5950 H. J. EATON

Operated by EAGLE ROCK OPERATING COMPANY,LLC (P-5 238710) in the PAYTON (5950) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 32056District 08Field 69873900OilCasinghead gasSaveExport
Value, all time
$43 k
Jan 1993 – Aug 2008
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
188
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 20 leases and 26 wells, and the rule below applies to all of them.

Discovered
1954-02-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 05/01/86.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,978 bbl$41,973
Casinghead gasProduction5,185 Mcf$602
Total$42,576

5,059 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2886, -102.8500. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.28862, -102.85000 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,318 ft
1 wells filed one
Completion to plug
19.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,318 ft.

Completions filed
Nov 1988
1 of 1 wells
Plug dates filed
Feb 2008
1 of 1 wells

Last completion to plug: a median of 19.3 years across the 1 well that filed both dates, with the middle half between 19.3 years and 19.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3710169017,318 ftNov 1988Feb 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (188)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

188 months

Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 2008560131.3313.03$7,354
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070191.677.29$7
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 20070169.066.39$6
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 20060154.207.62$8
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 20060168.717.34$7
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 20060166.016.42$6
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 20050161.519.80$10
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050145.226.31$6
Jan 20050143.166.32$6
Dec 20040139.866.75$7
Nov 20040145.286.33$6
Oct 20040149.706.52$7
Sep 20040143.245.28$5
Aug 20040142.375.55$6
Jul 20040138.286.08$6
Jun 20040136.106.43$6
May 20040137.486.49$6
Apr 20040134.475.86$6
Mar 20040134.365.53$6
Feb 20040132.455.51$6
Jan 20040132.036.30$6
Dec 20030130.266.30$6
Nov 20030128.804.60$5
Oct 20030128.174.76$5
Sep 20030126.314.75$5
Aug 20030129.765.13$5
Jul 20030129.415.17$5
Jun 20030128.565.98$6
May 20030126.595.97$6
Apr 20030126.675.41$5
Mar 20030131.146.10$6
Feb 20030133.487.93$8
Jan 20030130.315.58$6
Dec 20020126.914.85$5
Nov 20020124.664.14$4
Oct 20020126.464.23$4
Sep 20020127.443.64$4
Aug 20020125.963.16$3
Jul 20020124.583.06$3
Jun 20020123.733.34$3
May 20020124.663.58$4
Apr 20020123.653.51$4
Mar 20020122.003.10$3
Feb 20020118.222.38$2
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 20010119.782.53$3
Sep 20010124.262.25$2
Aug 20010124.873.05$3
Jul 20010123.933.20$3
Jun 2001163124.563.82$4,007
May 20010125.524.31$4
Apr 20010124.685.34$5
Mar 20010124.545.38$5
Feb 20010127.755.77$6
Jan 20010127.478.40$8
Dec 20000126.889.12$9
Nov 20000132.215.66$6
Oct 20000131.235.15$5
Sep 20000131.875.19$5
Aug 20000129.644.54$5
Jul 20000128.534.09$4
Jun 20000129.304.40$4
May 20000127.263.68$4
Apr 20000124.513.12$3
Mar 20000128.422.86$3
Feb 20000127.622.73$3
Jan 20000125.272.48$2
Dec 19990124.282.42$2
Nov 19990123.192.43$2
Oct 19990120.982.80$3
Sep 19990121.752.62$3
Aug 19990119.262.88$3
Jul 19990117.892.37$2
Jun 19990115.942.36$2
May 19990115.792.32$2
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999019.981.82$2
Jan 19990110.381.90$2
Dec 1998019.201.77$2
Nov 19980110.892.19$2
Oct 19980112.421.97$2
Sep 19980112.592.08$2
Aug 19980111.301.91$2
Jul 19980111.742.24$2
Jun 199819111.242.24$216
May 19980112.622.21$2
Apr 19980113.042.51$3
Mar 19980112.802.31$2
Feb 19980113.952.30$2
Jan 19980114.702.15$2
Dec 19970116.322.41$2
Nov 19970118.193.09$3
Oct 19970119.253.15$3
Sep 19970117.742.95$3
Aug 1997145117.862.55$2,592
Jul 19970117.582.25$2
Jun 1997175117.242.26$3,019
May 19970118.972.31$2
Apr 19970117.882.08$2
Mar 1997177118.951.94$3,356
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 1996156121.97$3,427
Oct 19960123.31$0
Sep 19960122.22$0
Aug 19960120.26$0
Jul 199625119.55$489
Jun 19960118.73$0
May 1996162119.43$3,148
Apr 19960121.51$0
Mar 19960119.38$0
Feb 19960116.98$0
Jan 19960117.07$0
Dec 19950217.19$0
Nov 19950216.00$0
Oct 19950715.43$0
Sep 19950016.18$0
Aug 19950115.92$0
Jul 199501415.24$0
Jun 199503716.41$0
May 199501617.56$0
Apr 19950017.73$0
Mar 1995107516.44$1,759
Feb 199506416.58$0
Jan 199501515.92$0
Dec 19940515.03$0
Nov 199401615.90$0
Oct 199404315.58$0
Sep 199406115.29$0
Aug 199408716.13$0
Jul 199413513417.56$2,371
Jun 199405117.09$0
May 1994014815.88$0
Apr 199417119914.14$2,418
Mar 19940112.46$0
Feb 19940112.50$0
Jan 19940112.66$0
Dec 19930112.33$0
Nov 1993179114.49$2,594
Oct 199306215.85$0
Sep 1993020515.03$0
Aug 1993054915.66$0
Jul 199313143815.46$2,025
Jun 1993058916.79$0
May 1993020917.68$0
Apr 19930018.05$0
Mar 199317774218.14$3,211
Feb 1993053117.90$0
Jan 1993081016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2008 — as filed, then multipliedworked
Oil                   56 bbl  × $131.33 =     $7,354
Casinghead gas         0 Mcf  × $ 13.03 =         $0

────────────────────────────────────────────────────
Month total                                   $7,354

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/32056 is the state's own key, not one this site invented.