55789.753.15$179,019
Feb 20261,5581,14063.503.75$103,208
Jan 20261,7781,44759.138.00$116,706
Dec 20251,8011,41156.664.41$108,272
Nov 20251,6291,31658.593.93$100,610
Oct 20252,0951,69859.383.30$130,013
Sep 20252,0981,70562.743.08$136,875
Aug 20251,7521,50463.933.01$116,540
Jul 20251,7471,47266.743.32$121,475
Jun 20251,7521,60566.483.13$121,495
May 20252,1181,08760.553.23$131,758
Apr 20252,1361,20862.363.54$137,481
Mar 20252,1572,06267.704.27$154,830
Feb 20251,7661,68170.884.34$132,471
Jan 20251,7701,97774.324.28$140,005
Dec 20242,5402,34768.993.12$182,560
Nov 20242,6602,40469.052.20$188,958
Oct 20242,3442,71471.372.28$173,483
Sep 20242,3371,53569.612.36$166,308
Aug 20242,8751,22975.632.06$219,972
Jul 20242,1512,16579.932.15$176,577
Jun 20242,6903,10378.082.63$218,208
May 20242,3383,12478.812.20$191,126
Apr 20242,8992,97384.451.66$249,753
Mar 20242,8723,15480.301.55$235,495
Feb 20242,5982,93976.091.78$202,924
Jan 20242,9402,76773.023.30$223,803
Dec 20232,7312,60371.262.61$201,407
Nov 20233,0192,73577.892.81$242,829
Oct 20233,0522,94085.443.09$269,839
Sep 20233,0382,57389.042.74$277,541
Aug 20232,9352,58280.522.67$243,228
Jul 20233,0072,88474.852.64$232,693
Jun 20233,0512,19368.962.26$215,350
May 20233,3013,33970.622.23$240,554
Apr 20233,4953,28378.122.24$280,376
Mar 20233,4813,86872.852.39$262,848
Feb 20233,3993,10575.112.47$262,955
Jan 20234,0603,73476.533.39$323,362
Dec 20223,7143,20776.415.73$302,160
Nov 20225,0794,02285.005.65$454,424
Oct 20224,0853,26787.185.86$375,287
Sep 20222,8982,40684.888.16$265,624
Aug 20222,8743,13394.529.13$300,246
Jul 20223,5523,403101.587.54$386,478
Jun 20223,4143,540115.097.98$421,157
May 20223,7413,904109.378.43$442,076
Apr 20222,3392,630104.226.84$261,753
Mar 20222,6562,525108.885.08$302,003
Feb 20221,7811,86891.054.86$171,236
Jan 20222,8752,68881.844.54$247,487
Dec 20212,8553,72571.323.90$218,143
Nov 20213,2874,81477.435.24$279,723
Oct 20213,3805,49179.795.71$301,065
Sep 20214,1345,38769.865.35$317,627
Aug 20214,8135,66866.024.22$341,677
Jul 20214,45011270.783.98$315,417
Jun 202116516569.493.38$12,024
May 202102763.483.02$81
Apr 202101660.362.76$44
Mar 202102261.302.72$60
Feb 202103957.805.55$216
Jan 202102650.412.81$73
Dec 20200644.642.68$16
Nov 20200538.772.71$14
Oct 202001036.972.48$25
Sep 20200237.091.99$4
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 2020015034.901.69$254
May 20200016.921.81$0
Apr 20201,4581,23214.751.80$23,729
Mar 20201,4531,26730.341.86$46,436
Feb 20201,4581,37049.881.98$75,439
Jan 20201,9921,67357.252.09$117,547
Dec 20191,5921,73159.012.30$97,933
Nov 20191,2861,59155.302.75$75,492
Oct 20191,9711,64053.472.42$109,356
Sep 20191,8051,12955.052.66$102,365
Aug 20191,4772,03553.112.30$83,133
Jul 20191,6021,71456.272.46$94,361
Jun 20191,61856052.782.49$86,793
May 20191,64547858.482.74$97,509
Apr 20191,4332,30062.632.75$96,075
