ECHOLS, CORA LEE C

Operated by BASA RESOURCES, INC. (P-5 53974) in the IATAN, EAST HOWARD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 26017District 08Field 44148500Hydrogen sulphide fieldNGPA filingOilCasinghead gasSaveExport
Value, all time
$773 k
Jan 1993 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 154 leases and 2,716 wells, and the rule below applies to all of them.

Discovered
1926-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
400 ft
minimum
From a lease line
200 ft
minimum

A drilling unit in this field needs at least 5 acres. The field rule took effect on 2008-07-29.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: DKT 08-0257306 APPROVED 07/29/2008 - UPDATE SPACING TO 200/400FT

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition26,390 bbl$773,133
Casinghead gasProduction119 Mcf$264
Total$773,396

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (5)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2726, -101.2669. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.3 miles.

32.27235, -101.26690 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
80.0%
4 of 5 wells
With a plug date
80.0%
4 of 5 wells
Median depth
3,140 ft
5 wells filed one
Completion to plug
15.7 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
480.0%
A plug date is filed
480.0%
BothOn the schedule and plugged. Neither fact cancels the other.
480.0%
NeitherNo plug date, and not on the schedule.
120.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,040 and 3,157 ft, median 3,140 ft, over the 5 wells that filed a depth.

Completions filed
Jan 1980 – Feb 1981
3 of 5 wells; 2 filed none
Plug dates filed
Mar 1983 – Aug 2008
4 of 5 wells; 1 filed none

Last completion to plug: a median of 15.7 years across the 2 wells that filed both dates, with the middle half between 9.6 years and 21.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

