Operated by GREENLAKE ENERGY OPERATING, LLC (P-5 331448) in the HUBBARD (CHERRY CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 31489District 08Field 43106200NGPA filingOilCasinghead gasSaveExport
Value, all time
$1.3 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 40 leases and 56 wells, and the rule below applies to all of them.

Discovered
1982-06-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-07-28.

The Commission's schedule remark for this field reads: OPTIONAL 40 ACRE, NET GOR 1065

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition31,300 bbl$1,184,968
Casinghead gasProduction30,619 Mcf$109,244
Total$1,294,213

8,680 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7202, -103.6496. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.72018, -103.64956 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,374 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,374 ft.

Completions filed
Mar 2019
1 of 1 wells

1 well

42-3013077015,374 ftMar 2019

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 2019444050.852.79$22,577
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 2018183060.183.08$11,013
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20181062.874.01$63
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20171043.873.09$44
Jun 20174042.493.09$170
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 2016181048.763.72$8,826
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 2016183041.553.10$7,604
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 201603245.352.69$86
May 20160342.521.99$6
Apr 2016171436.561.99$6,260
Mar 20161433.011.79$40
Feb 20160026.472.06$0
Jan 2016177327.352.36$4,848
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 2015180043.552.43$7,839
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 2015157056.152.88$8,816
May 2015545055.212.96$30,089
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 2014184089.394.04$16,448
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 2014183094.734.73$17,336
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 2014183097.406.19$17,824
Jan 20140090.404.86$0
Dec 2013191091.824.35$17,538
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 2013186094.403.93$17,558
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 2013183093.623.91$17,132
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 2012188286.773.42$16,320
Nov 20120786.953.62$25
Oct 2012164389.383.40$14,669
Sep 20120394.672.92$9
Aug 20120892.662.91$23
Jul 2012174785.133.02$14,834
Jun 20120979.822.52$23
May 2012182591.612.49$16,685
Apr 201207101.652.00$14
Mar 20121800105.052.22$18,909
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110195.723.31$3
Oct 20110984.983.65$33
Sep 20111766683.623.99$14,980
Aug 201106083.404.15$249
Jul 201118112594.144.52$17,604
Jun 2011010092.904.64$464
May 201117919498.134.40$18,420
Apr 20110189105.964.33$819
Mar 201103096.364.06$122
Feb 20111895085.644.18$16,395
Jan 2011039886.504.59$1,826
Dec 20100085.734.35$0
Nov 2010175080.843.80$14,147
Oct 201004378.103.51$151
Sep 201003372.633.98$131
Aug 20101802673.684.42$13,377
Jul 2010011672.554.74$549
Jun 2010012970.364.91$633
May 2010176071.124.24$12,517
Apr 2010016481.694.12$676
Mar 2010176078.394.39$13,797
Feb 2010177073.585.44$13,024
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 200917411374.593.75$13,403
Oct 20090072.544.11$0
Sep 200908765.543.06$267
Aug 200917711967.423.22$12,316
Jul 2009031961.133.46$1,105
Jun 200917522766.163.90$12,462
May 2009033054.743.93$1,296
Apr 200917733646.773.59$9,484
Mar 2009029642.144.06$1,201
Feb 2009026432.814.63$1,223
Jan 200919519535.865.37$8,040
Dec 2008017137.105.98$1,022
Nov 200817927155.496.86$11,792
Oct 2008039875.246.92$2,755
Sep 2008181338101.767.88$21,081
Aug 2008193327114.228.48$24,818
Jul 20080310131.0811.39$3,531
Jun 20080155131.3313.03$2,020
May 20080154123.1711.57$1,782
Apr 2008177180110.3110.45$21,407
Mar 20080256101.909.66$2,474
Feb 2008176592.538.77$16,329
Jan 200806790.388.21$550
Dec 20070888.337.30$58
Nov 200717712091.677.29$17,101
Oct 200717214782.856.92$15,268
Sep 2007019875.846.24$1,236
Aug 200717511469.066.39$12,814
Jul 2007010570.906.39$671
Jun 2007173362.007.55$10,749
May 200708258.747.85$643
Apr 200716410959.617.81$10,627
Mar 2007010856.927.30$789
Feb 20071741155.108.22$9,678
Jan 20070350.306.73$20
Dec 20061643156.656.92$9,505
Nov 200605054.207.62$381
Oct 20061712554.906.01$9,538
Sep 200604360.085.04$217
Aug 2006173868.717.34$11,946
Jul 200603069.376.34$190
Jun 20061792666.286.38$12,030
May 20061777766.016.42$12,179
Apr 200608664.397.36$633
Mar 20061796056.707.08$10,574
Feb 200605157.597.75$395
Jan 200605860.598.93$518
Dec 20051803354.9413.42$10,332