Mar 20191,7561,46656.803.06$104,230
Feb 20191,4371,62050.852.79$77,595
Jan 20191,9751,75246.033.23$96,565
Dec 20182,5041,82246.594.19$124,287
Nov 20181,7911,52152.934.24$101,242
Oct 20181,7851,50061.443.40$114,768
Sep 20181,4411,23059.543.11$89,620
Aug 20181,9511,89959.403.07$121,713
Jul 20181,6001,94565.142.93$109,927
Jun 20181,7901,65660.183.08$112,818
May 20182,1401,55565.382.90$144,424
Apr 20181,7581,98663.842.90$117,992
Mar 20181,9831,88761.222.79$126,658
Feb 20181,6161,82461.782.77$104,882
Jan 20181,9761,84462.874.01$131,624
Dec 20171,8212,00057.272.92$110,132
Nov 20171,956055.423.12$108,402
Oct 20172,0931,89649.292.98$108,821
Sep 20171,9481,89647.523.09$98,422
Aug 20171,9461,98145.373.00$94,242
Jul 20171,6041,82943.873.09$76,014
Jun 20172,3042,02042.493.09$104,133
May 20171,7732,14845.373.26$87,451
Apr 20171,7441,96847.933.21$89,910
Mar 20172,3072,31946.772.98$114,818
Feb 20171,7721,93950.452.95$95,122
Jan 20171,9842,04449.413.42$105,017
Dec 20162,3052,03248.763.72$119,957
Nov 20161,9401,98942.492.64$87,690
Oct 20162,0802,29746.193.09$103,174
Sep 20161,7502,07441.553.10$79,143
Aug 20162,1142,17541.442.92$93,965
Jul 20161,5561,90641.622.92$70,335
Jun 20162,1302,10845.352.69$102,257
May 20162,117042.521.99$90,015
Apr 20161,9522,32336.561.99$75,990
Mar 20162,2992,68333.011.79$80,703
Feb 20162,1132,17426.472.06$60,417
Jan 20162,4462,16227.352.36$72,010
Dec 20152,3092,18932.362.00$79,100
Nov 20151,7541,13938.792.17$70,506
Oct 20151,5642,31443.552.43$73,727
Sep 20152,3992,39942.992.76$109,750
Aug 20152,0372,31740.162.87$88,461
Jul 20152,7792,46048.152.95$141,054
Jun 201502,50956.152.88$7,233
May 20152,2602,42655.212.96$131,945
Apr 20152,6571,92549.822.71$137,582
Mar 20152,8722,31442.892.93$129,971
Feb 20151,7061,67444.662.98$81,172
Jan 20151,4381,13043.433.10$65,956
Dec 20142,4962,09454.693.59$144,027
Nov 20142,5112,07070.464.25$185,726
Oct 20142,5232,30478.303.90$206,539
Sep 20142,3462,32986.164.05$211,553
Aug 20142,8482,61389.394.04$265,126
Jul 20142,3162,68296.564.18$234,843
Jun 20142,5172,73098.164.74$260,000
May 20142,8722,32394.734.73$283,044
Apr 20142,8421,63395.944.81$280,515
Mar 20142,8552,74695.895.06$287,652
Feb 20142,5022,29697.406.19$257,912
Jan 20142,8342,24190.404.86$267,086
Dec 20132,1342,30391.824.35$205,972
Nov 20132,8472,50788.853.74$262,328
Oct 20132,6502,62897.423.78$268,095
Sep 20132,8602,254104.113.72$306,134
Aug 20133,0022,884104.253.52$323,118
Jul 20132,6132,818102.523.72$278,361
Jun 20132,3222,66694.403.93$229,683
May 20132,5465,92094.834.15$266,000
Apr 20132,8412,73993.964.28$278,670
Mar 20132,5432,49493.623.91$247,834
Feb 20132,1762,49091.233.42$207,032
Jan 20132,8862,89391.603.42$274,251
Dec 20122,9012,74086.773.42$261,091
Nov 20122,1592,60786.953.62$197,175
Oct 20122,8602,75389.383.40$264,986
Sep 20122,5542,94694.672.92$250,385
Aug 20122,6493,22492.662.91$254,832