5 wells

42-2273228193,134 ftApr 1983Yes
42-22732282103,140 ftMar 1983Yes
42-2273227953,146 ftFeb 1981
42-2273227843,157 ftOct 1980Aug 2008Yes
42-2273206413,040 ftJan 1980Jul 1983Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026100106.413.05$1,064
Apr 202613098.932.87$1,286
Mar 202636089.753.15$3,231
Feb 202628063.503.75$1,778
Jan 202610059.138.00$591
Dec 202510056.664.41$567
Nov 20258058.593.93$469
Oct 202512059.383.30$713
Sep 202521062.743.08$1,318
Aug 20258063.933.01$511
Jul 202522066.743.32$1,468
Jun 202520066.483.13$1,330
May 202528060.553.23$1,695
Apr 202528062.363.54$1,746
Mar 20257067.704.27$474
Feb 202513070.884.34$921
Jan 202511074.324.28$818
Dec 202423068.993.12$1,587
Nov 202417069.052.20$1,174
Oct 202420071.372.28$1,427
Sep 202417069.612.36$1,183
Aug 202422075.632.06$1,664
Jul 202415079.932.15$1,199
Jun 202414078.082.63$1,093
May 202414078.812.20$1,103
Apr 202412084.451.66$1,013
Mar 202417080.301.55$1,365
Feb 202431076.091.78$2,359
Jan 202418073.023.30$1,314
Dec 2023161671.262.61$1,182
Nov 2023242077.892.81$1,926
Oct 2023221685.443.09$1,929
Sep 2023341589.042.74$3,068
Aug 2023251480.522.67$2,050
Jul 20230074.852.64$0
Jun 20232068.962.26$138
May 2023191670.622.23$1,377
Apr 202323178.122.24$1,799
Mar 202318072.852.39$1,311
Feb 202321075.112.47$1,577
Jan 202316076.533.39$1,224
Dec 20221076.415.73$76
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20221094.529.13$95
Jul 202290101.587.54$914
Jun 2022190115.097.98$2,187
May 2022220109.378.43$2,406
Apr 202230104.226.84$313
Mar 2022210108.885.08$2,286
Feb 202227091.054.86$2,458
Jan 202231081.844.54$2,537
Dec 202133071.323.90$2,354
Nov 202132077.435.24$2,478
Oct 202126079.795.71$2,075
Sep 202124069.865.35$1,677
Aug 202121066.024.22$1,386
Jul 202135070.783.98$2,477
Jun 202132069.493.38$2,224
May 202133063.483.02$2,095
Apr 202138060.362.76$2,294
Mar 202129061.302.72$1,778
Feb 202118057.805.55$1,040
Jan 202124050.412.81$1,210
Dec 20208044.642.68$357
Nov 202019038.772.71$737
Oct 202025036.972.48$924
Sep 202027037.091.99$1,001
Aug 202023039.982.39$920
Jul 202026038.371.83$998
Jun 202050034.901.69$1,745
May 202015016.921.81$254
Apr 202015014.751.80$221
Mar 202013030.341.86$394
Feb 202016049.881.98$798
Jan 202028057.252.09$1,603
Dec 201929059.012.30$1,711
Nov 201926055.302.75$1,438
Oct 201929053.472.42$1,551
Sep 201929055.052.66$1,596
Aug 201928053.112.30$1,487
Jul 201919056.272.46$1,069
Jun 201919052.782.49$1,003
May 201930058.482.74$1,754
Apr 201931062.632.75$1,942
Mar 201928056.803.06$1,590
Feb 201929050.852.79$1,475
Jan 201931046.033.23$1,427
Dec 201832046.594.19$1,491
Nov 201832052.934.24$1,694
Oct 201833061.443.40$2,028
Sep 201824059.543.11$1,429
Aug 201822059.403.07$1,307
Jul 201819065.142.93$1,238
Jun 201823060.183.08$1,384
May 201832065.382.90$2,092
Apr 201830063.842.90$1,915
Mar 201832061.222.79$1,959
Feb 201830061.782.77$1,853
Jan 201829062.874.01$1,823
Dec 201732057.272.92$1,833
Nov 201732055.423.12$1,773
Oct 201723049.292.98$1,134
Sep 201724047.523.09$1,140
Aug 201735045.373.00$1,588
Jul 201732043.873.09$1,404
Jun 201724042.493.09$1,020
May 201720045.373.26$907
Apr 201729047.933.21$1,390
Mar 201724046.772.98$1,122
Feb 201723050.452.95$1,160
Jan 201739049.413.42$1,927
Dec 201630048.763.72$1,463
Nov 201626042.492.64$1,105
Oct 201618046.193.09$831
Sep 201639041.553.10$1,620
Aug 201626041.442.92$1,077
Jul 201628041.622.92$1,165
Jun 201630045.352.69$1,361
May 201635042.521.99$1,488
Apr 201630036.561.99$1,097
Mar 201635033.011.79$1,155
Feb 201632026.472.06$847
Jan 201633027.352.36$903
Dec 201531032.362.00$1,003
Nov 201526038.792.17$1,009
Oct 201522043.552.43$958
Sep 201534042.992.76$1,462
Aug 201518040.162.87$723
Jul 20157048.152.95$337
Jun 201520056.152.88$1,123
May 201529055.212.96$1,601
