MARCHBANKS UNIT

Operated by HANNATHON PETROLEUM, LLC (P-5 354954) in the HUTTO, SOUTH (WOLFCAMP) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 21251District 08Field 43926600Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$327 k
Jan 1993 – Aug 2016
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
284
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 38 leases and 49 wells, and the rule below applies to all of them.

Discovered
1964-02-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1998-06-01.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition5,683 bbl$192,866
Casinghead gasProduction32,298 Mcf$134,414
Total$327,279

48 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2584, -101.3674. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.25835, -101.36741 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,430 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,430 ft.

Completions filed
Aug 2016
1 of 1 wells

1 well

42-2273004819,430 ftAug 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (284)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

284 months

Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 2016186042.521.99$7,909
Apr 2016015736.561.99$313
Mar 2016015733.011.79$282
Feb 2016010826.472.06$223
Jan 201608827.352.36$208
Dec 201508032.362.00$160
Nov 201509438.792.17$204
Oct 2015013143.552.43$318
Sep 201509842.992.76$270
Aug 2015016240.162.87$465
Jul 2015023448.152.95$689
Jun 2015027956.152.88$804
May 2015034355.212.96$1,014
Apr 2015035549.822.71$961
Mar 2015026842.892.93$787
Feb 2015027344.662.98$813
Jan 2015032343.433.10$1,002
Dec 2014027954.693.59$1,002
Nov 2014021570.464.25$914
Oct 201405178.303.90$199
Sep 20140286.164.05$8
Aug 20140089.394.04$0
Jul 201409596.564.18$397
Jun 2014022198.164.74$1,047
May 2014023294.734.73$1,097
Apr 2014022095.944.81$1,058
Mar 2014021995.895.06$1,107
Feb 2014019997.406.19$1,232
Jan 2014023290.404.86$1,128
Dec 2013022791.824.35$988
Nov 2013021288.853.74$793
Oct 2013022297.423.78$839
Sep 20130202104.113.72$751
Aug 20130214104.253.52$754
Jul 20130236102.523.72$877
Jun 2013023394.403.93$916
May 2013025594.834.15$1,058
Apr 2013022893.964.28$976
Mar 2013020193.623.91$786
Feb 2013023291.233.42$793
Jan 2013025091.603.42$855
Dec 2012026286.773.42$896
Nov 2012028086.953.62$1,015
Oct 2012028389.383.40$962
Sep 2012025694.672.92$747
Aug 2012028192.662.91$817
Jul 2012028685.133.02$864
Jun 2012029379.822.52$738
May 2012033691.612.49$836
Apr 20120345101.652.00$689
Mar 20120369105.052.22$820
Feb 20122346101.102.57$1,092
Jan 20125098.092.73$490
Dec 2011533996.873.24$1,583
Nov 201115522995.723.31$15,595
Oct 2011047884.983.65$1,744
Sep 2011052583.623.99$2,093
Aug 2011045583.404.15$1,888
Jul 2011050594.144.52$2,281
Jun 2011059992.904.64$2,779
May 2011037398.134.40$1,643
Apr 20110473105.964.33$2,050
Mar 2011056396.364.06$2,284
Feb 2011050785.644.18$2,119
Jan 2011057786.504.59$2,648
Dec 2010057285.734.35$2,487
Nov 2010056080.843.80$2,125
Oct 2010058578.103.51$2,053
Sep 201016153072.633.98$13,803
Aug 2010054373.684.42$2,400
Jul 2010055772.554.74$2,638
Jun 2010055370.364.91$2,715
May 2010059771.124.24$2,528
Apr 2010046181.694.12$1,901
Mar 2010057178.394.39$2,506
Feb 2010052673.585.44$2,863
Jan 2010058374.365.96$3,477
Dec 2009058271.445.48$3,192
Nov 2009057274.593.75$2,146
Oct 2009060772.544.11$2,495
Sep 2009057965.543.06$1,774
Aug 200917356567.423.22$13,482
Jul 2009065261.133.46$2,259
Jun 2009069666.163.90$2,711
May 2009055054.743.93$2,159
Apr 2009025046.773.59$897
Mar 2009022542.144.06$913
Feb 2009019032.814.63$880
Jan 2009059435.865.37$3,190
Dec 2008058337.105.98$3,485
Nov 200817858955.496.86$13,918
Oct 2008058775.246.92$4,063
Sep 20080357101.767.88$2,812
Aug 20080508114.228.48$4,309
Jul 200801131.0811.39$11
Jun 200801131.3313.03$13
May 200801123.1711.57$12
Apr 200801110.3110.45$10
Mar 200801101.909.66$10