Jul 20122,6863,23385.133.02$238,425
Jun 20122,7772,83179.822.52$228,792
May 20123,0093,10391.612.49$283,376
Apr 20122,4632,592101.652.00$255,540
Mar 20123,1692,979105.052.22$339,523
Feb 20122,3102,691101.102.57$240,458
Jan 20123,0232,87398.092.73$304,381
Dec 20112,6373,02896.873.24$265,256
Nov 20112,6893,00795.723.31$267,348
Oct 20112,5122,09384.983.65$221,106
Sep 20112,5264,48083.623.99$229,081
Aug 20112,5213,36183.404.15$224,197
Jul 20112,3365,09694.144.52$242,931
Jun 20112,7172,50492.904.64$264,028
May 20112,9131,11198.134.40$290,746
Apr 20113,4412,476105.964.33$375,338
Mar 20113,0742,62996.364.06$306,877
Feb 20112,3612,28285.644.18$211,735
Jan 20113,0962,56686.504.59$279,579
Dec 20102,7282,66285.734.35$245,445
Nov 20102,5422,41280.843.80$214,650
Oct 20103,0742,68878.103.51$249,511
Sep 20102,5282,45172.633.98$193,362
Aug 20102,5252,75773.684.42$198,226
Jul 20102,9032,66372.554.74$223,226
Jun 20102,4882,61070.364.91$187,872
May 20102,4902,54971.124.24$187,884
Apr 20102,7072,76681.694.12$232,538
Mar 20103,0412,70378.394.39$250,247
Feb 20102,5092,36573.585.44$197,483
Jan 20102,7032,47774.365.96$215,768
Dec 20092,9022,26071.445.48$219,712
Nov 20092,8502,48674.593.75$221,908
Oct 20092,9182,62072.544.11$222,441
Sep 20092,8662,46865.543.06$195,401
Aug 20093,0532,50067.423.22$213,880
Jul 20092,7312,72261.133.46$176,376
Jun 20092,7172,16566.163.90$188,189
May 20092,5172,69554.743.93$148,360
Apr 20093,0132,56146.773.59$150,106
Mar 20092,8711,71142.144.06$127,929
Feb 20092,8822,33832.814.63$105,390
Jan 20093,1162,56335.865.37$125,506
Dec 20083,2422,64037.105.98$136,058
Nov 20083,2462,76055.496.86$199,055
Oct 20082,9083,06675.246.92$240,021
Sep 20083,4232,143101.767.88$365,205
Aug 20083,4413,610114.228.48$423,655
Jul 20083,4353,541131.0811.39$490,590
Jun 20083,0633,295131.3313.03$445,206
May 20083,4503,658123.1711.57$467,275
Apr 20083,2373,283110.3110.45$391,397
Mar 20083,6363,031101.909.66$399,800
Feb 20083,2632,94692.538.77$327,764
Jan 20083,4122,96490.388.21$332,698
Dec 20073,3222,59388.337.30$312,366
Nov 20073,6123,02291.677.29$353,148
Oct 20073,0743,09082.856.92$276,070
Sep 20073,2472,27075.846.24$260,427
Aug 20073,2863,30769.066.39$248,056
Jul 20073,2913,38170.906.39$254,930
Jun 20073,0092,79562.007.55$207,656
May 20073,2643,31658.747.85$217,746
Apr 20073,2672,76759.617.81$216,343
Mar 20073,6343,31056.927.30$231,017
Feb 20073,1212,72855.108.22$194,380
Jan 20073,4762,54450.306.73$191,956
Dec 20063,6152,72056.656.92$223,608
Nov 20063,0371,42054.207.62$175,422
Oct 20063,0542,91954.906.01$185,219
Sep 20063,2603,04960.085.04$211,219
Aug 20063,7623,39668.717.34$283,413
Jul 20063,2263,40769.376.34$245,397
Jun 20063,2533,24666.286.38$236,331
May 20063,6003,32866.016.42$259,018
Apr 20063,0812,51064.397.36$216,860
Mar 20063,4732,68256.707.08$215,915
Feb 20063,2452,38857.597.75$205,389
Jan 20063,2822,74860.598.93$223,405
