MOSS, J. H. "B"

Operated by GRUY PETROLEUM MANAGEMENT CO. (P-5 337106) in the KEYSTONE (SAN ANDRES) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23081District 08Field 49129594Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$1.4 M
Jan 1993 – Apr 2002
Value, last 12 filed months
$69 k
at the published price for each month
Months reported
112
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 65 leases and 165 wells, and the rule below applies to all of them.

Discovered
1960-07-05
as the register files it
Field class
Oil
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1994-10-31.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: 4. ALLOCATION BASED ON 100% ACREAGE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition60,320 bbl$1,120,525
Casinghead gasProduction151,510 Mcf$251,885
Total$1,372,410

66,314 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9448, -103.0023. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

31.94402, -103.00438 · centre of 1 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
6,834 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 5,172 and 8,496 ft, median 6,834 ft, over the 2 wells that filed a depth.

Completions filed
Aug 1995 – May 1996
2 of 2 wells

2 wells

42-495303472 X5,172 ftMay 1996Yes
42-4950576018,496 ftAug 1995Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (112)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

112 months

Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20012981,23716.932.36$7,970
Nov 20012571,37518.072.41$7,952
Oct 20012171,19119.782.53$7,304
Sep 20012391,22924.262.25$8,565
Aug 20011661,15724.873.05$7,661
Jul 20012271,18223.933.20$9,211
Jun 20012541,11224.563.82$10,491
May 20011891,10025.524.31$9,561
Apr 20012431,06124.685.34$11,658
Mar 20012741,20224.545.38$13,186
Feb 20012631,07227.755.77$13,481
Jan 20013111,21327.478.40$18,731
Dec 20002271,06926.889.12$15,854
Nov 200022098932.215.66$12,682
Oct 20002261,20731.235.15$13,269
Sep 20002461,13431.875.19$13,722
Aug 20002711,20929.644.54$13,522
Jul 20001861,12128.534.09$9,891
Jun 20001911,14429.304.40$10,627
May 20002821,23627.263.68$12,235
Apr 20003321,20624.513.12$11,895
Mar 20003281,24628.422.86$12,885
Feb 200024095927.622.73$9,244
Jan 20003461,13425.272.48$11,556
Dec 19992891,06524.282.42$9,598
Nov 19993761,23123.192.43$11,716
Oct 19993101,20720.982.80$9,888
Sep 19993111,08121.752.62$9,595
Aug 19993741,26319.262.88$10,835
Jul 19993511,19217.892.37$9,107
Jun 19993521,22715.942.36$8,509
May 19993751,22015.792.32$8,753
Apr 19993981,13615.102.21$8,518
Mar 19993411,25712.471.84$6,563
Feb 19994331,1379.981.82$6,388
Jan 19994011,28710.381.90$6,608
Dec 19984461,3299.201.77$6,460
Nov 19984301,36110.892.19$7,657
Oct 19985601,56312.421.97$10,033
Sep 19983691,41712.592.08$7,597
Aug 19984871,41311.301.91$8,198
Jul 19983701,14711.742.24$6,910
Jun 199824577911.242.24$4,497
May 19984971,65612.622.21$9,926
Apr 19986361,62213.042.51$12,357
Mar 19987851,86612.802.31$14,357
Feb 19987811,67913.952.30$14,755
Jan 19989641,89814.702.15$18,261
Dec 19979932,15416.322.41$21,399
Nov 19975951,12018.193.09$14,282
Oct 19975991,39619.253.15$15,928
Sep 19976001,56617.742.95$15,271
Aug 19976451,49817.862.55$15,347
Jul 19979332,19417.582.25$21,332
Jun 19971,1852,71217.242.26$26,551
May 19971,0832,57718.972.31$26,494
Apr 19971,3872,56417.882.08$30,140
Mar 19971,2602,58118.951.94$28,882
Feb 19971,1112,26620.492.21$27,763
Jan 19971,5442,75023.483.54$45,987
Dec 19961,4122,59823.32$32,928
Nov 19961,2782,42921.97$28,078
Oct 19961,5342,91523.31$35,758
Sep 19961,4412,42022.22$32,019
Aug 19961,8863,32820.26$38,210
Jul 19962,2043,90819.55$43,088
Jun 19961,8883,31618.73$35,362
May 19961,7243,03319.43$33,497
Apr 19962,0713,35321.51$44,547
Mar 19964753,18419.38$9,206
Feb 19965432,89516.98$9,220
Jan 19962781,16117.07$4,745
Dec 19951,4912,33117.19$25,630
Nov 19951,2851,92016.00$20,560
Oct 19952,0162,69915.43$31,107
Sep 19955523,02416.18$8,931
Aug 19956663,05015.92$10,603
Jul 19956152,33015.24$9,373
Jun 19959591,99916.41$15,737
May 199540370017.56$7,077
Apr 199542064917.73$7,447
Mar 199540747416.44$6,691
Feb 199524553516.58$4,062
Jan 199527856215.92$4,426
Dec 199427757615.03$4,163
Nov 199430658915.90$4,865
Oct 199422847815.58$3,552
Sep 199428542915.29$4,358
Aug 199418838016.13$3,032
Jul 199421458417.56$3,758
Jun 199421660517.09$3,691
May 199425058015.88$3,970
Apr 199416957014.14$2,390
Mar 199424761312.46$3,078
Feb 199424657212.50$3,075
Jan 199417356412.66$2,190
Dec 199322156312.33$2,725
Nov 199317049214.49$2,463
Oct 199319247415.85$3,043
Sep 199319956415.03$2,991
Aug 199319960615.66$3,116
Jul 199322558515.46$3,479
Jun 199319862516.79$3,324
May 199319855317.68$3,501
Apr 19932562018.05$4,621
Mar 19932521218.14$4,571
Feb 19932318917.90$4,135
Jan 199326037816.93$4,402

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2001 — as filed, then multipliedworked
Oil                  298 bbl  × $ 16.93 =     $5,045
Casinghead gas     1,237 Mcf  × $  2.36 =     $2,925

────────────────────────────────────────────────────
Month total                                   $7,970

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/23081 is the state's own key, not one this site invented.