Operated by SUNERGON OIL OPERATING, LLC (P-5 829285) in the WHEAT field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25166District 08Field 96742001NGPA filingOilCasinghead gasSaveExport
Value, all time
$5.6 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 142 leases and 286 wells, and the rule below applies to all of them.

Discovered
1925-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA5none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition116,145 bbl$4,762,656
Casinghead gasProduction270,219 Mcf$873,854
Total$5,636,510

77,519 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (4)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7687, -103.5360. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

31.76930, -103.53594 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
25.0%
1 of 4 wells
With a plug date
25.0%
1 of 4 wells
Median depth
5,650 ft
4 wells filed one
Completion to plug
41.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
125.0%
A plug date is filed
125.0%
BothOn the schedule and plugged. Neither fact cancels the other.
125.0%
NeitherNo plug date, and not on the schedule.
375.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,665 and 7,100 ft, median 5,650 ft, over the 4 wells that filed a depth.

Completions filed
Sep 1978 – Jul 1983
4 of 4 wells
Plug dates filed
Nov 2024
1 of 4 wells; 3 filed none

Last completion to plug: a median of 41.3 years across the 1 well that filed both dates, with the middle half between 41.3 years and 41.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

4 wells

42-3013041446,500 ftJul 1983Nov 2024Yes
42-3013029134,800 ftSep 1981
42-301302152U7,100 ftFeb 1979
42-3013021214,665 ftSep 1978