Dec 20053,6303,06754.9413.42$240,577
Nov 20053,6032,89654.6910.59$227,712
Oct 20053,0112,77758.3413.80$213,973
Sep 20053,0532,73461.4512.08$220,631
Aug 20053,2533,20961.519.80$231,530
Jul 20053,8033,25455.697.84$237,312
Jun 20053,4183,09452.337.38$201,701
May 20053,6063,25945.226.65$184,739
Apr 20053,9743,09549.207.36$218,301
Mar 20053,0702,57450.377.15$173,053
Feb 20053,2182,73145.226.31$162,756
Jan 20053,5563,07043.166.32$172,886
Dec 20044,3122,99939.866.75$192,123
Nov 20042,6382,63845.286.33$136,148
Oct 20043,0681,95149.706.52$165,191
Sep 20042,9772,78543.245.28$143,441
Aug 20043,2013,29242.375.55$153,899
Jul 20043,1272,96838.286.08$137,759
Jun 20043,0223,06736.106.43$128,824
May 20043,2113,37237.486.49$142,248
Apr 20043,4013,16734.475.86$135,786
Mar 20042,9042,78434.365.53$115,177
Feb 20043,1112,73532.455.51$116,021
Jan 20043,7283,04932.036.30$138,615
Dec 20033,3833,20830.266.30$122,585
Nov 20033,5683,05028.804.60$116,774
Oct 20033,1893,47028.174.76$106,350
Sep 20033,3293,55126.314.75$104,451
Aug 20033,5493,70429.765.13$124,619
Jul 20033,7153,58929.415.17$127,816
Jun 20033,5113,75328.565.98$122,728
May 20033,3523,81526.595.97$111,915
Apr 20033,7292,97426.675.41$115,534
Mar 20033,9713,56731.146.10$145,402
Feb 20033,0082,48833.487.93$120,427
Jan 20033,3542,95130.315.58$118,132
Dec 20022,4442,19926.914.85$76,441
Nov 20023,1842,68024.664.14$89,604
Oct 20023,1493,05626.464.23$96,247
Sep 20023,7033,54127.443.64$114,483
Aug 20023,1182,96525.963.16$90,325
Jul 20023,3313,39624.583.06$92,274
Jun 20023,1442,10723.733.34$81,641
May 20022,7503,29624.663.58$79,628
Apr 20023,1922,97323.653.51$85,933
Mar 20022,7852,79622.003.10$69,945
Feb 20023,3783,08018.222.38$68,864
Jan 20023,6273,54117.172.38$70,688
Dec 20014,3364,10116.932.36$83,105
Nov 20013,8073,67418.072.41$77,630
Oct 20014,1444,35419.782.53$92,979
Sep 20013,7014,58624.262.25$100,111
Aug 20013,8984,81424.873.05$111,641
Jul 20014,0725,34323.933.20$114,525
Jun 20014,0685,05724.563.82$119,249
May 20014,0484,20825.524.31$121,430
Apr 20013,5444,07924.685.34$109,229
Mar 20014,3174,31624.545.38$129,144
Feb 20013,0173,07627.755.77$101,461
Jan 20013,0222,68827.478.40$105,590
Dec 20003,2331,99626.889.12$105,112
Nov 20003,0482,14532.215.66$110,312
Oct 20002,7982,43431.235.15$99,906
Sep 20003,1502,69631.875.19$114,373
Aug 20002,8102,52729.644.54$94,763
Jul 20002,9772,40128.534.09$94,753
Jun 20002,9452,68529.304.40$98,095
May 20003,1422,26927.263.68$94,000
Apr 20003,1592,73124.513.12$85,937
Mar 20003,2762,69628.422.86$100,814
Feb 20003,3072,49527.622.73$98,142
Jan 20003,1582,37925.272.48$85,704
Dec 19993,1372,22124.282.42$81,549
Nov 19993,3502,55423.192.43$83,903
Oct 19993,0202,61520.982.80$70,691
Sep 19992,9832,99321.752.62$72,718
Aug 19993,3583,25519.262.88$74,035
Jul 19993,1732,99817.892.37$63,877
Jun 19992,8132,64915.942.36$51,096
May 19993,5052,89415.792.32$62,061