Feb 20080192.538.77$9
Jan 20080190.388.21$8
Dec 20070188.337.30$7
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 2007160169.066.39$11,056
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 2007172150.306.73$8,658
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 2006141164.397.36$9,086
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 2005137158.3413.80$8,006
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 2005154149.207.36$7,584
Mar 20050150.377.15$7
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 2004132149.706.52$6,567
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 2004161138.286.08$6,169
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 2004123134.475.86$4,246
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 200386130.266.30$2,609
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 2003152126.314.75$4,004
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 2003130126.595.97$3,463
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 200284124.664.14$2,076
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 200253125.963.16$1,379
Jul 20020124.583.06$3
Jun 200255123.733.34$1,308
May 20020124.663.58$4
Apr 200284123.653.51$1,990
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 2002130117.172.38$2,234
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 20010124.262.25$2
Aug 200160124.873.05$1,495
Jul 20010123.933.20$3
Jun 20010124.563.82$4
May 20010125.524.31$4
Apr 200175124.685.34$1,856
Mar 20010124.545.38$5
Feb 200187127.755.77$2,420
Jan 20010127.478.40$8
Dec 200064126.889.12$1,729
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 200078131.875.19$2,491
Aug 20000129.644.54$5
Jul 200078128.534.09$2,229
Jun 20000129.304.40$4
May 200086127.263.68$2,348
Apr 20000124.513.12$3
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 2000165125.272.48$4,172
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999119.981.82$12
Jan 19991110.381.90$12
Dec 1998219.201.77$20
Nov 19983110.892.19$35
Oct 19980112.421.97$2
Sep 19981112.592.08$15
Aug 19981111.301.91$13
Jul 1998138111.742.24$1,622
Jun 19981111.242.24$13
May 19981112.622.21$15
Apr 19983113.042.51$42
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 19970116.322.41$2
Nov 19970118.193.09$3
Oct 19970119.253.15$3
Sep 1997108117.742.95$1,919
Aug 19970117.862.55$3
Jul 19970117.582.25$2
Jun 1997151117.242.26$2,606
May 19970118.972.31$2
Apr 19970117.882.08$2
Mar 19970118.951.94$2
Feb 19970120.492.21$2
Jan 1997148123.483.54$3,479
Dec 19960123.32$0
Nov 19960121.97$0
Oct 19960123.31$0
Sep 1996133122.22$2,955
Aug 19960120.26$0
Jul 19960119.55$0
Jun 19960118.73$0
May 1996152119.43$2,953
Apr 19960121.51$0
Mar 19960119.38$0
Feb 19960116.98$0
Jan 1996129117.07$2,202
Dec 19950117.19$0
Nov 19950116.00$0
Oct 1995132115.43$2,037
Sep 19950116.18$0
Aug 19950115.92$0
Jul 1995111115.24$1,692
Jun 19950116.41$0
May 19950117.56$0
Apr 19950117.73$0
Mar 1995152116.44$2,499
Feb 19950116.58$0
Jan 19950115.92$0
Dec 19940115.03$0
Nov 19940115.90$0
Oct 1994143115.58$2,228
Sep 19940115.29$0
Aug 19940116.13$0
Jul 19940117.56$0
Jun 19940117.09$0
May 1994149115.88$2,366
Apr 19940114.14$0
Mar 19940112.46$0
Feb 19940112.50$0
Jan 1994153112.66$1,937
Dec 19930112.33$0
Nov 19930114.49$0
Oct 19930115.85$0
Sep 19930115.03$0
Aug 1993110115.66$1,723
Jul 19930115.46$0
Jun 19930116.79$0
May 1993135117.68$2,387
Apr 19930118.05$0
Mar 19930118.14$0
Feb 19930117.90$0
Jan 1993113116.93$1,913

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2016 — as filed, then multipliedworked
Oil                  186 bbl  × $ 42.52 =     $7,909
Casinghead gas         0 Mcf  × $  1.99 =         $0

────────────────────────────────────────────────────
Month total                                   $7,909

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/21251 is the state's own key, not one this site invented.