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 2024478073.023.30$34,904
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 2023347078.122.24$27,108
Mar 2023333072.852.39$24,259
Feb 2023322075.112.47$24,185
Jan 2023172076.533.39$13,163
Dec 2022307076.415.73$23,458
Nov 2022181085.005.65$15,385
Oct 2022151087.185.86$13,164
Sep 20220084.888.16$0
Aug 2022252094.529.13$23,819
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 20221660104.226.84$17,301
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 2021343071.323.90$24,463
Nov 2021169077.435.24$13,086
Oct 2021170079.795.71$13,564
Sep 2021174069.865.35$12,156
Aug 2021347066.024.22$22,909
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 2021299057.805.55$17,282
Jan 2021530050.412.81$26,717
Dec 2020701044.642.68$31,293
Nov 2020713038.772.71$27,643
Oct 2020686036.972.48$25,361
Sep 2020131037.091.99$4,859
Aug 2020599039.982.39$23,948
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 2020274049.881.98$13,667
Jan 2020176057.252.09$10,076
Dec 2019184059.012.30$10,858
Nov 2019370055.302.75$20,461
Oct 2019179053.472.42$9,571
Sep 2019359055.052.66$19,763
Aug 20190053.112.30$0
Jul 2019169056.272.46$9,510
Jun 20190052.782.49$0
May 2019349058.482.74$20,410
Apr 2019196062.632.75$12,275
Mar 2019183056.803.06$10,394
Feb 20190050.852.79$0
Jan 2019614046.033.23$28,262
Dec 2018175046.594.19$8,153
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 2018181059.543.11$10,777
Aug 2018177059.403.07$10,514
Jul 2018175065.142.93$11,400
Jun 20180060.183.08$0
May 201816321765.382.90$11,286
Apr 201818961163.842.90$13,838
Mar 201815717661.222.79$10,102
Feb 201817444461.782.77$11,978
Jan 201817840662.874.01$12,819
Dec 2017039957.272.92$1,166
Nov 20173596955.423.12$20,111
Oct 2017014449.292.98$430
Sep 201717426647.523.09$9,090
Aug 201718132045.373.00$9,173
Jul 201717735943.873.09$8,873
Jun 201717339942.493.09$8,583
May 201717518345.373.26$8,537
Apr 201717828447.933.21$9,444
Mar 201717146646.772.98$9,388
Feb 201717523550.452.95$9,523
Jan 20171823349.413.42$9,105
Dec 2016177048.763.72$8,631
Nov 2016353942.492.64$15,023
Oct 2016170046.193.09$7,852
Sep 2016178041.553.10$7,396
Aug 2016178041.442.92$7,376
Jul 2016178041.622.92$7,408
Jun 2016172845.352.69$7,822
May 2016033542.521.99$667
Apr 201634820236.561.99$13,125
Mar 2016021033.011.79$377
Feb 201615931626.472.06$4,861
Jan 2016054627.352.36$1,291
Dec 201518028632.362.00$6,397
Nov 2015073938.792.17$1,602
Oct 20150043.552.43$0
Sep 201517811542.992.76$7,969
Aug 2015023140.162.87$664
Jul 201517610248.152.95$8,775
Jun 2015029356.152.88$845
May 201516613955.212.96$9,576
Apr 2015044749.822.71$1,210
Mar 201538913342.892.93$17,075
Feb 2015042044.662.98$1,250
Jan 201516828643.433.10$8,183
Dec 201433836454.693.59$19,792
Nov 201403570.464.25$149
Oct 201437717978.303.90$30,217
Sep 2014049586.164.05$2,002
Aug 201440064489.394.04$38,355
Jul 20142475196.564.18$5,456
Jun 2014011898.164.74$559
May 201417262294.734.73$19,233
Apr 201418022695.944.81$18,356
Mar 201417833095.895.06$18,737
Feb 201437524997.406.19$38,067
Jan 2014019390.404.86$938
Dec 2013032891.824.35$1,428
Nov 201317925888.853.74$16,869
Oct 201318053797.423.78$19,565
Sep 2013352274104.113.72$37,665
Aug 2013521479104.253.52$56,002
Jul 2013177381102.523.72$19,563
Jun 201320364394.403.93$21,692
May 201320149894.834.15$21,127
Apr 201334643893.964.28$34,386
Mar 201338160993.623.91$38,052
Feb 201334040191.233.42$32,390
Jan 2013033791.603.42$1,153
Dec 201234139386.773.42$30,933
Nov 201216231986.953.62$15,242
Oct 201248556689.383.40$45,274
Sep 2012057494.672.92$1,675
Aug 201220255692.662.91$20,334
Jul 201216855085.133.02$15,963
Jun 201254252579.822.52$44,585
May 201219757091.612.49$19,466
Apr 20120502101.652.00$1,002
Mar 2012342555105.052.22$37,160
Feb 2012332583101.102.57$35,064