Apr 19992,8232,62315.102.21$48,419
Mar 19993,1592,55612.471.84$44,092
Feb 19992,8139,7949.981.82$45,877
Jan 19993,1622,53210.381.90$37,632
Dec 19983,3362,5119.201.77$35,144
Nov 19983,1502,60710.892.19$40,002
Oct 19983,3022,94212.421.97$46,804
Sep 19983,1152,92012.592.08$45,299
Aug 19983,2273,22111.301.91$42,609
Jul 19983,0833,32811.742.24$43,640
Jun 19983,2543,17511.242.24$43,678
May 19983,2643,25012.622.21$48,362
Apr 19983,2263,01113.042.51$49,611
Mar 19983,3352,95612.802.31$49,515
Feb 19983,0942,61713.952.30$49,178
Jan 19983,6092,82514.702.15$59,140
Dec 19973,3242,69516.322.41$60,746
Nov 19973,1462,73518.193.09$65,672
Oct 19973,8232,42619.253.15$81,234
Sep 19972,8843,20817.742.95$60,641
Aug 19973,1263,81917.862.55$65,587
Jul 19973,3392,79717.582.25$64,984
Jun 19973,2153,45317.242.26$63,221
May 19973,2482,98018.972.31$68,494
Apr 19973,1182,94117.882.08$61,875
Mar 19973,3003,00118.951.94$68,354
Feb 19973,6992,61720.492.21$81,565
Jan 19972,5962,23423.483.54$68,862
Dec 19963,4902,39823.32$81,387
Nov 19963,5323,27421.97$77,598
Oct 19963,6273,57023.31$84,545
Sep 19963,0762,89022.22$68,349
Aug 19963,0753,37720.26$62,300
Jul 19963,3473,57719.55$65,434
Jun 19963,0383,38618.73$56,902
May 19963,3763,71719.43$65,596
Apr 19963,3463,50421.51$71,972
Mar 19963,7483,33119.38$72,636
Feb 19963,4153,00316.98$57,987
Jan 19963,2502,84717.07$55,478
Dec 19953,4483,22517.19$59,271
Nov 19952,9693,21216.00$47,504
Oct 19953,2193,51115.43$49,669
Sep 19953,7373,55916.18$60,465
Aug 19953,1863,84915.92$50,721
Jul 19953,0423,80115.24$46,360
Jun 19953,3703,07216.41$55,302
May 19953,3912,96317.56$59,546
Apr 19953,5793,99417.73$63,456
Mar 19953,6023,63116.44$59,217
Feb 19953,0893,47816.58$51,216
Jan 19953,9323,42615.92$62,597
Dec 19943,7464,10415.03$56,302
Nov 19943,5943,58115.90$57,145
Oct 19943,5743,89115.58$55,683
Sep 19943,0253,17815.29$46,252
Aug 19942,9693,37316.13$47,890
Jul 19943,3883,67617.56$59,493
Jun 19943,2113,71017.09$54,876
May 19943,1673,55115.88$50,292
Apr 19943,1813,43714.14$44,979
Mar 19943,9333,52712.46$49,005
Feb 19942,8613,03112.50$35,763
Jan 19943,5682,71812.66$45,171
Dec 19933,8693,57412.33$47,705
Nov 19932,7003,11714.49$39,123
Oct 19933,5753,79915.85$56,664
Sep 19933,0533,58215.03$45,887
Aug 19933,3583,95415.66$52,586
Jul 19933,3863,75315.46$52,348
Jun 19933,5073,70116.79$58,883
May 19933,3793,49217.68$59,741
Apr 19933,7473,67518.05$67,633
Mar 19933,1903,11418.14$57,867
Feb 19933,2313,24117.90$57,835
Jan 19933,6043,34916.93$61,016

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                1,797 bbl  × $106.41 =   $191,219
Casinghead gas     1,474 Mcf  × $  3.05 =     $4,490

────────────────────────────────────────────────────
Month total                                 $195,708

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/20639 is the state's own key, not one this site invented.