Apr 201538049.822.71$1,893
Mar 201534042.892.93$1,458
Feb 201525044.662.98$1,117
Jan 201525043.433.10$1,086
Dec 201428054.693.59$1,531
Nov 201422070.464.25$1,550
Oct 201427078.303.90$2,114
Sep 201424086.164.05$2,068
Aug 201411089.394.04$983
Jul 201416096.564.18$1,545
Jun 201430098.164.74$2,945
May 201439094.734.73$3,694
Apr 201421095.944.81$2,015
Mar 201417095.895.06$1,630
Feb 201417097.406.19$1,656
Jan 201422090.404.86$1,989
Dec 201313091.824.35$1,194
Nov 201329088.853.74$2,577
Oct 201316097.423.78$1,559
Sep 2013220104.113.72$2,290
Aug 2013260104.253.52$2,711
Jul 2013250102.523.72$2,563
Jun 201325094.403.93$2,360
May 201327094.834.15$2,560
Apr 201325093.964.28$2,349
Mar 201317093.623.91$1,592
Feb 201312091.233.42$1,095
Jan 20138091.603.42$733
Dec 201222086.773.42$1,909
Nov 201215086.953.62$1,304
Oct 20129089.383.40$804
Sep 20127094.672.92$663
Aug 20124092.662.91$371
Jul 201217085.133.02$1,447
Jun 201218079.822.52$1,437
May 201228091.612.49$2,565
Apr 2012260101.652.00$2,643
Mar 2012260105.052.22$2,731
Feb 2012260101.102.57$2,629
Jan 201227098.092.73$2,648
Dec 201125096.873.24$2,422
Nov 201123095.723.31$2,202
Oct 20113084.983.65$255
Sep 20113083.623.99$251
Aug 201114083.404.15$1,168
Jul 201142094.144.52$3,954
Jun 201138092.904.64$3,530
May 201131098.134.40$3,042
Apr 2011330105.964.33$3,497
Mar 201128096.364.06$2,698
Feb 201110085.644.18$856
Jan 201112086.504.59$1,038
Dec 201015085.734.35$1,286
Nov 201033080.843.80$2,668
Oct 201041078.103.51$3,202
Sep 201028072.633.98$2,034
Aug 201036073.684.42$2,652
Jul 201025072.554.74$1,814
Jun 201026070.364.91$1,829
May 201029071.124.24$2,062
Apr 201027081.694.12$2,206
Mar 201028078.394.39$2,195
Feb 201015073.585.44$1,104
Jan 201018074.365.96$1,338
Dec 200922071.445.48$1,572
Nov 200925074.593.75$1,865
Oct 200925072.544.11$1,814
Sep 200923065.543.06$1,507
Aug 200924067.423.22$1,618
Jul 200924061.133.46$1,467
Jun 200918066.163.90$1,191
May 200923054.743.93$1,259
Apr 200920046.773.59$935
Mar 200924042.144.06$1,011
Feb 20098032.814.63$262
Jan 20091035.865.37$36
Dec 200810037.105.98$371
Nov 200816055.496.86$888
Oct 200816075.246.92$1,204
Sep 2008150101.767.88$1,526
Aug 2008140114.228.48$1,599
Jul 2008130131.0811.39$1,704
Jun 2008110131.3313.03$1,445
May 2008130123.1711.57$1,601
Apr 2008120110.3110.45$1,324
Mar 2008110101.909.66$1,121
Feb 200811092.538.77$1,018
Jan 200812090.388.21$1,085
Dec 200712088.337.30$1,060
Nov 20079091.677.29$825
Oct 200713082.856.92$1,077
Sep 200711075.846.24$834
Aug 200711069.066.39$760
Jul 200713070.906.39$922
Jun 200713062.007.55$806
May 200713058.747.85$764
Apr 200713059.617.81$775
Mar 200713056.927.30$740
Feb 200711055.108.22$606
Jan 200712050.306.73$604
Dec 200614056.656.92$793
Nov 200615054.207.62$813
Oct 200615054.906.01$824
Sep 200623060.085.04$1,382
Aug 200623068.717.34$1,580
Jul 200623069.376.34$1,596
Jun 200624066.286.38$1,591
May 200623066.016.42$1,518
Apr 200622064.397.36$1,417
Mar 200619056.707.08$1,077
Feb 200617057.597.75$979
Jan 200618060.598.93$1,091
Dec 200524054.9413.42$1,319
Nov 200527054.6910.59$1,477
Oct 200539058.3413.80$2,275
Sep 200529061.4512.08$1,782
Aug 200530061.519.80$1,845
Jul 200536055.697.84$2,005
Jun 200540052.337.38$2,093
May 200542045.226.65$1,899
Apr 200556049.207.36$2,755
Mar 200552050.377.15$2,619
Feb 200543045.226.31$1,944
Jan 200553043.166.32$2,287
Dec 200452039.866.75$2,073
Nov 200460045.286.33$2,717
Oct 200459049.706.52$2,932
Sep 200457043.245.28$2,465
Aug 200453042.375.55$2,246
Jul 200461038.286.08$2,335
Jun 200457036.106.43$2,058
May 200473037.486.49$2,736
Apr 200458034.475.86$1,999
Mar 200441034.365.53$1,409
Feb 200440032.455.51$1,298
Jan 200458032.036.30$1,858
Dec 200338030.266.30$1,150
Nov 200333028.804.60$950
Oct 200357028.174.76$1,606
Sep 200352026.314.75$1,368