Jan 201233654598.092.73$34,448
Dec 201117657196.873.24$18,899
Nov 201135757695.723.31$36,079
Oct 201117357584.983.65$16,799
Sep 201134946683.623.99$31,041
Aug 201131881483.404.15$29,899
Jul 201133856594.144.52$34,372
Jun 201117867592.904.64$19,668
May 201135480098.134.40$38,262
Apr 2011174480105.964.33$20,517
Mar 201135260296.364.06$36,361
Feb 201118050685.644.18$17,530
Jan 2011072886.504.59$3,341
Dec 201049559185.734.35$45,006
Nov 201035364180.843.80$30,969
Oct 201017269078.103.51$15,854
Sep 201033865372.633.98$27,148
Aug 201035161273.684.42$28,566
Jul 201033365172.554.74$27,243
Jun 201036667570.364.91$29,066
May 201016973971.124.24$15,149
Apr 201035177581.694.12$31,868
Mar 201033183978.394.39$29,629
Feb 201017172373.585.44$16,517
Jan 201034993874.365.96$31,546
Dec 200917078771.445.48$16,461
Nov 200933950374.593.75$27,173
Oct 2009060772.544.11$2,495
Sep 200916210465.543.06$10,936
Aug 200933662267.423.22$24,655
Jul 200916656261.133.46$12,095
Jun 200932855166.163.90$23,847
May 200933560254.743.93$20,701
Apr 200916963046.773.59$10,164
Mar 200916668742.144.06$9,784
Feb 200933168232.814.63$14,020
Jan 200916665435.865.37$9,465
Dec 200848867337.105.98$22,127
Nov 200833774555.496.86$23,811
Oct 200817089275.246.92$18,965
Sep 2008171270101.767.88$19,528
Aug 2008329555114.228.48$42,286
Jul 2008339669131.0811.39$52,056
Jun 2008164570131.3313.03$28,967
May 2008324658123.1711.57$47,523
Apr 2008485719110.3110.45$61,017
Mar 2008329742101.909.66$40,696
Feb 2008078392.538.77$6,867
Jan 200836057890.388.21$37,280
Dec 200733070088.337.30$34,260
Nov 200736370191.677.29$38,388
Oct 200735979182.856.92$35,218
Sep 200718262875.846.24$17,724
Aug 200735674569.066.39$29,344
Jul 200735676970.906.39$30,153
Jun 200735381162.007.55$28,008
May 200735974058.747.85$26,894
Apr 2007067759.617.81$5,284
Mar 200717659956.927.30$14,392
Feb 200735943455.108.22$23,347
Jan 2007055450.306.73$3,727
Dec 200635182056.656.92$25,557
Nov 200618047854.207.62$13,397
Oct 200635883254.906.01$24,658
Sep 200618383260.085.04$15,186
Aug 200653086368.717.34$42,751
Jul 20061761,14969.376.34$19,497
Jun 2006027366.286.38$1,743
May 200635672066.016.42$28,126
Apr 200616778464.397.36$16,524
Mar 200618086756.707.08$16,347
Feb 200635376057.597.75$26,220
Jan 200618075860.598.93$17,678
Dec 200536181454.9413.42$30,753
Nov 200536183254.6910.59$28,553
Oct 200535894758.3413.80$33,950
Sep 200517679561.4512.08$20,418
Aug 20053281,05361.519.80$30,491
Jul 200535596155.697.84$27,308
Jun 200517575352.337.38$14,716
May 200517583945.226.65$13,494
Apr 200535893349.207.36$24,481
Mar 200554090350.377.15$33,661
Feb 200536679145.226.31$21,543
Jan 200536191843.166.32$21,385
Dec 200435795039.866.75$20,644
Nov 200451293445.286.33$29,096
Oct 20041791,02949.706.52$15,600
Sep 200434390543.245.28$19,613
Aug 20043531,16242.375.55$21,406
Jul 200435985038.286.08$18,914
Jun 20043421,04936.106.43$19,094
May 20043341,22437.486.49$20,468
Apr 20045101,02834.475.86$23,602
Mar 20043311,17434.365.53$17,866
Feb 20041811,03832.455.51$11,592
Jan 20047161,05932.036.30$29,605
Dec 20033651,04430.266.30$17,624
Nov 20033621,07128.804.60$15,347
Oct 20033211,16328.174.76$14,578
Sep 20035321,16926.314.75$19,549
Aug 20033631,31929.765.13$17,569
Jul 20033551,04529.415.17$15,844
Jun 200335672028.565.98$14,475
May 20031811,26726.595.97$12,380
Apr 200335990926.675.41$14,490
Mar 20035381,14431.146.10$23,727
Feb 200351792333.487.93$24,625
Jan 200334197330.315.58$15,767
Dec 200250386726.914.85$17,744
Nov 200233393024.664.14$12,059
Oct 20023531,01926.464.23$13,650
Sep 20025341,03927.443.64$18,430
Aug 20025371,14325.963.16$17,557
Jul 20023461,08224.583.06$11,818
Jun 20023571,08723.733.34$12,100
May 20025261,17624.663.58$17,186
Apr 20023531,04423.653.51$12,015
Mar 200271197122.003.10$18,655
Feb 2002087318.222.38$2,074