Nov 200505354.6910.59$561
Oct 200517726858.3413.80$14,023
Sep 200505461.4512.08$652
Aug 20051783261.519.80$11,262
Jul 20051856455.697.84$10,805
Jun 200505052.337.38$369
May 200518011845.226.65$8,924
Apr 2005014849.207.36$1,089
Mar 200518111450.377.15$9,933
Feb 200509545.226.31$600
Jan 2005178043.166.32$7,682
Dec 2004010539.866.75$709
Nov 20041765045.286.33$8,286
Oct 20041764649.706.52$9,047
Sep 2004010443.245.28$550
Aug 200417510642.375.55$8,003
Jul 2004010738.286.08$651
Jun 20041764936.106.43$6,669
May 200407437.486.49$481
Apr 200417816734.475.86$7,114
Mar 2004012234.365.53$675
Feb 200418415632.455.51$6,830
Jan 200417314932.036.30$6,480
Dec 2003018330.266.30$1,153
Nov 200318112128.804.60$5,769
Oct 2003011328.174.76$538
Sep 200317910326.314.75$5,199
Aug 20031868629.765.13$5,977
Jul 200308829.415.17$455
Jun 20031847428.565.98$5,698
May 2003012826.595.97$765
Apr 20031749626.675.41$5,160
Mar 200318418031.146.10$6,827
Feb 2003015933.487.93$1,260
Jan 200317412130.315.58$5,949
Dec 200218517626.914.85$5,833
Nov 2002019824.664.14$819
Oct 200218213726.464.23$5,395
Sep 200218511327.443.64$5,487
Aug 200205125.963.16$161
Jul 200217911524.583.06$4,752
Jun 200207923.733.34$264
May 20021867824.663.58$4,866
Apr 200208423.653.51$295
Mar 200217412022.003.10$4,200
Feb 20021848418.222.38$3,552
Jan 2002014117.172.38$335
Dec 200118413416.932.36$3,432
Nov 200116011718.072.41$3,173
Oct 200108619.782.53$217
Sep 200118511924.262.25$4,756
Aug 2001014524.873.05$443
Jul 200118613923.933.20$4,895
Jun 200118615124.563.82$5,146
May 2001016825.524.31$724
Apr 200118214024.685.34$5,239
Mar 200117015024.545.38$4,978
Feb 200116516927.755.77$5,553
Jan 2001018827.478.40$1,579
Dec 200016618326.889.12$6,132
Nov 200017417732.215.66$6,606
Oct 2000011131.235.15$571
Sep 200017716131.875.19$6,476
Aug 2000010829.644.54$490
Jul 20001729128.534.09$5,279
Jun 200011617829.304.40$4,182
May 20008122427.263.68$3,032
Apr 2000023724.513.12$738
Mar 200017020028.422.86$5,403
Feb 20001719027.622.73$4,968
Jan 200017714325.272.48$4,828
Dec 199917815824.282.42$4,705
Nov 199914214823.192.43$3,653
Oct 1999013520.982.80$379
Sep 199917412921.752.62$4,122
Aug 199914912019.262.88$3,215
Jul 199915714017.892.37$3,141
Jun 199918512915.942.36$3,254
May 199912018515.792.32$2,324
Apr 199915719815.102.21$2,808
Mar 199912114912.471.84$1,783
Feb 19991881329.981.82$2,116
Jan 19991858810.381.90$2,088
Dec 199801229.201.77$216
Nov 19980510.892.19$11
Oct 19981843412.421.97$2,352
Sep 1998012012.592.08$250
Aug 199813719411.301.91$1,918
Jul 199818517711.742.24$2,568
Jun 199814916511.242.24$2,044
May 19981548912.622.21$2,140
Apr 1998012713.042.51$318
Mar 199815417612.802.31$2,378
Feb 199815710013.952.30$2,420
Jan 19981589414.702.15$2,525
Dec 199718617816.322.41$3,465
Nov 199718819818.193.09$4,031
Oct 199718419919.253.15$4,169
Sep 1997023817.742.95$703
Aug 199718724217.862.55$3,958
Jul 199717824317.582.25$3,675
Jun 19971813017.242.26$3,188
May 19971849618.972.31$3,712
Apr 199718513517.882.08$3,589
Mar 1997012518.951.94$242
Feb 19971838620.492.21$3,939
Jan 19971875323.483.54$4,578
Dec 199618013023.32$4,198
Nov 19961835921.97$4,021
Oct 19961833823.31$4,266
Sep 19961726922.22$3,822
Aug 19961848220.26$3,728
Jul 19961815319.55$3,539
Jun 19961835918.73$3,428
May 199609619.43$0
Apr 19961849221.51$3,958
Mar 19961629319.38$3,140
Feb 199618111716.98$3,073
Jan 199618510117.07$3,158
Dec 199516518017.19$2,836
Nov 199517220716.00$2,752
Oct 199519123715.43$2,947
Sep 199519121816.18$3,090
Aug 199518620215.92$2,961
Jul 199518433015.24$2,804
Jun 199517930216.41$2,937
May 199518222517.56$3,196
Apr 199517921217.73$3,174
Mar 199518122616.44$2,976
Feb 199517810116.58$2,951
Jan 19951778215.92$2,818
Dec 199418214915.03$2,735
Nov 199417816615.90$2,830
Oct 199418118215.58$2,820
Sep 199418215415.29$2,783
Aug 199417713416.13$2,855
Jul 199418115317.56$3,178
Jun 199417822217.09$3,042
May 199417824715.88$2,827
Apr 199418219314.14$2,573
Mar 199418214712.46$2,268
Feb 199417612712.50$2,200
Jan 199436812012.66$4,659
Dec 1993017712.33$0
Nov 199336714314.49$5,318
Oct 199318115015.85$2,869
Sep 199317920615.03$2,690
Aug 199317835015.66$2,787
Jul 199318243015.46$2,814
Jun 199335932316.79$6,028
May 199318329317.68$3,235
Apr 199318431818.05$3,321
Mar 199318030918.14$3,265
Feb 199318721817.90$3,347
Jan 199318225816.93$3,081

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2019 — as filed, then multipliedworked
Oil                  444 bbl  × $ 50.85 =    $22,577
Casinghead gas         0 Mcf  × $  2.79 =         $0

────────────────────────────────────────────────────
Month total                                  $22,577

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/31489 is the state's own key, not one this site invented.