Operated by DIAMONDBACK E&P LLC (P-5 217012) in the SPRABERRY (TREND AREA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25960District 08Field 85280300OilCasinghead gasSaveExport
Value, all time
$700 k
Jan 1993 – Mar 2018
Value, last 12 filed months
$0
at the published price for each month
Months reported
303
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 16,587 leases and 43,997 wells, and the rule below applies to all of them.

Discovered
1952-12-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2018-02-13.

The Commission's schedule remark for this field reads: SPRABERRY (TREND AREA) FIELD EFFECTIVE 10/1/2019.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition15,292 bbl$637,788
Casinghead gasProduction22,090 Mcf$62,182
Total$699,970

8,949 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8530, -101.7203. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85297, -101.72031 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,590 ft
1 wells filed one
Completion to plug
36.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,590 ft.

Completions filed
Jun 1980
1 of 1 wells
Plug dates filed
Mar 2017
1 of 1 wells

Last completion to plug: a median of 36.8 years across the 1 well that filed both dates, with the middle half between 36.8 years and 36.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1733104618,590 ftJun 1980Mar 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (303)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

303 months

Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 201432086.164.05$2,757
Aug 201406089.394.04$242
Jul 20141826096.564.18$17,825
Jun 201406098.164.74$284
May 201406094.734.73$284
Apr 201406095.944.81$289
Mar 20141626095.895.06$15,838
Feb 201406097.406.19$372
Jan 201406090.404.86$292
Dec 201306091.824.35$261
Nov 201306088.853.74$224
Oct 20131786097.423.78$17,568
Sep 2013060104.113.72$223
Aug 2013060104.253.52$211
Jul 201317360102.523.72$17,959
Jun 201306094.403.93$236
May 201306094.834.15$249
Apr 201306093.964.28$257
Mar 20131686093.623.91$15,963
Feb 201306091.233.42$205
Jan 20131716091.603.42$15,869
Dec 201206086.773.42$205
Nov 20121526086.953.62$13,434
Oct 201206089.383.40$204
Sep 201206094.672.92$175
Aug 20121576092.662.91$14,722
Jul 20121616085.133.02$13,887
Jun 201206079.822.52$151
May 20121606091.612.49$14,807
Apr 2012060101.652.00$120
Mar 201217860105.052.22$18,832
Feb 201218060101.102.57$18,352
Jan 201206098.092.73$164
Dec 201106096.873.24$194
Nov 201106095.723.31$199
Oct 201106084.983.65$219
Sep 201106083.623.99$239
Aug 201106083.404.15$249
Jul 201106094.144.52$271
Jun 20111696092.904.64$15,978
May 201106098.134.40$264
Apr 2011060105.964.33$260
Mar 201106096.364.06$243
Feb 201106085.644.18$251
Jan 201106086.504.59$275
Dec 201006085.734.35$261
Nov 20101676080.843.80$13,728
Oct 201006078.103.51$211
Sep 201006072.633.98$239
Aug 201006073.684.42$265
Jul 20101716072.554.74$12,690
Jun 201006070.364.91$295
May 20101686071.124.24$12,202
Apr 201006081.694.12$247
Mar 201006078.394.39$263
Feb 201006073.585.44$327
Jan 20101736074.365.96$13,222
Dec 200906071.445.48$329
Nov 200906074.593.75$225
Oct 20091766072.544.11$13,014
Sep 200906065.543.06$184
Aug 200906067.423.22$193
Jul 20091746061.133.46$10,844
Jun 200906066.163.90$234
May 200906054.743.93$236
Apr 20091736046.773.59$8,306
Mar 200906042.144.06$244
Feb 20091796032.814.63$6,151
Jan 200906035.865.37$322
Dec 20081716037.105.98$6,703
Nov 200806055.496.86$412
Oct 200806075.246.92$415
Sep 200817360101.767.88$18,077
Aug 200818060114.228.48$21,069
Jul 2008060131.0811.39$683
Jun 200816460131.3313.03$22,320
May 2008060123.1711.57$694
Apr 2008060110.3110.45$627
Mar 2008060101.909.66$580
Feb 200806092.538.77$526
Jan 200806090.388.21$492
Dec 200706088.337.30$438
Nov 200706091.677.29$438
Oct 20071696082.856.92$14,417
Sep 200706075.846.24$375
Aug 200706069.066.39$383
Jul 200706070.906.39$383
Jun 200706062.007.55$453
May 200706058.747.85$471
Apr 200706059.617.81$468
Mar 200706056.927.30$438
Feb 200706055.108.22$493
Jan 200706050.306.73$404
Dec 200606056.656.92$415
Nov 20061566054.207.62$8,912
Oct 20061636054.906.01$9,310
Sep 200606060.085.04$302
Aug 200606068.717.34$440
Jul 200606069.376.34$381
Jun 20061756066.286.38$11,982
May 200606066.016.42$386
Apr 200606064.397.36$442
Mar 200606056.707.08$425
Feb 200606057.597.75$465
Jan 200606060.598.93$536