Aug 200352029.765.13$1,548
Jul 200355029.415.17$1,618
Jun 200357028.565.98$1,628
May 200365026.595.97$1,728
Apr 200361026.675.41$1,627
Mar 200356031.146.10$1,744
Feb 200360033.487.93$2,009
Jan 200368030.315.58$2,061
Dec 200274026.914.85$1,991
Nov 200273024.664.14$1,800
Oct 200276026.464.23$2,011
Sep 200276027.443.64$2,085
Aug 200282025.963.16$2,129
Jul 200274024.583.06$1,819
Jun 200277023.733.34$1,827
May 200278024.663.58$1,923
Apr 200278023.653.51$1,845
Mar 200274022.003.10$1,628
Feb 200265018.222.38$1,184
Jan 200277017.172.38$1,322
Dec 200168016.932.36$1,151
Nov 200170018.072.41$1,265
Oct 200181019.782.53$1,602
Sep 200184024.262.25$2,038
Aug 200181024.873.05$2,014
Jul 200183023.933.20$1,986
Jun 200187024.563.82$2,137
May 200190025.524.31$2,297
Apr 200184024.685.34$2,073
Mar 200188024.545.38$2,160
Feb 200184027.755.77$2,331
Jan 200190027.478.40$2,472
Dec 200081026.889.12$2,177
Nov 200087032.215.66$2,802
Oct 2000107031.235.15$3,342
Sep 200090031.875.19$2,868
Aug 2000114029.644.54$3,379
Jul 2000116028.534.09$3,309
Jun 2000118029.304.40$3,457
May 2000120027.263.68$3,271
Apr 2000123024.513.12$3,015
Mar 2000124028.422.86$3,524
Feb 2000114027.622.73$3,149
Jan 2000126025.272.48$3,184
Dec 1999134024.282.42$3,254
Nov 1999142023.192.43$3,293
Oct 1999105020.982.80$2,203
Sep 1999159021.752.62$3,458
Aug 1999128019.262.88$2,465
Jul 199983017.892.37$1,485
Jun 199980015.942.36$1,275
May 1999110015.792.32$1,737
Apr 1999116015.102.21$1,752
Mar 1999126012.471.84$1,571
Feb 199912209.981.82$1,218
Jan 1999126010.381.90$1,308
Dec 199812809.201.77$1,178
Nov 1998129010.892.19$1,405
Oct 1998142012.421.97$1,764
Sep 1998140012.592.08$1,763
Aug 1998158011.301.91$1,785
Jul 199898011.742.24$1,151
Jun 1998130011.242.24$1,461
May 1998104012.622.21$1,312
Apr 1998137013.042.51$1,786
Mar 1998140012.802.31$1,792
Feb 1998137013.952.30$1,911
Jan 1998151014.702.15$2,220
Dec 1997160016.322.41$2,611
Nov 1997142018.193.09$2,583
Oct 1997162019.253.15$3,119
Sep 1997130017.742.95$2,306
Aug 1997168017.862.55$3,000
Jul 1997174017.582.25$3,059
Jun 1997168017.242.26$2,896
May 1997173018.972.31$3,282
Apr 1997136017.882.08$2,432
Mar 1997188018.951.94$3,563
Feb 1997168020.492.21$3,442
Jan 1997156023.483.54$3,663
Dec 1996144023.32$3,358
Nov 1996158021.97$3,471
Oct 1996157023.31$3,660
Sep 1996143022.22$3,177
Aug 1996168020.26$3,404
Jul 1996148019.55$2,893
Jun 1996177018.73$3,315
May 1996153019.43$2,973
Apr 1996126021.51$2,710
Mar 1996153019.38$2,965
Feb 1996222016.98$3,770
Jan 1996257017.07$4,387
Dec 1995263017.19$4,521
Nov 1995172016.00$2,752
Oct 1995216015.43$3,333
Sep 1995248016.18$4,013
Aug 1995254015.92$4,044
Jul 1995276015.24$4,206
Jun 1995238016.41$3,906
May 1995283017.56$4,969
Apr 1995264017.73$4,681
Mar 1995286016.44$4,702
Feb 1995257016.58$4,261
Jan 1995274015.92$4,362
Dec 1994264015.03$3,968
Nov 1994250015.90$3,975
Oct 1994258015.58$4,020
Sep 1994250115.29$3,823
Aug 1994270116.13$4,355
Jul 1994270117.56$4,741
Jun 1994254117.09$4,341
May 1994247115.88$3,922
Apr 1994209114.14$2,955
Mar 1994272112.46$3,389
Feb 1994214112.50$2,675
Jan 1994234112.66$2,962
Dec 1993248112.33$3,058
Nov 1993302114.49$4,376
Oct 1993203115.85$3,218
Sep 1993217115.03$3,262
Aug 1993230115.66$3,602
Jul 1993306115.46$4,731
Jun 1993235116.79$3,946
May 1993256117.68$4,526
Apr 1993324118.05$5,848
Mar 1993287118.14$5,206
Feb 1993259117.90$4,636
Jan 1993295116.93$4,994

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                   10 bbl  × $106.41 =     $1,064
Casinghead gas         0 Mcf  × $  3.05 =         $0

────────────────────────────────────────────────────
Month total                                   $1,064

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/26017 is the state's own key, not one this site invented.