BRELSFORD, M.

Operated by CITATION OIL & GAS CORP. (P-5 154235) in the DIMMIT, NORTHEAST (DELAWARE SD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 35329District 08Field 24862300OilCasinghead gasSaveExport
Value, all time
$2.7 M
Apr 1997 – Dec 2007
Value, last 12 filed months
$177 k
at the published price for each month
Months reported
129
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 31 leases and 67 wells, and the rule below applies to all of them.

Discovered
1982-06-11
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: CONSOLIDATED TO DIMMITT (DELAWARE CONS.)

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition54,180 bbl$1,676,462
Casinghead gasProduction206,623 Mcf$1,015,649
Total$2,692,111

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8560, -103.4943. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85599, -103.49433 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,800 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,800 ft.

Completions filed
Feb 2024
1 of 1 wells

1 well

42-3013070316,800 ftFeb 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (129)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

129 months

Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20074071,86062.007.55$39,274
May 20071861,81458.747.85$25,159
Apr 20072191,79459.617.81$27,057
Mar 20073011,69056.927.30$29,473
Feb 20073261,50455.108.22$30,319
Jan 20073061,52750.306.73$25,664
Dec 20063301,61356.656.92$29,854
Nov 20063131,65854.207.62$29,594
Oct 20063141,77054.906.01$27,883
Sep 20063231,75260.085.04$28,231
Aug 20063061,84968.717.34$34,597
Jul 20063231,51569.376.34$32,016
Jun 20063691,67766.286.38$35,163
May 20063301,87166.016.42$33,804
Apr 20063491,60764.397.36$34,300
Mar 20063681,80656.707.08$33,657
Feb 20063821,61857.597.75$34,541
Jan 20063791,72960.598.93$38,409
Dec 20053731,66154.9413.42$42,776
Nov 20053651,50654.6910.59$35,908
Oct 20053641,57558.3413.80$42,964
Sep 20053511,26661.4512.08$36,861
Aug 20053601,54561.519.80$37,280
Jul 20053571,43355.697.84$31,121
Jun 20053571,41552.337.38$29,126
May 20057201,47045.226.65$42,336
Apr 20053401,48149.207.36$27,629
Mar 20053561,50850.377.15$28,721
Feb 20053991,39345.226.31$26,835
Jan 20053281,57143.166.32$24,089
Dec 20043431,54239.866.75$24,082
Nov 20043411,51245.286.33$25,012
Oct 20043601,67549.706.52$28,805
Sep 20043521,84443.245.28$24,964
Aug 20043181,81742.375.55$23,559
Jul 20043701,58638.286.08$23,813
Jun 20047091,45236.106.43$34,936
May 20043521,52937.486.49$23,123
Apr 20043501,50434.475.86$20,876
Mar 20043421,63934.365.53$20,815
Feb 20043201,51732.455.51$18,742
Jan 20043551,64132.036.30$21,708
Dec 20036641,59930.266.30$30,169
Nov 20033161,57428.804.60$16,334
Oct 20033431,59028.174.76$17,230
Sep 20033591,54526.314.75$16,783
Aug 20033391,69529.765.13$18,784
Jul 20037051,73229.415.17$29,690
Jun 200338781828.565.98$15,947
May 20033651,80626.595.97$20,492
Apr 20033241,77026.675.41$18,212
Mar 20036311,75831.146.10$30,366
Feb 20033151,54633.487.93$22,800
Jan 20033491,75730.315.58$20,386
Dec 20023631,77326.914.85$18,374
Nov 20023671,76524.664.14$16,352
Oct 20026931,78926.464.23$25,903
Sep 20023551,74627.443.64$16,088
Aug 20023501,82525.963.16$14,861
Jul 20026991,86224.583.06$22,882
Jun 20023601,86923.733.34$14,782
May 20023561,76124.663.58$15,090
Apr 20027321,79823.653.51$23,627
Mar 20023601,84222.003.10$13,635
Feb 20023671,68218.222.38$10,683
Jan 20027091,83217.172.38$16,526
Dec 20017161,90216.932.36$16,619
Nov 20013891,53418.072.41$10,719
Oct 20013692,77219.782.53$14,309
Sep 20017261,81224.262.25$21,692
Aug 20013542,32824.873.05$15,912
Jul 20013461,76223.933.20$13,913
Jun 20016941,79624.563.82$23,913
May 20013511,90925.524.31$17,180
Apr 20017211,93724.685.34$28,129
Mar 20013691,94424.545.38$19,507
Feb 20017361,74727.755.77$30,499
Jan 20013761,98927.478.40$27,034
Dec 20007383,21526.889.12$49,166
Nov 20003743,22032.215.66$30,265
Oct 20007302,16231.235.15$33,922
Sep 20003852,07131.875.19$23,011
Aug 20007492,16029.644.54$32,008
Jul 20007802,34828.534.09$31,856
Jun 20007642,36129.304.40$32,767
May 20003902,26927.263.68$18,981
Apr 20007182,28824.513.12$24,728
Mar 20007542,45228.422.86$28,441
Feb 20007522,38127.622.73$27,262
Jan 20001,2022,71225.272.48$37,102
Dec 19991,2252,45124.282.42$35,684
Nov 19998452,94023.192.43$26,751
Oct 19991,5772,44320.982.80$39,935
Sep 19991,1821,96221.752.62$30,847
Aug 19992531,45219.262.88$9,048
Jul 19992661,17417.892.37$7,544
Jun 19992661,28415.942.36$7,273
May 19992381,33215.792.32$6,850
Apr 199901,30615.102.21$2,884
Mar 19992651,31312.471.84$5,718
Feb 19992371,1989.981.82$4,543
Jan 19992281,25910.381.90$4,759
Dec 19982381,2389.201.77$4,385
Nov 19982381,22110.892.19$5,261
Oct 19982271,26912.421.97$5,318
Sep 19982281,15012.592.08$5,266
Aug 19982341,22611.301.91$4,983
Jul 19983911,16211.742.24$7,190
Jun 19982171,08111.242.24$4,858
May 19982341,03612.622.21$5,239
Apr 19985011,12013.042.51$9,339
Mar 19982801,37912.802.31$6,769
Feb 19982841,40813.952.30$7,199
Jan 19982751,32914.702.15$6,906
Dec 19975581,36516.322.41$12,398
Nov 19972751,31918.193.09$9,076
Oct 19975781,24119.253.15$15,035
Sep 19974731,11417.742.95$11,683
Aug 19973281,50217.862.55$9,695
Jul 19973141,21517.582.25$8,250
Jun 19975931,18317.242.26$12,894
May 199756077418.972.31$12,410
Apr 199726863617.882.08$6,116

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2007 — as filed, then multipliedworked
Oil                  407 bbl  × $ 62.00 =    $25,234
Casinghead gas     1,860 Mcf  × $  7.55 =    $14,040

────────────────────────────────────────────────────
Month total                                  $39,274

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 08/O/35329 is the state's own key, not one this site invented.