A. FASKEN "B" UNIT 6B

Operated by MULLOY OPERATING, INC. (P-5 593077) in the GERMANIA (GRAYBURG) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 28830District 08Field 34563400Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$182 k
Jan 1993 – Apr 2007
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
172
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 21 leases and 81 wells, and the rule below applies to all of them.

Discovered
1952-05-24
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition8,951 bbl$182,125
Casinghead gasProduction20 Mcf$0
Total$182,125

20 Mcf of this lease's gas, across 20 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9949, -101.8263. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.99488, -101.82629 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,050 ft
1 wells filed one
Completion to plug
22.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,050 ft.

Completions filed
Feb 1984
1 of 1 wells
Plug dates filed
Oct 2006
1 of 1 wells

Last completion to plug: a median of 22.7 years across the 1 well that filed both dates, with the middle half between 22.7 years and 22.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3291008718,050 ftFeb 1984Oct 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (172)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

172 months

Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 200775050.306.73$3,773
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 2006107057.597.75$6,162
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20041032.455.51$32
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 2003152033.487.93$5,089
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 2002172026.464.23$4,551
Sep 20020027.443.64$0
Aug 2002166025.963.16$4,309
Jul 20020024.583.06$0
Jun 20022023.733.34$47
May 2002161024.663.58$3,970
Apr 20020023.653.51$0
Mar 2002172022.003.10$3,784
Feb 20021018.222.38$18
Jan 20021017.172.38$17
Dec 2001174016.932.36$2,946
Nov 20010018.072.41$0
Oct 2001165019.782.53$3,264
Sep 20011024.262.25$24
Aug 2001165024.873.05$4,104
Jul 20010023.933.20$0
Jun 2001171024.563.82$4,200
May 20010025.524.31$0
Apr 2001163024.685.34$4,023
Mar 20010024.545.38$0
Feb 2001171027.755.77$4,745
Jan 20010027.478.40$0
Dec 2000179026.889.12$4,812
Nov 20000032.215.66$0
Oct 2000176031.235.15$5,496
Sep 20000031.875.19$0
Aug 2000175029.644.54$5,187
Jul 20000028.534.09$0
Jun 20003029.304.40$88
May 2000175027.263.68$4,771
Apr 20000024.513.12$0
Mar 2000170028.422.86$4,831
Feb 20000027.622.73$0
Jan 2000177025.272.48$4,473
Dec 19990024.282.42$0
Nov 199958023.192.43$1,345
Oct 1999163020.982.80$3,420
Sep 19990021.752.62$0
Aug 1999171019.262.88$3,293
Jul 19990017.892.37$0
Jun 1999166015.942.36$2,646
May 19990015.792.32$0
Apr 1999169015.102.21$2,552
Mar 19990012.471.84$0
Feb 199915309.981.82$1,527
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 1998180010.892.19$1,960
Oct 19980012.421.97$0
Sep 1998160012.592.08$2,014
Aug 19980011.301.91$0
Jul 1998165011.742.24$1,937
Jun 19981011.242.24$11
May 1998158012.622.21$1,994
Apr 19980013.042.51$0
Mar 1998169012.802.31$2,163
Feb 19980013.952.30$0
Jan 1998168014.702.15$2,470
Dec 19970016.322.41$0
Nov 1997178018.193.09$3,238
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 1997162017.862.55$2,893
Jul 19970017.582.25$0
Jun 1997167017.242.26$2,879
May 19970018.972.31$0
Apr 1997162017.882.08$2,897
Mar 19970018.951.94$0
Feb 1997165020.492.21$3,381
Jan 19971023.483.54$23
Dec 1996163023.32$3,801
Nov 19960021.97$0
Oct 1996172023.31$4,009
Sep 19960022.22$0
Aug 1996157020.26$3,181
Jul 19960019.55$0
Jun 19960018.73$0
May 1996163019.43$3,167
Apr 19960021.51$0
Mar 1996170019.38$3,295
Feb 19960016.98$0
Jan 19960017.07$0
Dec 1995175017.19$3,008
Nov 19950016.00$0
Oct 1995162015.43$2,500
Sep 19950016.18$0
Aug 1995164015.92$2,611
Jul 19953015.24$46
Jun 1995157016.41$2,576
May 19950017.56$0
Apr 19950017.73$0
Mar 1995163016.44$2,680
Feb 19950016.58$0
Jan 19950015.92$0
Dec 1994173015.03$2,600
Nov 19942015.90$32
Oct 1994166015.58$2,586
Sep 19940115.29$0
Aug 19940116.13$0
Jul 1994161117.56$2,827
Jun 19940117.09$0
May 19940115.88$0
Apr 1994166114.14$2,347
Mar 19940112.46$0
Feb 19940112.50$0
Jan 1994167112.66$2,114
Dec 19930112.33$0
Nov 19930014.49$0
Oct 1993168115.85$2,663
Sep 19930115.03$0
Aug 1993167115.66$2,615
Jul 19930115.46$0
Jun 19930116.79$0
May 1993173117.68$3,059
Apr 19930118.05$0
Mar 1993168118.14$3,048
Feb 19930117.90$0
Jan 19930116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2007 — as filed, then multipliedworked
Oil                   75 bbl  × $ 50.30 =     $3,773
Casinghead gas         0 Mcf  × $  6.73 =         $0

────────────────────────────────────────────────────
Month total                                   $3,773

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/28830 is the state's own key, not one this site invented.