Dec 200506054.9413.42$805
Nov 200506054.6910.59$635
Oct 200506058.3413.80$828
Sep 200506061.4512.08$725
Aug 20051686061.519.80$10,921
Jul 200506055.697.84$471
Jun 200506052.337.38$443
May 20051696045.226.65$8,041
Apr 200506049.207.36$442
Mar 20051666050.377.15$8,791
Feb 200506045.226.31$379
Jan 200506043.166.32$379
Dec 200406039.866.75$405
Nov 20041426045.286.33$6,810
Oct 200406049.706.52$391
Sep 200406043.245.28$317
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20041676036.106.43$6,415
May 200406037.486.49$390
Apr 200406034.475.86$352
Mar 20041696034.365.53$6,139
Feb 200406032.455.51$331
Jan 200406032.036.30$378
Dec 200306030.266.30$378
Nov 200306028.804.60$276
Oct 20031666028.174.76$4,962
Sep 20031726026.314.75$4,810
Aug 20031696029.765.13$5,337
Jul 200306029.415.17$310
Jun 200306028.565.98$359
May 20031556026.595.97$4,480
Apr 200306026.675.41$324
Mar 200306031.146.10$366
Feb 200306033.487.93$476
Jan 20031626030.315.58$5,245
Dec 20021706026.914.85$4,866
Nov 200206024.664.14$248
Oct 200206026.464.23$254
Sep 200206027.443.64$218
Aug 200206025.963.16$190
Jul 200206024.583.06$184
Jun 20021696023.733.34$4,211
May 200206024.663.58$215
Apr 200206023.653.51$211
Mar 20021876022.003.10$4,300
Feb 200206018.222.38$143
Jan 200206017.172.38$143
Dec 200106016.932.36$142
Nov 200106018.072.41$144
Oct 200106019.782.53$152
Sep 20011826024.262.25$4,550
Aug 200106024.873.05$183
Jul 20011756023.933.20$4,380
Jun 200106024.563.82$229
May 200106025.524.31$258
Apr 20011866024.685.34$4,911
Mar 200106024.545.38$323
Feb 200106027.755.77$346
Jan 20011886027.478.40$5,668
Dec 200006026.889.12$547
Nov 20001836032.215.66$6,234
Oct 200006031.235.15$309
Sep 200006031.875.19$311
Aug 20001846029.644.54$5,726
Jul 20001876028.534.09$5,581
Jun 200006029.304.40$264
May 200006027.263.68$221
Apr 20001896024.513.12$4,819
Mar 200006028.422.86$172
Feb 200006027.622.73$164
Jan 20001886025.272.48$4,900
Dec 199906024.282.42$145
Nov 199906023.192.43$146
Oct 19991876020.982.80$4,091
Sep 199906021.752.62$157
Aug 19991866019.262.88$3,755
Jul 199926017.892.37$178
Jun 199906015.942.36$142
May 19991836015.792.32$3,029
Apr 199906015.102.21$132
Mar 199906012.471.84$110
Feb 1999197609.981.82$2,075
Jan 199906010.381.90$114
Dec 19980609.201.77$106
Nov 19981876010.892.19$2,168
Oct 199806012.421.97$118
Sep 199806012.592.08$125
Aug 1998187011.301.91$2,113
Jul 199806011.742.24$134
Jun 19981866011.242.24$2,225
May 199806012.622.21$132
Apr 199806013.042.51$150
Mar 19981766012.802.31$2,391
Feb 199806013.952.30$138
Jan 19981886014.702.15$2,893
Dec 199706016.322.41$145
Nov 199706018.193.09$185
Oct 19971906019.253.15$3,846
Sep 199706017.742.95$177
Aug 19971836017.862.55$3,422
Jul 199706017.582.25$135
Jun 199706017.242.26$135
May 199718512018.972.31$3,786
Apr 1997013117.882.08$273
Mar 199719521018.951.94$4,102
Feb 1997022220.492.21$490
Jan 1997021823.483.54$772
Dec 199619913523.32$4,641
Nov 1996015521.97$0
Oct 1996015923.31$0
Sep 199619419822.22$4,311
Aug 1996022020.26$0
Jul 199619521719.55$3,812
Jun 1996020518.73$0
May 1996019919.43$0
Apr 199619210221.51$4,130
Mar 1996021819.38$0
Feb 199613617916.98$2,309
Jan 1996016217.07$0
Dec 1995015717.19$0
Nov 199518627416.00$2,976
Oct 1995025515.43$0
Sep 199518520516.18$2,993
Aug 1995027115.92$0
Jul 199519025215.24$2,896
Jun 1995022716.41$0
May 1995036017.56$0
Apr 199519433917.73$3,440
Mar 1995020316.44$0
Feb 199518518716.58$3,067
Jan 1995026715.92$0
Dec 199419119515.03$2,871
Nov 1994019415.90$0
Oct 1994018315.58$0
Sep 199418317315.29$2,798
Aug 1994011016.13$0
Jul 199419020617.56$3,336
Jun 199409917.09$0
May 19941886315.88$2,985
Apr 199406014.14$0
Mar 1994025912.46$0
Feb 199419252812.50$2,400
Jan 1994023112.66$0
Dec 19931928112.33$2,367
Nov 199308414.49$0
Oct 19931818715.85$2,869
Sep 199307415.03$0
Aug 1993015215.66$0
Jul 199317717415.46$2,736
Jun 1993017116.79$0
May 199318618617.68$3,288
Apr 1993013218.05$0
Mar 199318818218.14$3,410
Feb 1993011117.90$0
Jan 19931886816.93$3,183

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2014 — as filed, then multipliedworked
Oil                   32 bbl  × $ 86.16 =     $2,757
Casinghead gas         0 Mcf  × $  4.05 =         $0

────────────────────────────────────────────────────
Month total                                   $2,757

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/25960 is the state's own key, not one this site invented.