Jan 200254089417.172.38$11,396
Dec 200135499616.932.36$8,348
Nov 20013571,03718.072.41$8,946
Oct 20013651,17719.782.53$10,196
Sep 20013591,09724.262.25$11,179
Aug 20017051,30524.873.05$21,518
Jul 20011781,07823.933.20$7,706
Jun 200135682724.563.82$11,906
May 20015381,13125.524.31$18,601
Apr 20013541,09624.685.34$14,584
Mar 20015441,05124.545.38$19,000
Feb 200135992427.755.77$15,291
Jan 200136098927.478.40$18,196
Dec 200054498126.889.12$23,572
Nov 20003661,05332.215.66$17,747
Oct 20005441,13231.235.15$22,814
Sep 20005381,14831.875.19$23,100
Aug 20001801,26429.644.54$11,075
Jul 20004991,19428.534.09$19,120
Jun 20003561,27329.304.40$16,029
May 20005361,40327.263.68$19,774
Apr 20003481,01224.513.12$11,683
Mar 20005431,14928.422.86$18,718
Feb 20003661,07627.622.73$13,043
Jan 20005501,13525.272.48$16,714
Dec 19993681,26824.282.42$12,008
Nov 199952676423.192.43$14,058
Oct 19991851,22120.982.80$7,305
Sep 19995421,27921.752.62$15,138
Aug 19995511,18319.262.88$14,014
Jul 19991801,28717.892.37$6,273
Jun 19993571,32515.942.36$8,820
May 19995401,27415.792.32$11,484
Apr 19993601,19915.102.21$8,083
Mar 19995411,24812.471.84$9,041
Feb 19995441,1329.981.82$7,487
Jan 19995471,22310.381.90$8,002
Dec 19985461,1289.201.77$7,024
Nov 19983611,16310.892.19$6,473
Oct 19985451,29712.421.97$9,323
Sep 19983591,09912.592.08$6,809
Aug 19986341,36711.301.91$9,772
Jul 19983581,17911.742.24$6,841
Jun 19983571,23611.242.24$6,778
May 19985371,26312.622.21$9,564
Apr 19985401,21413.042.51$10,083
Mar 19985441,28712.802.31$9,935
Feb 19985461,09713.952.30$10,139
Jan 19985461,27814.702.15$10,780
Dec 19975421,23416.322.41$11,821
Nov 19975421,23818.193.09$13,682
Oct 19973571,25519.253.15$10,825
Sep 19973591,17517.742.95$9,841
Aug 19975331,76217.862.55$14,021
Jul 19973531,16517.582.25$8,823
Jun 19973571,14417.242.26$8,737
May 19977181,58018.972.31$17,268
Apr 19973591,32417.882.08$9,177
Mar 19977061,44418.951.94$16,179
Feb 19973651,33220.492.21$10,417
Jan 19973601,22523.483.54$12,789
Dec 19965421,21823.32$12,639
Nov 19965451,28221.97$11,974
Oct 19965421,43123.31$12,634
Sep 19965421,48222.22$12,043
Aug 19965371,49920.26$10,880
Jul 19967041,61819.55$13,763
Jun 19965361,63718.73$10,039
May 19965381,42119.43$10,453
Apr 19963551,43121.51$7,636
Mar 19967201,39419.38$13,954
Feb 19965421,33916.98$9,203
Jan 19967271,43217.07$12,410
Dec 19955451,49517.19$9,369
Nov 19955471,43616.00$8,752
Oct 19953651,32515.43$5,632
Sep 19957241,29316.18$11,714
Aug 19955451,49915.92$8,676
Jul 19953671,36615.24$5,593
Jun 19955441,44516.41$8,927
May 19957261,53017.56$12,749
Apr 19953641,44117.73$6,454
Mar 19955471,48416.44$8,993
Feb 19953651,36316.58$6,052
Jan 19957271,50515.92$11,574
Dec 19945441,58915.03$8,176
Nov 19945451,52915.90$8,666
Oct 19945421,65415.58$8,444
Sep 19945431,68415.29$8,302
Aug 19945421,78016.13$8,742
Jul 19945451,72017.56$9,570
Jun 19945441,68917.09$9,297
May 19945461,65515.88$8,670
Apr 19945421,66014.14$7,664
Mar 19947261,70212.46$9,046
Feb 19943651,57612.50$4,563
Jan 19947241,76212.66$9,166
Dec 19934741,81912.33$5,844
Nov 19935411,86114.49$7,839
Oct 19933641,98415.85$5,769
Sep 19937291,87015.03$10,957
Aug 19935401,75815.66$8,456
Jul 19937291,96615.46$11,270
Jun 19933651,98416.79$6,128
May 19937272,18817.68$12,853
Apr 19937241,98418.05$13,068
Mar 19935471,90318.14$9,923
Feb 19935441,91117.90$9,738
Jan 19935411,92516.93$9,159

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2024 — as filed, then multipliedworked
Oil                  478 bbl  × $ 73.02 =    $34,904
Casinghead gas         0 Mcf  × $  3.30 =         $0

────────────────────────────────────────────────────
Month total                                  $34,904

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/25166 is the state's own key, not one this site invented.